| Q | CCA | Title |
---|
05000313/FIN-2008005-04 | 2008Q4 | P.3 | Failure to Control Transient Combustable Material in the Auxiliary Building |
05000313/FIN-2008005-01 | 2008Q4 | H.14 | Failure to Perform an Adequate Risk Assessment when Disabling a Station High Energy Line Break Barrier |
05000313/FIN-2008005-05 | 2008Q4 | H.12 | Failure to Correct and Prevent Recurrence of a Significant Condition Adverse to Quality Associated with Fires |
05000313/FIN-2008005-02 | 2008Q4 | H.7 | Inadequate Procedure for Reactor Vessel Head Lift |
05000313/FIN-2008005-03 | 2008Q4 | H.8 | Failure to Adequately Implement Foreign Material Exclusion Controls |
05000313/FIN-2009002-03 | 2009Q1 | H.11 H.12 | Failure to Provide Complete and Accurate Information to the NRC Following a Plant Trip |
05000313/FIN-2009002-05 | 2009Q1 | P.5 P.2(b) | Failure to Follow Procedure for Flow Accelerated Corrosion Program |
05000313/FIN-2009002-04 | 2009Q1 | H.11 H.12 | Failure to Follow Procedure for Use of a Torque Amplifying Device on a Valve in the Generator Hydrogen System |
05000313/FIN-2009002-01 | 2009Q1 | P.2 | Inadequate Procedure for Reactor Protection System Maintenance |
05000313/FIN-2009002-02 | 2009Q1 | | Inadequate Service Air Compressor Torquie Value Led to Loss of Control Rod Drive Cooling and Manual Reactor Trip |
05000313/FIN-2009003-01 | 2009Q2 | H.4 H.5 | Failure to Follow Procedure and Perform Postmaintenance Testing Prior to Declaring Equipment Operable |
05000313/FIN-2009003-03 | 2009Q2 | P.2 | Failure to Appropriately Identify and Implement Adequate Corrective Actions to Correct a Condition Adverse to Quality Associated with the Material Control System |
05000313/FIN-2009003-04 | 2009Q2 | P.2 | Trip of a Main Feed Pump Due to Electromagnetic Interference |
05000313/FIN-2009003-02 | 2009Q2 | H.8 | Failure to Follow Station Planning Procedure Results in an Inadequate Work Instructions |
05000313/FIN-2009201-03 | 2009Q3 | P.2 | Security |
05000313/FIN-2009201-01 | 2009Q3 | H.14 | Security |
05000313/FIN-2009201-02 | 2009Q3 | | Security |
05000313/FIN-2009004-04 | 2009Q3 | H.8 | Failure to Adequately Implement Foreign Material Exclusion Controls |
05000313/FIN-2009004-06 | 2009Q3 | H.8 | Failure to Implement Troubleshooting Procedure During Troubleshooting Activities |
05000313/FIN-2009004-07 | 2009Q3 | H.5 | Failure to Control Access to a High Radiation Area with Dose Rates in Excess of 1.0 R/hr |
05000313/FIN-2009004-02 | 2009Q3 | | Failure to Maintain Seismic Design Bases Control |
05000313/FIN-2009004-05 | 2009Q3 | P.1 P.1(a) | Failure to Ensure that Conditions Adverse to Quality are Appropriately Entered into the Corrective Action Program |
05000313/FIN-2009007-01 | 2009Q3 | | Inadequate Design Control for Class 1E Batteries and Battery Racks |
05000313/FIN-2009007-02 | 2009Q3 | P.5 P.2(b) | Failure to Provide Accurate Information in Response to Generic Letter 2007-01, Inaccessible or Underground Power Cables Failures that Disable Accident Mitigation Systems or Cause Plant Transients |
05000313/FIN-2009004-01 | 2009Q3 | | Failure to Adequately Monitor the Performance of Station High Energy Line Break Door Latches |
05000313/FIN-2009004-03 | 2009Q3 | | Inadequate maintenance Procedure Governing Repairs to Unit 1 High Energy Line Break Door |