Pages that link to "ML20236V391"
Jump to navigation
Jump to search
The following pages link to ML20236V391:
Displayed 27 items.
- PNO-I-96-086, on 961205,plant Engineers Identified Three Inadequate Cable Seperation Issues Affecting Reactor Protection Sys.Both Buttons of Either Pair of Trip Push Buttons Required to Be Depressed,To Initiate Manual Trip (← links)
- PNO-I-85-055, instrumentation Valves Mispositioned.State of Me Notified by Telcon on 850807.W/o Encl (← links)
- PNO-I-80-054, on 800402,plant Tripped from Full Power Due to Ground in Reactor Protective Sys.Ground Will Be Repaired & Plant Returned to Svc (← links)
- PNO-I-80-030, on 800218,while Refueling Core W/Pool Clarity & W/Approx 1/3 Core in Place,Problems Experienced in Seating Assembly.Assembly Placed in Core Improperly & Tilted Over. Area Evacuated (← links)
- PNO-I-80-031, on 800131,licensee Identified Nine Fuel Assemblies Containing Leaking Fuel Pins.At Least Two Pins Appeared to Have Missing Segments.Cause Not Stated.Damaged Fuel Assemblies Being Replaced (← links)
- ML20151X581 (← links)
- ML20151U503 (← links)
- PNO-I-97-046, on 970801,Maine Yankee Announced That Negotiations W/Peco Have Ceased & Plant Owners Agreed to Proceed W/Decommissioning.Majority of Contractors Released in May When Board Elected to Minimize Spending (← links)
- PNO-I-86-101, on 861230,leak from Blank Flange on Addition Line Connected to Vol Control Tank Discovered.Caused by Personnel Error.Release Well Below Tech Spec Limits & Radiation Monitor Readings Subsequently Decreased to Normal (← links)
- PNO-I-99-030, on 990630,licensee Notified NRC Region I That Shipping Container Loaded with Internally Contaminated Vacuum Cleaning Device,Used at Maine Yankee for Asbestos Removal,Was Damaged.No Radioactive Matl Was Released (← links)
- PNO-I-89-077, on 890907,bomb Threats Received to Licensee Corporate Ofc.Searches for Explosive Devices Conducted by Both Plant Operations & Security Personnel in Both Protected & owner-controlled Areas.No Explosive Devices Found (← links)
- PNO-I-87-058A, on 870625,licensee Completed Unscheduled Shutdown to Repair Vibration Problems on Main Turbine Generator Unit.Plant Continued to Experience Vibrations. Plant Manually Tripped from 25% Power on 870701 (← links)
- PNO-I-87-058, on 870623,plant Shutdown Due to Higher Vibrations of Turbine/Generator Radial.Licensee Estimates Shutdown Will Be Min of 3 Days (← links)
- PNO-I-96-086A, on 961205,Maine Yankee Personnel Identified Inadequate Cable Separation Issues Affecting Reactor Protection Sys.Licensee in Process of Developing Scope for Expanded Review & Process for Field Verification (← links)
- PNO-I-90-066, on 900816,notified of Unplanned Shutdown for Greater than 48 H to Repair Letdown Isolation Valve LD-M-2.Licensee to Repair LD-M-2 Before Coolant Activity Elevated.State of Me Notified (← links)
- PNO-I-90-046A, on 900618,licensee Examined Ctr Fingers of 106 of 111 Used Control Element Assemblies Onsite,W/Exam of Other 5 Ctr Fingers Planned.No Defects Found in 43 Ctr Fingers of Newer Design.Meeting W/Util & C-E Set for 900625 (← links)
- PNO-I-90-046, on 900607,control Element Assemblies (Ceas) Fully Withdrawn from Fully Inserted Position During Tests. Attempts to Insert CEAs Further Were Unsuccessful.Fuel Assembly Visually Inspected.State of Me Notified (← links)
- PNO-I-82-013, NRC Review of Safety Injection Actuation Circuits at Facility Revealed That Sys Could Not Withstand Single Active Failure for Certain Analyzed Accidents. Licensee Is Preparing Design Change (← links)
- PNO-I-81-094, on 810822,offsite Warning Sys Was Inadvertently Initiated.Caused by State Police Maint Activities on State Wide Paging Sys.Sirens Cut Off from Site (← links)
- PNO-I-81-102, on 810910,2-inch Hole Developed in 16-inch High Pressure Turbine Extraction Steam Line in Turbine Bldg. Licensee Commenced Controlled Shutdown & Implemented Emergency Plan to Evacuate Unnecessary Personnel (← links)
- PNO-I-81-042, on 810331,union Walkout Called for by Union Representatives for Contract Guard Force.No Workers Joined Strike.Strike Contingency Plans Were Implemented & Substitute Security Personnel Enlisted (← links)
- PNO-I-80-140, negotiations Between Labor & Plant Mgt Have Not Produced New Contract or Extension.Current Contract Expires at Midnight & Strike Is Possible.Strike Would Include Reactor Operators & Other Nuclear Technicians (← links)
- PNO-I-80-129, on 800914,plant Was Shutdown When One of Three Seals Failed on Three Reactor Coolant Pump.Shutdown Expected to Last Until 800918 (← links)
- PNO-I-89-090, on 891107,unplanned Shutdown for More than 48 H Due to Deterioration of Number 1 Reactor Coolant Pump First & Second Stage Shaft Seals.Licensee in Process of Resolving Seal Performance Problem (← links)
- PNO-I-80-063, on 800417,contract Guard Svc Employee Was Shot in Foot When Revolver Accidentally Discharged During Supervised Range Practice.Guard Trainee Admitted for Treatment to Hosp & Released (← links)
- ML19256C789 (← links)
- PNO-I-79-007, on 791016,while Performing 24-h Load Test of 1B Emergency Diesel Generator,Fire Occurred in Turbocharger Exhaust Piping.Diesel Shut Down on Generator Trip.Cause of Trip Unknown (← links)