ENS 54286
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
05:56 Jul 6, 2019 | |
Title | Both Trains of Component Cooling Water Determined Inoperable |
Event Description | 10 CFR 50.72(b)(3)(v)(A, B, and D) - Event or Condition that Could Have Prevented the Fulfillment of a Safety Function Unit 2 Component Cooling water system inoperable.
On July 6, 2019, from 0156 to 1545 [EDT], it was determined that both trains of the unit 2 component cooling water system were simultaneously inoperable; therefore, this condition is being reported as an eight-hour, non-emergency notification per 10 CFR 50.72(b)(3)(v). The affected safety function was restored on July 6, 2019, at 1545 [EDT] when the 2B component cooling train was restored to operable. There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified. At the time of the event no other safety related systems were inoperable. The event had no impact on Unit 1. |
Where | |
---|---|
Catawba South Carolina (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor 10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
Time - Person (Reporting Time:+1808.2 h75.342 days <br />10.763 weeks <br />2.477 months <br />) | |
Opened: | Will Fowler 14:08 Sep 19, 2019 |
NRC Officer: | Thomas Kendzia |
Last Updated: | Sep 19, 2019 |
54286 - NRC Website | |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |