Pages that link to "RS-13-240, License Amendment Request to Administratively Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program."
Jump to navigation
Jump to search
The following pages link to RS-13-240, License Amendment Request to Administratively Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program.:
Displayed 50 items.
- ML16180A251 (← links)
- ML16133A438 (← links)
- ML15336A731 (← links)
- ML15341A316 (← links)
- ML15307A776 (← links)
- ML15286A276 (← links)
- ML15232A441 (← links)
- ML14239A427 (← links)
- ML14069A337 (← links)
- ML13326A107 (← links)
- ML13311B481 (← links)
- ML13284A106 (redirect page) (← links)
- ML13326A107 (← links)
- ML13281A000 (← links)
- ML111790031 (← links)
- TAC:MF2964 (← links)
- ML18067A181 (← links)
- ML103270445 (← links)
- ML103270435 (← links)
- ML092520512 (← links)
- ML091390368 (← links)
- ML083120487 (← links)
- ML081720264 (← links)
- ML081140601 (← links)
- ML081010177 (← links)
- ML080370155 (← links)
- ML073461180 (← links)
- ML072830343 (← links)
- ML071000245 (← links)
- ML063420522 (← links)
- ML062990266 (← links)
- ML060960558 (← links)
- RS-13-240, Braidwood Station Units 1 & 2, License Amendment Request to Administratively Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program. (redirect page) (← links)
- RS-13-240 (redirect page) (← links)
- RS-08-046, Supplemental Information Related to Steam Generator Tube Interim Alternate Repair Criteria Technical Specification (← links)
- RS-08-031, Response to Request for Additional Information Regarding Application for Steam Generator Tube Interim Alternate Repair Criteria Technical Specification (← links)
- RS-08-016, Application for Steam Generator Tube Interim Alternate Repair Criteria Technical Specification Amendment (← links)
- RS-07-109, Response to Request for Additional Information Regarding License Amendment Request to Allow Use of Areva Np Inc. Advanced Mark-BW(A) Fuel Assemblies (← links)
- RS-06-140, Response to Request for Additional Information to Support NRC Approval of a License Amendment Related to Technical Specification 5.5.9, Steam Generator (SG) Tube Surveillance Program, for Use During the Unit 2 Refueling.. (← links)
- RS-06-116, License Amendment Request and Exemption Requests to Allow Use of Areva Np Inc., Advanced Mark-BW(A) Fuel Assemblies (← links)
- RS-16-034, License Amendment Request and 10 CFR 50.12 Exemption Request for the Use of Optimized Zirlo Fuel Rod Cladding (← links)
- RS-19-018, Supplement to Application to Revise Technical Specifications to Adopt Risk Informed Completion Times (← links)
- RS-14-337, Units 1 & 2 - License Amendment Request for Diesel Generator Load Rejection Surveillance Requirement (← links)
- RS-13-175, Bryon, Units 1 and 2, License Amendment Request to Revise Technical Specifications Section 3.7.2, Main Steam Isolation Valves (Msivs). (← links)
- RS-12-009, License Amendment Request - Diesel Generator Steady State Maximum Frequency and Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel (← links)
- RS-12-023, License Amendment Request to Revise Tech Specs Sections 5.5.9, Steam Generator (SG) Program, and TS 5.6.9, Steam Generator (SG) Tube Inspection Report, for Permanent Alternate Repair Criteria (← links)
- RS-12-028, Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection. (← links)
- RS-11-136, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications (TS) 3.3.1 (← links)
- RS-10-197, License Amendment Request to Revise Technical Specifications (TS) Sections 5.5.9, Steam Generator Program, and TS 5.6.9, Steam Generator Tube Inspection Report, for Temporary Alternate Repair Criteria (← links)
- RS-10-114, License Amendment Request Regarding Low Temperature Overpressure Protection and Loss of Decay Heat Removal (← links)
- RS-10-052, License Amendment Request for an Extension of the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process (← links)