ENS Event | |
---|---|
09:50 Dec 28, 2007 | |
Title | Technical Specification Required Shutdown - Dropped Cea |
Event Description | At 0347 on 12/28/07, during plant start up from a refueling outage while In Mode 2, one control element assembly (CEA) dropped to the bottom of the core from the upper electrical limit. The reactor was not critical at the time. Technical Specification LCO 3.1.3.1 action (e) was initiated to proceed to Mode 3 at 0450 while actions are taken to repair and retrieve the CEA. This four hour non-emergency report is being made pursuant to 10 CFR 50.72(b)(2)(i), the 'Initiation of any nuclear plant shutdown required by Technical Specifications'.
The licensee notified the NRC Resident Inspector.
The licensee is retracting this report based on the following: At 03:47 on 12/28/07, during plant start up from a refueling outage while in Mode 2, one control element assembly (CEA) dropped to the bottom of the core from the upper electrical limit. The reactor was not critical at the time. Technical Specification LCO 3.1.3.1 [Action E] was initiated to proceed to Mode 3 at 0450 while actions were taken to repair and retrieve the CEA. This event was reported as a four hour non-emergency report pursuant to 10CFR 50.72(b)(2)(i), 'The initiation of any nuclear plant shutdown required by Technical Specifications.' Upon further review of the event, and since the Unit was not critical in mode 2 at the time of the event, this event is not considered reportable in accordance with the guidance provide in NUREG-1022, Rev. 2, 'Event Reporting Guidelines 10CFR50.72 and 50.73,' in which 'The initiation of any plant shutdown' does not include mode changes required by TS if initiated after the plant is already in a shutdown condition. As such this notification is being retracted. The Site Resident has been notified of this retraction. |
Where | |
---|---|
Saint Lucie Florida (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
Time - Person (Reporting Time:+-3.07 h-0.128 days <br />-0.0183 weeks <br />-0.00421 months <br />) | |
Opened: | Alan Hall 06:46 Dec 28, 2007 |
NRC Officer: | John Knoke |
Last Updated: | Mar 26, 2008 |
43871 - NRC Website | |
WEEKMONTHYEARENS 556932022-01-07T00:37:0007 January 2022 00:37:00
[Table view]10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Shutdown Initiated in Accordance with Technical Specifications ENS 521382016-08-01T07:42:0001 August 2016 07:42:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Plant Shutdown Due to Pressure Boundary Leakage Greater than Allowable Limit ENS 509772015-04-12T01:00:00012 April 2015 01:00:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Safety Injection Tank Outlet Piping Leak ENS 503102014-07-25T15:29:00025 July 2014 15:29:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown, 10 CFR 50.72(b)(3)(ii)(A), Seriously Degraded Technical Specification Required Shutdown Due to a Safety Injection Valve Defect ENS 444852008-09-14T06:41:00014 September 2008 06:41:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Dropped Control Element Resulting in Entry Into Technical Specification Required Shutdown Lco ENS 438712007-12-28T09:50:00028 December 2007 09:50:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown - Dropped Cea ENS 420522005-10-12T18:40:00012 October 2005 18:40:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Shutdown Based on Loss of Two Channels of Containment Isolation Radiation Monitor 2022-01-07T00:37:00 | |