| Q | CCA | Title |
---|
05000261/FIN-2016001-01 | 2016Q1 | H.5 | Failure to Adequately Establish and Implement Procedure During Tornado Watch/Warning |
05000261/FIN-2016001-02 | 2016Q1 | | Failure to Scope Safety-Related Auxiliary Building Ventilation Fans into the Maintenance Rule |
05000261/FIN-2016001-03 | 2016Q1 | H.12 | Failure to Follow Procedure for a Light Indication Replacement |
05000261/FIN-2016001-04 | 2016Q1 | | Failure to Control Deviations from Design Specifications for the Service Water System |
05000261/FIN-2016001-05 | 2016Q1 | H.12 | Failure to Adequately Maintain Emergency Operating Procedures EOP-ECA-0.0 and EOP-E-0 |
05000261/FIN-2016008-01 | 2016Q3 | H.4 | Failure to Failure to Keep EOP FRP-H.1 in Conformance with Plant Specific Guidelines |
05000261/FIN-2016008-02 | 2016Q3 | P.2 | Failure to Perform Appropriate Maintenance or Testing for the Dedicated Shutdown Transformer |
05000261/FIN-2016008-03 | 2016Q3 | | Failure to Comply with TS Requirements for Containment High Range Radiation Monitors |
05000261/FIN-2016008-04 | 2016Q3 | P.5 | Failure to Follow Operability Determination Process |
05000261/FIN-2016003-01 | 2016Q3 | | Failure to Scope Tainter Gate Flood Protection Features in Maintenance Rule Resulting in Degraded Performance |
05000261/FIN-2016003-02 | 2016Q3 | H.5 | Failure to Assess and Manage Risk for Main Turbine Trip Maintenance Resulting in Turbine/Reactor Trip |
05000261/FIN-2016404-01 | 2016Q3 | | Security Safeguards Control |
05000261/FIN-2017405-01 | 2016Q3 | | Security |