Pages that link to "W3F1-2024-0041, Reply to a Notice of Violation, EA-24-052"
Jump to navigation
Jump to search
The following pages link to W3F1-2024-0041, Reply to a Notice of Violation, EA-24-052:
Displayed 50 items.
- W3F1-2021-0039, Application for Technical Specification Change to Revise Pressure/Temperature and Low Temperature Overpressure Protection for 55 Effective Full Power Years (← links)
- W3F1-2021-0055, Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual (← links)
- W3F1-2021-0050, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt (← links)
- W3F1-2021-0060, Response to Request for Additional Information Regarding License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual (← links)
- W3F1-2021-0061, Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual (← links)
- W3F1-2021-0063, Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial Emergency Preparedness Evaluated Exercise Requirements Due to Severe Storm Recovery (← links)
- W3F1-2021-0064, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 284 (← links)
- W3F1-2021-0074, Commitment Change Notification for Generic Safety Issue - 191 and Generic Letter 2004-02 (← links)
- W3F1-2022-0008, SR-22-001-00, Waterford Steam Electric Station, Unit 3, Radiation Monitors Inoperable Greater than 7 Days (← links)
- W3F1-2022-0011, Special Report SR-22-002-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days (← links)
- W3F1-2022-0026, Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 2022 (← links)
- W3F1-2022-0029, Annual Report of Individual Monitoring of Radiation Exposure for 2021 Per 10 CFR 20.2206 (← links)
- W3F1-2022-0028, Annual Radiological Environmental Operating Report - 2021 (← links)
- W3F1-2022-0009, Supplement to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors (← links)
- W3F1-2022-0020, Review of Preliminary Accident Sequence Precursor Report (← links)
- W3F1-2022-0017, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2021 (← links)
- W3F1-2022-0019, WAT-2022-02 Post Exam Analysis (← links)
- W3F1-2022-0015, Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf. (← links)
- W3F1-2022-0031, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Reflect Location of Standby Capsules 3/W-104 and 6/W-284 (← links)
- W3F1-2022-0044, SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days (← links)
- W3F1-2022-0042, SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days (← links)
- W3F1-2022-0049, Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 (← links)
- W3F1-2021-0057, (Waterford 3) - Emergency Plan Revision 052 (← links)
- W3F1-2022-0059, Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-505 (← links)
- W3F1-2022-0058, Reply to a Notice of Violation; EA-22-033 (← links)
- W3F1-2022-0054, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (← links)
- W3F1-2022-0063, Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 37 (← links)
- W3F1-2023-0002, SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days (← links)
- W3F1-2023-0010, Special Report SR 2023-002-00, Radiation Monitor Inoperable Greater than 7 Days (← links)
- W3F1-2023-0016, Registration of Dry Fuel Storage Cask Use (← links)
- W3F1-2023-0014, Reply to a Notice of Violation; EA-22-119 (← links)
- W3F1-2023-0013, Notification of Readiness for Supplemental Inspection (← links)
- W3F1-2023-0007, Registration of Dry Fuel Storage Cask Use (← links)
- W3F1-2023-0018, Updated Final Supplemental Response to NRC Generic Letter 2004-02 (← links)
- W3F1-2023-0022, Registration of Dry Fuel Storage Cask Use (← links)
- W3F1-2023-0021, Submittal of Special Report SR 2023-003-00 Radiation Monitor Inoperable Greater than 7 Days (← links)
- W3F1-2023-0025, Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.2206 (← links)
- W3F1-2023-0033, Submittal of Annual Radiological Environmental Operating Report - 2022 (← links)
- W3F1-2023-0032, Annual Radioactive Effluent Release Report (ARERR) 2022 (← links)
- W3F1-2023-0036, Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days (← links)
- W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program (← links)
- W3F1-2023-0049, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal (← links)
- W3F1-2023-0048, Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days (← links)
- W3F1-2023-0052, Core Operating Limits Report (COLR) - Cycle 26, Revision O (← links)
- W3F1-2023-0055, Reply to a Notice of Violation (← links)
- W3F1-2024-0019, (Waterford 3) - Steam Generator Tube Inspection Report for the 25th Rf Inspection Performed During Operating Cycle 25 / Refuel 25 (← links)
- W3F1-2024-0032, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation (← links)
- W3F1-2024-0024, Special Report SR 2023-004-02 Radiation Monitor Inoperable Greater than 7 Days (← links)
- W3F1-2024-0011, Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program (← links)
- W3F1-2024-0018, Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 25 / Refuel 25 (← links)