Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4
ML22066B064
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/07/2022
From: Godes W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2022-017
Download: ML22066B064 (1)


Text

March 7, 2022 L-2022-017 10 CFR 50.71(e)

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE: St. Lucie Unit 2 Docket No. 50-389 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 Pursuant to Technical Specification (TS) 6.8.4.j.4, Florida Power & Light Company (FPL) is submitting the periodic report of changes made to the St. Lucie Unit 2 TS Bases without prior NRC approval. This periodic report is submitted on a frequency consistent with 10 CFR 50.71(e) for amendments to the Updated Final Safety Analysis Report (UFSAR). This report covers the period of UFSAR Amendment No. 27 (March 21, 2020 through October 1, 2021).

During the period, the St. Lucie Unit 2 TS Bases were not revised.

Please contact me at 772-467-7435 with any questions regarding this submittal.

Sincerely, Wyatt Godes Licensing Manager St. Lucie Plant WG/rcs Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957