Pages that link to "RS-18-123, Request for Alternative Follow-up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2)"
Jump to navigation
Jump to search
The following pages link to RS-18-123, Request for Alternative Follow-up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2):
Displayed 45 items.
- ML17054C255 (← links)
- ML17095A268 (← links)
- ML16162A211 (← links)
- ML16109A337 (← links)
- ML17249A298 (← links)
- ML14303A506 (← links)
- ML13016A515 (← links)
- ML12108A123 (← links)
- ML111330653 (← links)
- ML110590921 (← links)
- RS-17-168, Braidwood Station, Unit 2, Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1) (← links)
- ML101230179 (← links)
- ML101190527 (← links)
- ML100850495 (← links)
- ML100480699 (← links)
- ML093070271 (← links)
- ML080370181 (← links)
- ML072430034 (← links)
- ML070170502 (← links)
- ML063260074 (← links)
- RS-18-123, Braidwood Station, Unit 1 - Request for Alternative Follow-up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2) (redirect page) (← links)
- RS-18-123 (redirect page) (← links)
- ML18270A066 (redirect page) (← links)
- ML18288A252 (← links)
- ML19155A060 (← links)
- ET 23-0005, 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peen (← links)
- RA-23-0242, Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) (← links)
- RA-24-0193, Supplement to Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) (← links)
- ML18305A360 (← links)
- ML18331A037 (← links)
- ML18318A334 (← links)
- RS-18-125, Proposed Alternative Requirements for the Repair and Examination of Reactor Pressure Vessel Head Penetration Nozzles for the Fourth Lnservice Inspection Interval in Accordance with 10 CFR 50.55a(z)(1) (← links)
- ML18347B419 (← links)
- RS-19-015, Relief Request 14-RS-1 to Implement Code Case OMN-13 (← links)
- RS-10-046, Request for Relief from ASME Code Case N-729-1 Requirements for Examination of Reactor Vessel Head Penetration Welds (← links)
- RS-17-168, Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1) (← links)
- EPID:L-2018-LLR-0126 (← links)
- ML19155A060 (← links)
- ML19141A020 (← links)
- ML19136A386 (← links)
- ML032410022 (← links)
- ML030370743 (← links)
- ML023050067 (← links)
- ML020350153 (← links)
- RS-21-008, Request for Alternative: One-Time Deferral of Follow-Up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2) (← links)
- ML21134A006 (← links)
- RS-22-036, Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (← links)
- RS-22-110, Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request. (← links)
- ML22307A246 (← links)
- ML24194A022 (← links)