Pages that link to "TS-4.7.5.e"
Jump to navigation
Jump to search
The following pages link to TS-4.7.5.e:
Displayed 13 items.
- NRC-90-0057, Application for Amend to License NPF-43,revising Tech Spec 3/4.7.5 to Extend Visual Insp of Snubbers Until Second Refueling Outage Currently Scheduled for Mar 1991 (← links)
- ML20094E733 (← links)
- NRC-95-0096, Application for Amend to License NPF-43,revising TS Re Sys Testing,Instrumentation Calibr,Component Insp,Component Testing,Response Time Testing & Logic Sys Functional Tests to Allow one-time Extension of Surveillance Intervals (← links)
- NRC-91-0152, Application for Amend to License NPF-43,changing TS 3/4.7.5 Re Alternate Snubber Visual Insp Intervals,Per Generic Ltr 90-09 (← links)
- ML20117D997 (← links)
- IR 05000324/1986006 (← links)
- ML20199D343 (← links)
- ML20198J387 (← links)
- NRC-89-0202, Informs of Selection of Sample Plan 1 of Tech Spec 4.7.5.e for Snubber Functional Testing During First Refueling. Testing Scheduled to Begin 890908 (← links)
- NRC-98-0040, Application for Amend to License NPF-43,requesting to Allow one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 (← links)
- BSEP-87-0296, Notifies That Functional Testing of Hydraulic Snubbers Will Be Conducted Per Method Described in Tech Spec 4.7.5.e(3) During Current Refueling/Maint Outage (← links)
- BSEP-95-0235, Responds to NRC Re Violation Noted in Insp Rept 50-324/95-05.Util Denies Violation.Reason for Denial Included (← links)
- BSEP-90-0559, Notifies That Functional Testing of Hydraulic Snubbers Will Be Conducted Per Tech Spec 4.7.5.e(3) During Current Refueling/Maint Outage (← links)