MONTHYEARRC-12-0075, Technical Specification Change Request for TS 3.5.4, Refueling Water Storage Tank (RWST)2012-06-29029 June 2012 Technical Specification Change Request for TS 3.5.4, Refueling Water Storage Tank (RWST) Project stage: Request RC-12-0132, V. C. Summer, Unit 1, South Carolina Electric & Gas (SCE & G) Response to Request for Additional Information License Amendment Request - LAR 10-093912, Technical Specification Change Request for TS 3.5.4, Refueling Water Storage Tank2012-09-12012 September 2012 V. C. Summer, Unit 1, South Carolina Electric & Gas (SCE & G) Response to Request for Additional Information License Amendment Request - LAR 10-093912, Technical Specification Change Request for TS 3.5.4, Refueling Water Storage Tank Project stage: Response to RAI RC-12-0141, Response to Request for Additional Information License Amendment Request LAR 10-03912 Technical Specification Change Request for TS 3.5.4, Refueling Water Storage Tank (RWST)2012-09-20020 September 2012 Response to Request for Additional Information License Amendment Request LAR 10-03912 Technical Specification Change Request for TS 3.5.4, Refueling Water Storage Tank (RWST) Project stage: Response to RAI ML12270A3012012-10-12012 October 2012 Issuance of Amendment Project stage: Approval RC-16-0092, License Amendment Request LAR-12-02439, Technical Specification 3.5.4, Limiting Condition for Operation Refueling Water Storage Tank2016-08-29029 August 2016 License Amendment Request LAR-12-02439, Technical Specification 3.5.4, Limiting Condition for Operation Refueling Water Storage Tank Project stage: Request 2012-09-12
[Table View] |
|
---|
Category:Letter type:RC
MONTHYEARRC-22-0004, (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System2022-01-14014 January 2022 (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System RC-18-0157, (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-28028 December 2018 (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0149, ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-21021 December 2018 ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0136, (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683)2018-12-12012 December 2018 (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683) RC-18-0144, (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 252018-11-20020 November 2018 (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 25 RC-18-0126, (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-01692018-11-0909 November 2018 (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-0169 RC-18-0070, (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ...2018-10-0808 October 2018 (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ... RC-18-0067, (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.22018-10-0808 October 2018 (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2 RC-18-0123, NRC Request for Information Baseline Radiation Safety Inspection2018-10-0404 October 2018 NRC Request for Information Baseline Radiation Safety Inspection RC-18-0117, (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment2018-09-28028 September 2018 (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment RC-18-0112, (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.32018-09-27027 September 2018 (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.3 RC-18-0119, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-09-19019 September 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0118, (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange2018-09-14014 September 2018 (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange RC-18-0116, (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information2018-09-11011 September 2018 (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information RC-18-0113, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-31031 August 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0091, License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions2018-08-29029 August 2018 License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions RC-18-0111, License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-24024 August 2018 License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0100, (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information2018-08-22022 August 2018 (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information RC-18-0105, (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water ..2018-08-14014 August 2018 (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water .. RC-18-0102, Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error2018-08-10010 August 2018 Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0098, (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-07-30030 July 2018 (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0085, (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-01262018-07-23023 July 2018 (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-0126 RC-18-0090, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request...2018-07-12012 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request... RC-18-0089, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-11011 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0084, Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Requ2018-07-0303 July 2018 Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Reques RC-18-0082, Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-0303 July 2018 Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0079, Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error2018-06-29029 June 2018 Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0074, Change of the Commitment Date of DRIB/105A&B Door Submittal2018-06-18018 June 2018 Change of the Commitment Date of DRIB/105A&B Door Submittal RC-18-0060, (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error2018-05-30030 May 2018 (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error RC-18-0064, (Vcsns), Unit 1 - Annual Commitment Change Summary Report2018-05-18018 May 2018 (Vcsns), Unit 1 - Annual Commitment Change Summary Report RC-18-0063, Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation2018-05-0202 May 2018 Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation RC-18-0056, (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors2018-04-25025 April 2018 (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors RC-18-0059, Annual Radioactive Effluent Release Report2018-04-25025 April 2018 Annual Radioactive Effluent Release Report RC-18-0046, License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information2018-04-19019 April 2018 License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information RC-18-0036, (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information2018-04-0202 April 2018 (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information RC-18-0041, Report of Status of Decommissioning Funding2018-03-28028 March 2018 Report of Status of Decommissioning Funding RC-17-0175, Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error2018-01-31031 January 2018 Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error RC-18-0006, Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-01-25025 January 2018 Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-17-0169, Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-00192017-12-11011 December 2017 Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-0019 RC-17-0182, (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status2017-12-11011 December 2017 (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status RC-17-0172, Notification of Personnel Changes2017-11-30030 November 2017 Notification of Personnel Changes RC-17-0161, Submittal of Change of the Commitment Date of DRIB/105A&B Door2017-11-28028 November 2017 Submittal of Change of the Commitment Date of DRIB/105A&B Door RC-17-0135, Annual Commitment Change Summary Report2017-11-0303 November 2017 Annual Commitment Change Summary Report RC-17-0123, Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds2017-10-30030 October 2017 Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds RC-17-0140, Transmittal of 10 CFR 50.59 Biennial Report2017-10-23023 October 2017 Transmittal of 10 CFR 50.59 Biennial Report RC-17-0107, (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change2017-10-0606 October 2017 (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change RC-17-0134, Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 12017-09-27027 September 2017 Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 1 RC-17-0126, Reply to a Notice of Violation, Per Inspection Report 05000395/20170022017-09-0606 September 2017 Reply to a Notice of Violation, Per Inspection Report 05000395/2017002 RC-17-0112, Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days2017-09-0101 September 2017 Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days RC-17-0069, (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description2017-08-30030 August 2017 (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description 2022-01-14
[Table view] |
Text
Thomas D. Gatlin Vice President,Nuclear Operations 803.345.4342 September 20, 2012 A SCANA COMPANY RC-12-0141 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Dear Sir / Madam:
Subject:
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 SOUTH CAROLINA ELECTRIC & GAS (SCE&G) RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST - LAR 10-03912 TECHNICAL SPECIFICATION CHANGE REQUEST FOR TS 3.5.4, REFUELING WATER STORAGE TANK (RWST)
References:
- 1. Thomas D. Gatlin Letter (RC-12-0075) dated June 29, 2012, License Amendment Request - LAR 10-03912 Technical Specification Change Request for TS 3.5.4, Refueling Water Storage Tank (RWST);
ADAMS Accession No. ML121850005
- 2. SCE&G Response to Request for Additional Information (RC-12-0132)
License Amendment Request - LAR 10-03912 Technical Specification Change Request for TS 3.5.4, Refueling Water Storage Tank (RWST)
- 3. Electronic Mail Message transmitted Monday, September 17, 2012 from Robert E. Martin, NRC Region II Project Manager to Bruce L. Thompson, Manager, Nuclear Licensing, V. C. Summer Nuclear Station Unit 1 South Carolina Electric & Gas Company (SCE&G) is submitting this response to a request for additional information (RAI) by the Nuclear Regulatory Commission (NRC) regarding License Amendment Request LAR 10-03912, Technical Specification Change Request for TS 3.5.4, Refueling Water Storage Tank (RWST). This request for additional information was identified during conference calls with the NRC. The NRC RAI and SCE&G's response is provided in the Attachment. There are no regulatory commitments made by this letter.
Virgil C.Summer Station - Post Office Box 88 . Jenkinsville, SC -29065
Document Control Desk LAR 10-03912 RC-12-0141 Page 2 of 2 If you have any questions about this submittal, please contact Mr. Bruce L. Thompson at (803) 931-5042.
I certify under penalty of perjury that the foregoing is correct and true.
Executed on Thomas D. Gatlin JW/TDG/wm
Attachment:
SCE&G's Response to NRC Question c: K. B. Marsh S. A. Byrne J. B. Archie N. S. Carns J. H. Hamilton R. J. White W. M. Cherry V. M. McCree R. E. Martin NRC Resident Inspector S. E. Jenkins Paulette Ledbetter K. M. Sutton NSRC RTS (CR-10-03912)
File (813.20)
PRSF (RC-12-0141)
Document Control Desk Attachment RC-12-0141 Page 1 of 4 VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) Unit 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 ATTACHMENT SCE&G's Response to NRC Question
Document Control Desk Attachment RC-12-0141 Page 2 of 4 NRC Question On June 29, 2012, South Carolina Electric and Gas Company submitted a proposed license amendment request (LAR), Agencywide Documents Access and Management System (ADAMS) Accession No. ML121850005 to the Nuclear Regulatory Commission (NRC) to revise the Virgil C. Summer Nuclear Station, Unit 1, Technical Specification (TS) 3.5.4, "Refueling Water Storage Tank."
The proposed change would allow non-seismically qualified piping of the Spent Fuel Pool to be connected to the Refueling Water Storage Tank (RWST).
In the LAR, the licensee stated that the failure of the boundary valve (XVT06701-SF) would be considered a credible single failure. In accordance with Summer's licensing basis accident dose analysis, the boundary valve functions to isolate potentially radioactive sump fluid from non-seismic piping. The existing analysis approved by the NRC staff in License Amendment 183, dated October 4, 2010, "Virgil C. Summer Nuclear Station, Unit No. 1, Issuance of Amendment Regarding Alternative Source Term Implementation (TAC No. ME0663)" (ADAMS No. ML102160020) assumed the valve remained closed during operation.
After the end of post-loss-of-coolant-accident (post-LOCA) injection phase, the Emergency Core Cooling Systems (ECCS) and containment spray systems
[ESF systems that recirculate sump water] are switched to the recirculation phase. This requires that water from the containment sump replace the RWST as the ESF systems water supply by realigning several system valves that interface between these ESF systems and the RWST and the pathways leading back to the RWST. If these system valves leak by design or the leakage of these valves is unknown, a leakage path between the containment sump and the RWST and any interfacing piping may exist. For the design basis LOCA radiological analyses, it is assumed that 40% of the core iodine inventory is mixed homogeneously and instantaneously in the primary containment sump water at the time of release from the core. Because the ECCS takes suction from the sump, the sump water is assumed to be radioactive. Per, RG 1.183, Regulatory Position 5.1.2 any piping downstream of the failed valve that is non-safety related or not in technical specifications would not be credited in the design basis radiological analyses. Therefore, the proposed change would create a potential release pathway for radioactivity to the environment which is not considered in the current design basis accident analyses.
An active failure of the boundary valve would allow any radioactive ESF leakage to the RWST tank or in route to the RWST to drain to non-seismic piping after a design basis accident (i.e. LOCA). Please describe how the credible failure of the boundary valve (XVT06701-SF) impacts the assumptions for the most limiting single active failure considered in the licensing basis
Document Control Desk Attachment RC-12-0141 Page 3 of 4 LOCA analysis and the resulting consequences. If this proposed change results in a new limiting single active failure assumption, please provide the inputs and results for the revised LOCA analysis in order for the staff to conduct an independent analysis to confirm radiological doses would remain below the criteria in 10 CFR 50.67.
As an alternative to the information requested above, to address NRC staff concerns provide a justification for creditable actions to be taken to prevent and/or mitigate a radiological release through an unanalyzed pathway via non-seismic piping while in the proposed configuration. The response should consider creditable actions such as additional means available to isolate flow through the non-seismic piping after a design basis accident and a failure of the boundary valve (XVT0607-SF) to close.
SCE&G Response The LOCA analysis and associated radiological consequences were updated when the station submitted License Amendment and Related Technical Specification Changes to Implement Full-Scope Alternative Source Term In Accordance With 10 CFR 50.67 on February 17, 2009 (ML090720887). The LOCA analysis was described in Attachment 2, section 4.3. Attachment 3 "Regulatory Guide 1.183 Compliance Table", page 23 describes the station's compliance with Regulatory Guide 1.183 section 5.2 concerning leakage from all components in the ESF recirculation systems. In that attachment we stated that "Leakage through the RWST and NaOH Tank is neglected in this calculation based on plant procedures (EOPs) that require closure of the 20" RWST outlet valve (XVT06700-SF) and closure of the 3" NaOH outlet valve (XVG03012-SP) following the transition to cold leg recirculation. This results in 3-valve isolation and a minimum of 2-valve isolation in the long term with a single failure". The NRC accepted this as documented on page 13 of the Safety Evaluation related to license amendment 183 (ML102160020).
The RWST is isolated from the recirculation flow paths by at least three closed valves in series including manually-operated XVG06700-SF. Valve XVG06700-SF is manually closed outside the control room after the recirculation switchover has been completed, as directed in EOP-2.2 - Transfer to Cold Leg Recirculation. Valve XVT06701-SF is physically adjacent to and in parallel with XVG06700-SF.
XTV06701-SF is the third isolation valve between the recirculation flow path and the non-safety related Spent Fuel Pool (SFP) Purification System inside the Auxiliary Building.
To address the single failure concern, before aligning the RWST to the SFP Purification System, XTV06701-SF is cycled from its normally full closed position to full open and back to full closed each time. Cycling the valve verifies the valve is
Document Control Desk Attachment RC-12-0141 Page 4 of 4 mechanically functional and capable of being closed prior to being placed in service.
The purification system will not be placed in service if any anomaly is identified.
Should the valve fail to close while being cycled, the RWST would be declared inoperable and TS 3.5.4 action statement would be entered.
The license amendment request allows XVT06701-SF to be opened in modes 1 through 4 under administrative controls, which require a dedicated operator to close the valve should plant conditions dictate. The operator actions are judged to be feasible in that there are adequate indication to initiate the actions, sufficient time to perform the actions, and adequate access to the equipment being utilized. The administrative controls specifically require closing the XVT06701-SF within approximately 20 minutes of a reactor trip. This means XVT06701-SF is closed prior to the recirculation phase if the reactor trip is due to a LOCA. Once XVT06701-SF is closed, the system configuration is returned to its normal alignment.
The license amendment request also limits this alignment to four hours per week and 30 days per operating cycle, while in modes 1 through 4. The alignment was evaluated from a risk perspective and the probability of not closing XVT06701-SF following a seismic event was determined to be 5.04E-8 per year.
This evaluation was based on the following assumptions: The pipe will not break at earthquake magnitudes less than OBE. The frequency of exceeding an OBE is 3.OE-4 per year. The time allowed in the LAR for XVT06701-SF to be open translates into an annual fraction of 8.14E-2. These are independent events so the probability of having an earthquake large enough to cause pipe failure while XVT06701-SF is open is 2.4E-5. Mitigation is accomplished by dedicated operator manual action to secure the pump and close the manual valve. The failure mechanisms are failure of the pump breaker to open on demand (1.OE-3), failure of the manual valve to close on demand (1.OE-4), and failure of the operator to perform the task (9.8E-4). Since any one of these can cause a failure, the probability of failure is the sum of the events (2.1E-3). Therefore the probability of having a seismic event while XVT06701-SF is open and then not closing it becomes 5.04E-8 per year. This is not considered to be risk significant. It should also be noted that the LAR allowing this alignment is limited to two operating cycles to provide time for a design change to eliminate the administrative controls.
In summary, by testing the valve prior to placing the purification system in service, conducting the evolution under robust administrative controls, and limiting the duration of the alignment, a new single failure is obviated.