Pages that link to "RIS 2008-10, Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-JH 23, NRC, NRC Regulatory Issue Summary 2008-10 Fatigue Analysis of Nuclear Power Plan Components (April 11, 2008)"
Jump to navigation
Jump to search
The following pages link to RIS 2008-10, Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-JH 23, NRC, NRC Regulatory Issue Summary 2008-10 Fatigue Analysis of Nuclear Power Plan Components (April 11, 2008):
Displayed 28 items.
- ML082340969 (redirect page) (← links)
- RIS 2008-30, Fatigue Analysis of Nuclear Power Plant Components (← links)
- RIS 2008-28, Endorsement of Nuclear Energy Institute Guidance for Reactor Vessel Head Heavy Load Lifts (← links)
- RIS 2008-10 (redirect page) (← links)
- Information Notice 2009-05, Contamination Events Resulting from Damage to Sealed Radioactive Sources During Gauge Dismantlement and Non-Routine Maintenance Operations (← links)
- ML080950235 (← links)
- RIS 2009-07, Status Update for Implementation of NRC Regulatory Authority for Certain Naturally Occurring and Accelerator-Produced Radioactive Material (← links)
- RIS 2009-14, Licensing Approach for In-Situ Recovery Facility Application Scenarios (← links)
- RIS 2009-05, Uranium Recovery Policy Regarding: (1) The Process for Scheduling Licensing Reviews of Application for New Uranium Recovery Facilities and (2) the Restoration of Groundwater at Licensed Uranium In Situ Recovery ... (← links)
- RIS 2008-10, 2008/04/11-Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-JH 23, Nrc, NRC Regulatory Issue Summary 2008-10 Fatigue Analysis of Nuclear Power Plan Components (April 11, 2008) (← links)
- RIS 2009-09, Withdrawn NRC Regulatory Issue Summary 2009-09: Use of Multiple Dosimetry and Compartment Factors in Determining Effective Dose Equivalent from External Radiation Exposures (← links)
- RIS 2008-24, Security Responsibilities of Service Providers and Client Licensees (← links)
- RIS 2008-19, Lessons-Learned from Recent 10 CFR Part 70 License-Transfer Application Reviews (← links)
- RIS 2009-05, Uranium Recovery Policy Regarding: (1) the Process for Scheduling Licensing Reviews of Application for New Uranium Recovery Facilities and (2) the Restoration of Groundwater at Licensed Uranium in Situ Recovery ... (← links)
- ML100620259 (← links)
- ML083440600 (← links)
- ML083290331 (← links)
- ML083230738 (← links)
- ML083230731 (← links)
- ML083230730 (← links)
- ML082401825 (← links)
- ML082330419 (← links)
- ML082320362 (← links)
- ML082261308 (← links)
- ML082000077 (← links)
- ML081570605 (← links)
- ML081350188 (← links)
- ML081350107 (← links)
- ML081280335 (← links)
- ML081220876 (← links)
- ML081150800 (← links)
- ML14322A847 (← links)
- ML100321956 (← links)
- RIS 2008-10, Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-JH 23, NRC, NRC Regulatory Issue Summary 2008-10 Fatigue Analysis of Nuclear Power Plan Components (April 11, 2008) (← links)
- RIS 2008-010 (redirect page) (← links)
- RIS 2008-24, Security Responsibilities of Service Providers and Client Licensees (← links)
- RIS 2008-32, Interim Low Level Radioactive Waste Storage at Reactor Sites (← links)
- RIS 2008-25, Primary Water Stress Corrosion Cracking of Dissimilar Metal Butt Welds in Pressurized Water Reactor Primary Coolant System Piping Welds (← links)
- RIS 2008-19, Lessons-Learned from Recent 10 CFR Part 70 License-Transfer Application Reviews (← links)
- RIS 2008-20, Redesignation of Safeguards Advisory for Operating Power Reactors (SA-05-02) (← links)
- RIS 2008-22, Notification of Licensees Regarding Aircraft Threats (← links)
- RIS 2008-21, Issuance of LIC-109, Acceptance Review Procedures. (← links)
- RIS 2008-16, Withdrawn NRC Regulatory Issue Summary 2008-16: Preparation and Scheduling of Operator Licensing Examinations (← links)
- RIS 2008-12, Enclosure 4: List of Recently Issued FSME Generic Communications (← links)
- RIS 2008-10, Fatigue Analysis of Nuclear Power Plant Components (← links)
- RIS 2008-15, NRC Staff Position on Crediting Mitigating Strategies Implemented in Response to Security Orders in Risk-informed Licensing Actions and in the Significance Determination Process (← links)
- RIS 2008-26, Clarified Requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(Y) When Implementing 10 CFR Section 50.54(x) to Depart from a License Condition or Technical Specification (← links)
- RIS 2008-27, Staff Position on Extension of the Containment Type a Test Interval Beyond 15 Years Under Option B of Appendix J to 10 CFR Part 50 (← links)
- RIS 2008-12, Enclosure 2: List of Low-Level Radioactive Waste Compacts and Unaffiliated States (← links)
- RIS 2008-12, Enclosure 3 - Bibliography (← links)
- RIS 2008-12, Enclosure 1: Information That NRC Staff May Require To Authorize Extended Interim Storage of Low-Level Radioactive Waste (← links)
- RIS 2008-12, Considerations for Extended Interim Storage of Low-Level Radioactive Waste By Fuel Cycle and Materials Licensees (← links)
- RIS 2008-05, Lessons Learned to Improve Inspections, Tests, Analyses, and Acceptance Criteria Submittal (← links)
- RIS 2008-06, Protection Against the Malevolent Use of Vehicles When Utilizing Landform Obstacles (← links)
- RIS 2008-04, Discontinuation of Two Performance Indicators Associated with the Security Reactor Oversight Process (← links)
- RIS 2008-03, Return/Reuse of Water Containing Previously Discharged Radioactive Effluents from Operating Nuclear Power Plants (← links)
- RIS 2008-10, 2008/04/11-Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-JH 23, NRC, NRC Regulatory Issue Summary 2008-10 Fatigue Analysis of Nuclear Power Plan Components (April 11, 2008) (redirect page) (← links)
- RIS 2008-08, Voluntary Submission of Performance Indicator Data (← links)