Pages that link to "ML16279A479"
Jump to navigation
Jump to search
The following pages link to ML16279A479:
Displayed 50 items.
- ML17097A196 (← links)
- ML17144A154 (← links)
- ML17279A121 (← links)
- ML16351A210 (← links)
- ML16245A763 (← links)
- ML16248A006 (← links)
- ML16280A042 (← links)
- ML16280A035 (← links)
- ML16280A037 (← links)
- ML16189A402 (← links)
- ML16152A126 (← links)
- ML16133A041 (← links)
- ML16144A806 (← links)
- CAC:MF7710 (← links)
- Japan Lessons-Learned Division (← links)
- L-08-001, Response to Requests for Additional Information - License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated.. (← links)
- L-PI-18-063, Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 805 (← links)
- L-PI-18-051, Response to Request for Additional Information: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (← links)
- L-PI-18-038, Supplement to License Amendment Request to Revise License Condition Associated with Implementation of NFPA 805 (← links)
- L-PI-17-042, Response to Request for Additional Information Regarding License Amendment Request to Revise the NDE Inspection Interval for Special Lifting Devices (← links)
- L-PI-14-113, Updated Final Response to NRC Request for Information Per 10CFR50.54(f) Re Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- L-PI-17-035, License Amendment Request to Revise the Emergency Action Level (EAL) Scheme - Supplement and Response to Requests for Additional Information (← links)
- L-PI-17-032, Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Response Times (← links)
- L-PI-17-007, Response to Request for Additional Information on License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors (← links)
- L-PI-17-002, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.7 to Remove Non-Conservative Required Action (← links)
- L-PI-16-100, Response to NRC Request for Information - License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes (← links)
- L-PI-16-090, Response to Request for Additional Information on License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors (← links)
- L-PI-16-076, Supplement to the Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, Flood Hazard Reevaluation Report (← links)
- L-PI-16-063, Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- L-PI-16-040, Supplement to License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes: Westinghouse-Prepared Response to RAI, CE-16-237, Attachment 2 (Enclosure 4) (← links)
- L-PI-16-029, Response to Requests for Additional Information - License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2,,Using the Consolidated.. (← links)
- L-PI-16-004, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors- Response to Request for Additional Information (← links)
- L-PI-16-001, Enclosure 2: Responses to Open and Pending Items from the NRC Audit Report (← links)
- L-PI-15-105, License Amendment Request (LAR) to Revise Technical Specifications (TS) to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process - Response to Request.. (← links)
- L-PI-15-052, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors - Response to Request for Additional Information - 90-Day Responses (← links)
- L-PI-19-014, Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors (← links)
- L-PI-19-029, Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For... (← links)
- L-PI-19-037, Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals (← links)
- L-PI-16-067, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors- Response to Request for Additional Information (← links)
- L-PI-16-005, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors - Response to Request for Additional Information (← links)
- L-PI-20-026, Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiativ (← links)
- L-PI-21-032, Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island (← links)
- L-PI-21-045, Response to Request for Additional Information Cooling Water System License Amendment Request (← links)
- L-PI-21-047, Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 2 (← links)
- L-PI-22-033, Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles (← links)
- L-PI-22-034, Response to RAI, Alternative RR-08 Related to Pressure Isolation Valve Monitoring and Testing (← links)
- L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (← links)
- L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 (← links)
- L-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, (← links)
- L-PI-24-030, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 (← links)