Pages that link to "RS-19-082, License Amendment Request to Revise Technical Specifications 3.7.9, Ultimate Heat Sink (UHS)"
Jump to navigation
Jump to search
The following pages link to RS-19-082, License Amendment Request to Revise Technical Specifications 3.7.9, Ultimate Heat Sink (UHS):
Displayed 50 items.
- ML14164A058 (← links)
- ML14164A055 (← links)
- ML111790037 (← links)
- ML111790033 (← links)
- ML111790031 (← links)
- ML18053A179 (← links)
- ML18053A166 (← links)
- ML18053A165 (← links)
- RA-14-032, Braidwood, Units 1 and 2, Attachment 2, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1001, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosure 2A, and 2B, Cover Through Pa (← links)
- RS-14-096, Braidwood & Byron, Units 1 and 2 - License Amendment Request to Administratively Clarify Technical Specifications (TS) 3.3.1, Reactor Trip System (RTS) Instrumentation, and TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instr (← links)
- ML080601230 (← links)
- NEI 99-01, Braidwood, Units 1 and 2, Attachment 2, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1001, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosure 2A, and 2B, Cover Through Pa (← links)
- RS-15-093, Second 10 CFR 54.21 (B) Annual Amendment to the Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, License Renewal Application (← links)
- RS-14-169, Responses to NRC Requests for Additional Information, Set 27, Dated May 21, 2014, and Correction of Previously Submitted Information Related to the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Applica (← links)
- RS-16-172, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪Sse with High Frequency Exceedances (← links)
- RS-16-085, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪Sse with High Frequency Exceedances (← links)
- RS-16-083, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪ SSE with High Frequency Exceedances (← links)
- RS-18-129, Supplement to License Amendment Request to Utilize Tvel TVS-K Lead Test Assemblies (← links)
- RS-17-091, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- RS-17-093, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 4, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- RS-16-171, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪ 2xSSE with High Frequency Exceedances (← links)
- RS-16-169, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.4 Path 4: GMRS ≪ 2xSSE (Partial Submittal - High Frequency Work Scope) (← links)
- RS-16-168, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪ SSE with High Frequency Exceedances (← links)
- RS-16-086, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪ SSE with High Frequency Exceedances (← links)
- RS-16-049, Supplemental Information Regarding Request for a License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink. (← links)
- RS-15-294, Response to Request for Additional Information Regarding Request for a License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink. (← links)
- RS-18-099, NEI 12-06, Appendix H, Revision 4, H.4.5 Path 5: GMRS ≫ 2 X SSE, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information (← links)
- RS-14-193, Request for a License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink. (← links)
- RS-13-240, License Amendment Request to Administratively Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program. (← links)
- RS-08-016, Application for Steam Generator Tube Interim Alternate Repair Criteria Technical Specification Amendment (← links)
- RS-06-116, License Amendment Request and Exemption Requests to Allow Use of Areva Np Inc., Advanced Mark-BW(A) Fuel Assemblies (← links)
- RS-18-035, License Amendment Request to Revise Technical Specification 3.2.3, Axial Flux Difference (← links)
- RS-17-123, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors. (← links)
- RS-17-058, License Amendment Request to Incorporate Changes Supported by TSTF-547, Clarification of Rod Position Requirements. (← links)
- RS-17-081, License Amendment Request to Revise Control Room Ventilation Temperature Control System Technical Specification (← links)
- RS-16-034, License Amendment Request and 10 CFR 50.12 Exemption Request for the Use of Optimized Zirlo Fuel Rod Cladding (← links)
- RS-19-018, Supplement to Application to Revise Technical Specifications to Adopt Risk Informed Completion Times (← links)
- RS-19-008, Application for Technical Specifications Change to Add LCO 3.0.9 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process (← links)
- RS-17-011, License Amendment Request to Delete Obsolete License Conditions and Revise Technical Specifications (← links)
- RS-14-337, Units 1 & 2 - License Amendment Request for Diesel Generator Load Rejection Surveillance Requirement (← links)
- RS-14-336, Units 1 and 2 - Supplemental Commitment Related to the October 31, 2014 Response to NRC Request for Additional Information, Set 42, Dated October 10, 2014, Related to License Renewal Application (← links)
- RS-14-096, Units 1 and 2 - License Amendment Request to Administratively Clarify Technical Specifications (TS) 3.3.1, Reactor Trip System (RTS) Instrumentation, and TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation (← links)
- RS-14-080, License Amendment Request for Adoption of Technical Specification Task Force (TSTF)- 513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation. (← links)
- RS-14-079, Units 1 and 2 - Response to NRC Requests for Additional Information, Set 11, Dated February 18,2014 Related to the License Renewal Application (← links)
- RS-13-175, Bryon, Units 1 and 2, License Amendment Request to Revise Technical Specifications Section 3.7.2, Main Steam Isolation Valves (Msivs). (← links)
- RS-12-223, License Amendment Request to Revise Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation. (← links)
- RS-12-009, License Amendment Request - Diesel Generator Steady State Maximum Frequency and Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel (← links)
- RS-12-023, License Amendment Request to Revise Tech Specs Sections 5.5.9, Steam Generator (SG) Program, and TS 5.6.9, Steam Generator (SG) Tube Inspection Report, for Permanent Alternate Repair Criteria (← links)
- RS-12-028, Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection. (← links)
- RS-11-099, Request for License Amendment Regarding Measurement Uncertainty Recapture (Mur) Power Uprate (← links)