ENS 45491
ENS Event | |
---|---|
20:00 Nov 11, 2009 | |
Title | Incomplete Documentation of Criticality Safety Controls in Integrated Safety Analysis Summary |
Event Description | During a GNF-A ongoing review of the Fuel Manufacturing Operation (FMO) Integrated Safety Analysis (ISA), it was discovered at 3pm yesterday (11/11/09) that there may be an incomplete list of criticality safety controls associated with the Pellet and Rod Load Fabrication areas in the ISA Summary.
At 7pm, it was determined that the list of Items Relied On For Safety (IROFS) was incomplete and the affected equipment was shut down pending revision of the ISA to document IROFS for these processes. Notwithstanding the documentation deficiency, the controls associated with moderator intrusion and geometry remained in place, functional, and maintained with appropriate management controls. While this discovery did not result in an unsafe condition, it is being reported on 11/12/09 pursuant to the reporting requirements of 10CFR70 Appendix A(b)(1) within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Safety Significance of Events: Low safety significance - All process criticality safety controls remained intact and functioning for this processes. Safety Equipment Status: Pellet and Fuel Load fabrication areas are shutdown and will remain shutdown until the ISA review is completed. Status of Corrective Actions: Pellet and Rod Load Fabrication areas will remain shutdown pending final investigation results and identification of additional IROFS. The licensee notified NRC Region 2 Inspector (Crespo) and will notify state and local authorities. |
Where | |
---|---|
Global Nuclear Fuel - Americas Wilmington, North Carolina (NRC Region 2) | |
License number: | SNM-1097 |
Reporting | |
Part 70 App A (B)(1) | |
Time - Person (Reporting Time:+15.78 h0.658 days <br />0.0939 weeks <br />0.0216 months <br />) | |
Opened: | Scott Murray 11:47 Nov 12, 2009 |
NRC Officer: | Joe O'Hara |
Last Updated: | Nov 12, 2009 |
45491 - NRC Website | |
Global Nuclear Fuel with Part 70 App A (B)(1) | |
WEEKMONTHYEARENS 528112017-06-16T21:00:00016 June 2017 21:00:00
[Table view]Part 70 App A (B)(1) Unanalyzed Condition Identified ENS 507502015-01-21T20:00:00021 January 2015 20:00:00 Part 70 App A (B)(1) Dry Conversion Process Improperly Analyzed in the Current Integrated Safety Analysis ENS 502762014-07-12T21:30:00012 July 2014 21:30:00 Part 70 App A (B)(1) Items Relied on for Safety Associated with the Dry Scrap Recycle Operations Not Meeting Requirements ENS 487092013-01-30T20:30:00030 January 2013 20:30:00 Part 70 App A (B)(1) Completion of Integrated Safety Analysis Action Plan Balance of Plant Milestone ENS 486952013-01-22T20:30:00022 January 2013 20:30:00 Part 70 App A (B)(1) Unanalyzed Condition - Based on Ongoing Integrated Analysis Review ENS 485542012-12-03T18:30:0003 December 2012 18:30:00 Part 70 App A (B)(1) Items Relied on for Safety Associated with the Dry Scrap Recycle Furnace Improperly Analyzed ENS 484972012-11-09T16:00:0009 November 2012 16:00:00 Part 70 App A (B)(1) Unanalyzed Condition - System As-Found Condition Not Fully Described in Isa ENS 477052012-02-27T19:30:00027 February 2012 19:30:00 Part 70 App A (B)(1) Unanalyzed Piping Configuration Discovered ENS 473252011-10-05T18:00:0005 October 2011 18:00:00 Part 70 App A (B)(1) Item Relied on for Safety Not as Described in the Integrated Safety Analysis ENS 467102011-03-29T14:00:00029 March 2011 14:00:00 Part 70 App A (B)(1) Completion of Isa Action Plan Conversion Milestone ENS 463052010-10-02T17:30:0002 October 2010 17:30:00 Part 70 App A (B)(1) Unanalyzed Condition When Fuel Pellet Boats Became Stacked ENS 462432010-09-09T18:30:0009 September 2010 18:30:00 Part 70 App A (B)(1) Accident Evaluation Improperly Analyzed in the Integrated Safety Analysis ENS 457172010-02-23T16:00:00023 February 2010 16:00:00 Part 70 App A (B)(1) Unanalyzed Condition - Incomplete List of Safety Controls in Integrated Safety Analysis Summary ENS 454912009-11-11T20:00:00011 November 2009 20:00:00 Part 70 App A (B)(1) Incomplete Documentation of Criticality Safety Controls in Integrated Safety Analysis Summary 2017-06-16T21:00:00 | |