Pages that link to "RS-20-111, Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI"
Jump to navigation
Jump to search
The following pages link to RS-20-111, Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI:
Displayed 50 items.
- RS-13-167, Peach Bottom, Units 2 and 3, Registration of Use of Cask to Store Spent Fuel (← links)
- RS-13-009, Clinton, Unit 1, Updated Licensing Basis Documents (← links)
- RS-12-218, Peach Bottom Atomic Power Station, Units 1, 2, and 3 - Submittal of 10 CFR 50 Appendix E Evacuation Time Estimate Analysis (← links)
- RS-12-088, Limerick, Unit 1, Response to Request for Additional Information Regarding Status of Decommissioning Funding Assurance (← links)
- RS-12-013, Submittal of Additional Information Regarding Exelon Settlement Agreement Between Edf Inc. (Edp') and Exelon Corporation (Exelon), Exelon Energy Delivery Company, LLC (Eedc, Llc), Constellation Energy Group, Inc. (Constellation) and Baltim (← links)
- RS-11-181, Submittal of Revised Post-Transaction Organization Related to Application for Approval of Indirect Transfer of Control of Licenses (← links)
- RS-11-167, Calvert Cliffs, Units 1 & 2, ISFSI, Nine Mile Point, Units 1 & 2, R.E. Ginna Nuclear, ISFSI - Submittal of Exelon Proxy Material Related to Application for Approval of Indirect Control of Licenses (← links)
- RS-10-133, Limerick, Units 1 and 2 - Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate (← links)
- RS-10-006, Peach Bottom, Units 1, 2 and 3, Request for License Amendment to Allow Receipt and Storage of Low-Level Radioactive Waste (← links)
- RS-09-064, Clinton, Unit 1, Withdrawal of Request to Modify Facility Operating License in Support of Bulk Isotope Generation Project (← links)
- RS-16-147, Seventh Six-Month Status Report in Response to 03/12/ 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049) (← links)
- RS-16-091, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- RS-16-063, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- RS-15-062, R. E. Ginna - February 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051) (← links)
- RS-15-078, Calvert Cliff, Unit 2 - Request for Schedule Relaxation from Nuclear Regulatory Commission Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- RS-14-197, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- RS-14-060, Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) (← links)
- RS-09-181, Submittal of Additional Information Supporting the Request for a License Amendment to Modify Clinton Power Station Facility Operating License in Support of the Use of Isotope Test Assemblies (← links)
- RS-08-111, Supplemental Information Related to Application for Technical Specification Change TSTF-374, Revision to TS 5.5.9 for Diesel Fuel Oil Using Consolidated Line Item Improvement Process (← links)
- RS-07-137, Response to Request for Additional Information Related to Clinton Power Station Unit 1 Relief Request 2209 (← links)
- RS-18-106, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (← links)
- RS-18-133, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors (← links)
- RS-18-116, Application to Revise Technical Specifications to Adopt TSTF-476, Improved BPWS Control Rod Insertion Process (NEDO-33091), Revision 1 (← links)
- RS-18-105, License Amendment Request to Recapture Low-Power Testing Time (← links)
- RS-18-059, Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident (← links)
- RS-18-052, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (← links)
- RS-18-051, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- RS-18-067, Response to Request for Additional Information Regarding Generic Letter 2016-01 (← links)
- RS-18-012, Tenth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049) (← links)
- RS-18-005, License Amendment Request to Incorporate Revised Alternative Source Term Dose Calculation (← links)
- RS-18-002, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- RS-18-001, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) (← links)
- RS-17-164, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. (← links)
- RS-17-145, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control (← links)
- RS-17-140, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors (← links)
- RS-17-132, Update to Notification of Intended Use of Nsf Lead Use Channels (← links)
- RS-17-096, Ninth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) (← links)
- RS-17-095, Ninth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-029) (← links)
- RS-17-103, Supplemental Information Regarding Response to Generic Letter 2016-01 (← links)
- RS-17-062, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- RS-17-076, License Amendment Request to Revise Spent Fuel Pool Level (← links)
- RS-17-079, Response to Request for Additional Information Regarding the Permanent Extension of Leak Rate Testing (← links)
- RS-17-017, License Amendment Request to Clarify RHR Subsystem Operability Requirements During Decay Heat Removal Operations (← links)
- RS-17-020, Response to RAI Concerning License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (← links)
- RS-17-021, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (← links)
- RS-16-251, Request to Resume Review of Licensing Actions (← links)
- RS-16-252, Withdrawal of Certification of Permanent Cessation of Power Operations and Previously Submitted Licensing Actions in Support of Decommissioning (← links)
- RS-16-178, High Frequency Supplement to Seismic Hazard Screening Report (← links)
- RS-16-208, Response to NRC Acknowledgement of Suspension Request for Licensing Actions (← links)
- RS-16-214, Revision to Exelon Generation Company, LLC Fleet Commitment Relating to Maintaining Severe Accident Management Guidelines (← links)