Issue date | Title | |
---|---|---|
ML101120068 | 15 April 2009 | Submittal of Annual Radiological Environmental Operating Report for 2008 |
ML090970804 | 26 March 2009 | Annual Radioactive Effluent Release Report for 2008 |
ML081210549 | 21 April 2008 | Annual Radiological Environmental Operating Report for 2007 |
ML080950399 | 31 March 2008 | Transmittal of Annual Radioactive Effluent Release Report for 2007 |
ML072410043 | 18 April 2007 | SMUD- Sacramento Municipal Utility District, Rancho Seco Nuclear Generating Station, Annual Radiological Environmental Operating Report for 2006, Dated April 18, 2007 |
ML062350205 | 18 April 2006 | Sacramento Municipal Utility District (Smud), Rancho Seco Nuclear Station, 2005 Annual Radiological Environmental Operating Report |
ML060940680 | 31 December 2005 | Annual Radioactive Effluent Release Report |
ML052710320 | 27 April 2005 | 2004 Annual Radiological Environmental Operating Report |
ML051020434 | 7 April 2005 | Radionuclides for Consideration During Rancho Seco Site Characterization or Final Status Surveys |
IR 05000312/2005001 | 3 March 2005 | IR 05000312-05-001, on 01/31-02/03/05; Sacramento Municipal Utility District; Rancho Seco Nuclear Generating Station. Decommissioning Report; No Violations |
ML041040006 | 18 March 2004 | Annual Radioactive Effluent Release Report, January - December 2003 |
ML031180800 | 22 April 2003 | Ltr to U.S. Nuclear Regulatory Commission, E.W. Merschoff from Steve J. Redeker, Manager, Plant Closure and Decommissioning, Sacramento Municipal Utility District, 2002 Annual Radiological Environmental Operating Report, Appendices C, D & E |
ML030920684 | 24 March 2003 | Annual Radioactive Effluent Release Report |
ML023380388 | 26 November 2002 | Defueled Safety Analysis Report, Amendment 5 |
ML021230500 | 23 April 2002 | Annual Radiological Environmental Operating Report for 2001 |
ML020710735 | 27 February 2002 | 2001 Annual Radioactive Effluent Release Report |
ML20207D465 | 31 December 1998 | Annual Radioactive Effluent Release Rept for Period Jan-Dec 1998, for Rancho Seco Nuclear Generating Station |
ML20205A169 | 31 December 1998 | Annual Radiological Environmental Operating Rept, for Jan- Dec 1998,for Rancho Seco Nuclear Station.With |
ML20155D480 | 27 October 1998 | Amend 3 to Rancho Seco DSAR, Representing Updated Licensing Basis for Operation of Permanently Shutdown & Defueled Rancho Seco Nuclear Facility During Permanently Defueled Mode |
ML20216G804 | 31 December 1997 | Annual Radiological Environ Operating Rept,Jan-Dec 1997 for Rancho Seco Nuclear Station |
ML20203H750 | 19 August 1997 | Rev 10 to Radiological Environ Monitoring Program Manual |
ML20203H735 | 10 February 1997 | Rev 9 to CAP-0002, Off-Site Dose Calculation Manual |
ML20203H723 | 21 January 1997 | Rev 9 to Radiological Environ Monitoring Program Manual |
ML20137Y341 | 31 December 1996 | Annual Radiological Environ Operating Rept for Period Jan-Dec 1996 |
ML20129E715 | 14 October 1996 | Defueled SAR for Rancho Seco |
Information Notice 1994-62, Operational Experience on Steam Generator Tube Leaks & Tube Ruptures | 30 August 1994 | Operational Experience on Steam Generator Tube Leaks & Tube Ruptures |
Information Notice 1994-43, Determination of Primary-to-Secondary Steam Generator Leak Rate | 10 June 1994 | Determination of Primary-to-Secondary Steam Generator Leak Rate |
Information Notice 1991-43, Recent Incidents Involving Rapid Increases in Primary-To-Secondary Leak Rate | 5 July 1991 | Recent Incidents Involving Rapid Increases in Primary-To-Secondary Leak Rate |
ML20217A571 | 28 August 1990 | Final Engineering Rept,Assessment of Spent Fuel Pool Liner Leakage |
PNO-V-89-030, on 890518,airborne Process Monitors for Reactor Bldg Stack,Auxiliary Bldg Stack & Auxiliary Bldg Grade Level Vent Inoperable.Caused by Computer Controlled Svc Air Purge Valves in Open Position.Possibly Caused by Software Errors | 19 May 1989 | PNO-V-89-030:on 890518,airborne Process Monitors for Reactor Bldg Stack,Auxiliary Bldg Stack & Auxiliary Bldg Grade Level Vent Inoperable.Caused by Computer Controlled Svc Air Purge Valves in Open Position.Possibly Caused by Software Errors |
IR 05000312/1988039 | 28 March 1989 | SALP Rept 50-312/88-39 for July 1986 - Dec 1988 |
ML20244A802 | 28 March 1989 | SALP Rept 50-312/88-39 for July 1986 - Dec 1988 |
ML20245H885 | 28 February 1989 | Rev 1 to Proposed Amend 130 to License DPR-54,adding Operating Requirements to Tech Specs Designed to Provide Proper Limitations & Conditions on Reactor Bldg Pressure Equalization Operations During Power Operation |
NL-89-046, Forwards Rept of 1988 Annual Emergency Exercise Conducted on 881003.Exercise Included Util & Offsite Agency Participation & Was Evaluated by NRC & FEMA | 23 January 1989 | Forwards Rept of 1988 Annual Emergency Exercise Conducted on 881003.Exercise Included Util & Offsite Agency Participation & Was Evaluated by NRC & FEMA |
Information Notice 1988-99, Detection and Monitoring of Sudden And/Or Rapidly Increasing Primary-To-Secondary Leakage | 20 December 1988 | Detection and Monitoring of Sudden And/Or Rapidly Increasing Primary-To-Secondary Leakage |
IR 05000312/1988030 | 13 October 1988 | Insp Rept 50-312/88-30 on 880912-16.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Radioactive Liquid & Gaseous Waste & Review of Licensee Repts |
ML20155B848 | 30 September 1988 | Proposed Tech Specs Re Reactor Protection Sys Trip Setting Limits,Rcs High Point Vents,Leakage & Leak Detection,Reactor Coolant Inventory & Auxiliary Electric Sys |
CEO-88-170, Provides Status Update on post-accident Sampling Sys Methods (Primary & Backup),Sample Measurement Accuracy Ranges for Reactor Coolant Total Gas & Reactor Coolant Total Gas Sampling Procedure | 19 August 1988 | Provides Status Update on post-accident Sampling Sys Methods (Primary & Backup),Sample Measurement Accuracy Ranges for Reactor Coolant Total Gas & Reactor Coolant Total Gas Sampling Procedure |
CEO-88-002, Application for Proposed Amend 130 to License DPR-54,adding Operating Requirements Designed to Provide Proper Limitations & Conditions on Reactor Bldg Pressure Equalization Operations During Power Operation.Fee Paid | 21 June 1988 | Application for Proposed Amend 130 to License DPR-54,adding Operating Requirements Designed to Provide Proper Limitations & Conditions on Reactor Bldg Pressure Equalization Operations During Power Operation.Fee Paid |
ML20196A228 | 21 June 1988 | Proposed Tech Specs Providing Proper Limitations & Conditions on Reactor Bldg Pressure Equalization Operations During Power Operation & Modifying Existing Purge Sys Operation Requirement |
ML20195J492 | 10 June 1988 | Proposed Tech Spec Pages 4-69 Through 4-85a,modifying Radiological Effluent Tech Specs to Reduce Count Time Required for prebatch-release Sample Analysis |
ML20151B072 | 31 March 1988 | Forwards Rev 6 to Util Position on Reg Guide 1.97 Re Display of Category 1 Variables on Spds,In Response to Generic Ltr 82-33.Changes Incorporated in Position Rev Based on NUREG-0737 & NUREG-1286 Documentation |
ML20148J846 | 17 March 1988 | Amend 98 to License DPR-54,revising Tech Specs by Reducing Limits of Detection for Liquid Radioactive Effluents & Changing Requirements to Address Hardware Changes in Effluent Sys |
ML20148B432 | 2 March 1988 | Insp Rept 50-312/88-06 on 880124-0219.Violation Noted.Major Areas Inspected:Licensee Action on Previously Identified Inspector Items,Lers,Followup on Items of Noncompliance & Followup on Eastrp Corrective Action |
IR 05000312/1988001 | 5 February 1988 | Insp Rept 50-312/88-01 on 880104-08,20 & 0202.No Violations or Deviations Noted.Major Areas inspected:post-accident Sampling Sys & Tour of Facility.Insp Procedures 25565,30703, 92701 & 92702 Addressed |
ML20149E519 | 29 January 1988 | Forwards Update of post-accident Sampling Sys (PASS) Status Rept Summary ,per 880115 Telcon.All PASS Testing Successfully Completed Ending Need for Future Updates W/Exception of Testing During Hot Shutdown |
ML20147B924 | 4 January 1988 | Forwards Update of post-accident Sampling Sys Status Rept Summary Re Mods,Testing,Procedures,Training,Maint & Spare Parts for Sys |
ML20148G779 | 31 December 1987 | Monthly Operating Rept for Dec 1987 |
ML20195J057 | 31 December 1987 | Annual Radiological Environ Operating Rept,1987 |
ML20236N108 | 30 October 1987 | Forwards Update of 871026 PASS Status Rept Summary for Info. Rept Reformatted Into Narrative Which Summarizes Status of Mods,Testing,Procedures,Training,Maint & Spare Parts |