Forwards Update of 871026 PASS Status Rept Summary for Info. Rept Reformatted Into Narrative Which Summarizes Status of Mods,Testing,Procedures,Training,Maint & Spare Parts
ML20236N108
Person / Time
Site: Rancho Seco
Issue date: 10/30/1987
From: Shetler J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
DSR-87-160, NUDOCS 8711160021
Download: ML20236N108 (4)


Text

-. - . . .-

%  : 9 L

D '

I'i y y ;C H ,y ', er;

$lsMUD,

.. 7, ,

SACRAMENTO MUNICIPAL UTIUTY DISTRICT O P, O. Box 15830, Sacramento CA 9'5E}52.1830, (916) 452-3211 AN ELECTRIC SYSTEM SERVING THE'HEA6T,OF CALIFORNIA i

i. <

> p,

. E' Sh N0ctober30,'1987' h .' _

DSR 87-160 g

!o< , . , ,

! ,3

,< 1 y i U. S. Nuclear Regulatory Commission Attn: J. B. Martin, Administrator Region V Office of' Inspection and Enforcement l 1450' Maria. Lane Suite 210 '

j Walnut Creek, CA 94596 Docket 50-312.

Rancho Seco Nuclear Generating Station Unit #1 i PASS STATUS-REPORT

SUMMARY

Dear-Martin:

-1 Attached for your information 'is the update +of the PASSLStatus Report' ' Summary dated October 26, 1987. The report has been  ;

reformatted into a narrative summarizing the status of I Modifications, Testing, Procedures, Training, Maintenance, and 1 Spare Parts. A copy of this . report has been provided to the o Resident Inspector's Office. 1

(

<> Please contact me if you have any questions. Members of your i staff with questions requiring additional information or l clarification may contact Bob Fraser at (209) 333-2935 extension l

,43C4 or Masa Nakao at extension 4916. i l

Sincerely,

,z J. R. Shetler Director, System Review and Test Program I

Attachments cc: George Kalman, NRC - Bethesda A. D'Angelo, NRC - Rancho Seco M. Gillis, NRC - Walnut Creek 9711160021gyOO 12 ADOCK O PDR R

PDR

)\

TE-O/

RANCHO SECO NUCLEAR GENERATING STATION G 14440 Twin Cities Road, Harald, CA 95638-9799;(209) 333 2935

7.1 < s

-Z i 1lf' " ' ' , .

jun.'Wya, .

PASS STATUS. REPORT- "?? 10/26/87

SUMMARY

gg7 7p '8 G h.30 The' PASS is designed-to. sample'the'following three itemet ci) Reactor Building Atmosphere CMFqypc

^

f L

.2) Decay! Heat System- 'l 1

3) Reactor Coolant System The Reactor Building Atmosphere sampling capability was tested by

.STP (Special1 Test-Procedure) 432 and; verified the system functioned properly.- The procedurevis undergoing results review / approval.

The Decay Heat. System sampling capability was tested by"STP.430.

Two-Non Conformance-Reports were written.on the sample 1 dilution l L acceptance criteria. The NCRs, which have been dispositioned and

t. approved, accepted the sample dilution results. The test has'been l
placed in the results review cycle. The-test demonstrated.the l ability;to-draw a Decay Heat System. sample, analyze.the sample for l boron and chloride, dilute the sample.and transfer the sample to- l a grab sample' flask and the; Intrinsic. Germanium Element-(IGE). ,l  !

The inline conductivity and pH instrumentation will be. tested with-  ! )

STP.1131 (Liquid Sample Depressurization and Total Gas. Test). .

l _j The Reactor Coolant System sampling capability will be. tested by STP.

433 which is:en hold.pending incorporation of initial Test 1 Working Group (TWG). comments. The procedure will be rewritten based the- lL l resultsJof STP.430 but it will.not be performed luntil'the reactor is l

at:15% power so that the' liquid' sample will'be at~its maxiumum l  :

temperature.. The ability of the system to depressurize and degas l a liquid sample will be' tested by STP.ll31.in mid November and STP.

433 will be used to verify the ability.to cool the sample. -l SYSTEM-MODIFICATIONS There:are a total of seven open Engineering Change Notices (ECNs) of which four are work complete and three are in progress. The status of each is as follows:

1) Work Complete i A-4711I ADD BACKUP SOURCE OF FLUSH AND COOLING WATER l Release of this ECN is pending performance of STP.433.

R-0381 ADD DHS SAMPLE CHECK VALVES

' Release of this ECH is pending valve in-service leak checks with the RCS at normal temperature / pressure.

,. R-0488 HYDROGEN MONITOR / PASS SAMPLE LINE HEAT TRACING Release of this ECN is pending approval of STP.793 (Heat Tracing Functional Test) test results.

I d

3 L .___________________________--____w

Wl) ,.. , ,

,7

.i  ;<.

Gj,_. . ' -

R-0732e 2 BACKUP LAB.FOR' PASS GRAB. SAMPLES ,

Release;of'this ECNLis'pending approval of.STP,.430

,{ ' test results.

a

~2) Werk In Progress A-5735 -ADD PASSeION CHROMATOGRAPH' ~!

Werk completion 11s.pending changeout of'a cannon plug, I

and fabrication of a plexiglass. cover lfor a chart c frecorder. Final' release of this ECN is pending the approval of STP.~430 test results.

,2-0285 ' REPLACE DECAY. HEAT SYSTEM SAMPLE VALVES .

,- , Repair nf the leaking valve,is complete. Releases of
this.ECN is pending a valve leak check.

R-0559 SAMPLE COLLECTION.'AND. ANALYSIS. SKID'(SCAS) CHANGES:

The only work pending is the installation.of lighting' in the vicinity'of the SCAS. However additional changes to the SCAS are. anticipated as a result of! .;

system testing. Final release of the ECN11s pending performance of STP.433. .

Two additional minor.ECNs are to be. created. One will relocate the nitrogen bottles used for system flushing.and dilution-to the same;

^ room containing the PASS control panel. .The second will' replace 1the.

backup flush / dilution water' conductivity' indicator and domineralizer,.

presently being leased,: with permanent' equipment.

TESTING y In' addition to the three primary Special' Test Procedures deNeribedi 1 1

in the

SUMMARY

there'are four' additional-tests. One was performed' 'l.

and three'are being' developed. .The status of each is as follows:

l

< STP.426 . SAMPLING TIMES USING THE PASS .

j The~ procedure has been written and will enter the review / l <l' approval cycle upon approval of P4SS Operating Procedures l' CHM-6001 (liquid sampling) and CHM-6005 (containment atmosphere sampling). CHM-6001 and CHM-6005 replace the-old procedure AP.313-1. STP.426 will measure the times required to perform these two procedures ~.

STP.428 MEASURMENT OF (SCAS) VOLUMES A AND B Development of Revision 3 to this procedure is in progress. l The procedure is in word processing and is expected to l enter the review / approval cycle by 10/28/87. l STP.793 HYDROGEN MONITOR / PASS HEAT TRACING FUNCTIONAL TEST This proce+:re was. performed but there was some difficulty in meeting the acceptance criteria. The test is on hold pending the results of a Non Conformance Report written l l on the test acceptance criteria.

l Page 2

[ 'a

i ;.; . ,

sc l

'STP.1131 PASS LIQUID SAMPLE DEPRESSURIZATION AND TOTAL GAS TEST I. This? procedure has been written and is.in word. processing. -l L .LThe: procedure is; expected to.be placed-intthe-review / -ls

? approval cycle by- 10/28/87.- U E ,

!; SURVEILLANCE-PROCEDURE' l I . A: surveillance procedure'(SPc907).will be developed for the' monthly'

functional testiof the system. Procedure' development is~pending manpower' availability.

CHEMISTRY PROCEDURES There.are five. Chemistry procedures associated with the PASS. :Two= '

have.been approved and three are in the review / approval cycle. . <

The two which have'been approved will be reformatted and resubmitted 1 for approval. . .l ~  ;

. TRAINING

P All Chemistry' Technicians have received.four hours of formal class-

. room training. .When procedures CHM-8001 (PASS liquid sampling) and

' . CHM-6005 (PASS;containanent atmosphere sampling) are-approved, six. ,

Chemistry Technicians will initially be given hands-on training.  !

The two procedures ~have'been-reviewed and are in the final approval'. .;- i phase'. '! :

PREVENTATIVE MAINTENANCE 3

- The FM program has.been reviewed by the PM Supervisor. A list of instruments not currently'in the program was developed and will'be used to'complie the necessary information to complete the PM 7 requirements. -Program development is.in progress. l I4 SPARE-PARTS Nuclear l Engineering' developed a list of spare parts and submitted it

-to the Procurement Group. The majority of those parts are on order.  !

The orderLfor a portion of the parts is on hold pending' additional j ordering information. l n

NRC INSPECTION NO. 87-26 Action has been taken on two items of concern expressed at this and previous inspections. The first item, NUPAC Shipping Cask labeling, I has:been closed, and the second item concerns lead blanket shielding.

PASS LEAD BLANKET SHIELDING

.The lead blankets have been labeled as-permanent shielding. .i Small cable will be used to tie the blankets together and when that is done this item will be complete.

Page 3