Pages that link to "RC-18-0070, (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ..."
Jump to navigation
Jump to search
The following pages link to RC-18-0070, (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ...:
Displayed 50 items.
- ML17031A015 (← links)
- ML16161A045 (← links)
- ML16124A897 (← links)
- ML15176A315 (← links)
- ML15007A161 (← links)
- ML14079A614 (← links)
- ML13301A767 (← links)
- ML13177A078 (← links)
- ML13101A333 (← links)
- ML12289A050 (← links)
- RC-17-0009, VC Summer Nuclear Station - Cancellation of Licensee Event Report (LER) 2016-005-00 Steam Propagation Barrier Degraded Due to Removal of Ventilation Duct Access Panel for Surveillance Activities (← links)
- RC-16-0147, VC Summer Nuclear Station, Unit 1, Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Pursuant to Title 10 9f the Code of Federal Regulations 05.54(f) (← links)
- RC-15-0076, VC Summer 2015-301 Initial Exam Post Exam Comments (← links)
- RC-15-0055, V.C. Summer, Report of Status of Decommissioning Funding (← links)
- RC-14-0135, V. C. Summer Unit 1, Request for Information for NRC Problem Identification and Resolution Inspection (← links)
- RC-14-0084, Special Report 2014-003 for V.C. Summer, One or More Required Meteorological Monitoring Channels Being Inoperable for More than Seven (7) Days (← links)
- RC-14-0085, Special Report 2014-002 for V.C. Summer, Degraded Conditions Lasting Longer than Seven Days (← links)
- RC-14-0045, Guarantee of Payment of Deferred Premiums Annual 10 CFR 140.21(E) Report for Virgil C. Summer Nuclear Station (Vcsns), Unit 1 (← links)
- RC-14-0014, V. C. Summer, Unit 1, Response to NRC Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding Walkdowns (← links)
- RC-13-0170, Virgil S. Summer Nuclear Station (Vcsns), Unit 1, 10 CFR 50.59 Biennial Report (← links)
- RC-13-0136, Virgil C Summer, Unit 1 - NRC Request for Information Aircraft Impact Inspection and Request for Information (← links)
- RC-13-0037, Virgil C. Summer Nuclear Station, Unit 1, License Amendment Request - LAR (13-00705) Technical Specification Change to Extend Integrated Leak Rate Test Frequency to 15 Years (← links)
- ML18186A588 (← links)
- RC-12-0132, V. C. Summer, Unit 1, South Carolina Electric & Gas (SCE & G) Response to Request for Additional Information License Amendment Request - LAR 10-093912, Technical Specification Change Request for TS 3.5.4, Refueling Water Storage Tank (← links)
- RC-12-0110, Virgil C. Summer Nuclear Station Unit 1 - Request for Weld Recategorization and Use of Alternatives to ASME Code Inspection Interval for VCSNS Third Ten Year Inservice Inspection (RR-III-08) (← links)
- RC-11-0062, V. C. Summer, License Amendment Request - LAR 04-02961, License Amendment Request for Slave Relay Surveillance Testing (← links)
- RC-10-0002, Virgil C. Summer, Unit 1 - Supplemental Response to Request for Additional Information for License Amendment Request-LAR-04-02911(Alternative Source Term) (← links)
- RC-09-0159, Virgil C. Summer Nuclear Station, Unit 1 - Response to Request for Additional Information for License Amendment Request - LAR-04-02911 (Alternative Source Team) (← links)
- RC-09-0072, Virgil C. Summer, Unit 1, Submittal of Supplement Information to License Amendment Request LAR 04-02911 and Related Technical Specification Changes to Implement Full-Scope Alternative Source Term in Accordance with 10 CFR 50.67 (← links)
- RC-09-0033, Virgil C Summer Nuclear Station - Guarantee of Payment of Deferred Premium Annual 10CFR140.21(e) Report (← links)
- RC-08-0043, V. C. Summer, Unit 1 - Transmittal of the 2007 Annual Operating Report (← links)
- RC-07-0169, Virgil Summer - 10 CFR 50.59 Biennial Report Covering the Period from October 1, 2005 Until October 1, 2007 (← links)
- RC-07-0074, V. C. Summer - Ninety-Day Response to GL 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. (← links)
- RC-07-0043, V.C. Summer Report of Status of Decommissioning Funding (RR-1950) (← links)
- RC-06-0202, V. C. Summer - ECCS Evaluation Model Revisions Report, Addresses the Effect of Using a Finer Break Spectrum (← links)
- ML063070540 (← links)
- RC-06-0173, V. C. Summer - LAR 05-2926, Implementation of WCAP-14333-P-A, Rev. 1, Probabilistic Risk Analysis of RPS and ESFAS Test Times and Completion Times - Summarized List of Commitments (← links)
- RC-05-0180, V. C. Summer License Amendment Request - LAR 05-3666, Alternate AC Power Supply Revision to Submitted Technical Specification Pages and Response to Verbal Request for Additional Information (← links)
- RC-06-0094, April 2006 Monthly Operating Report for Virgil C. Summer Nuclear Station (← links)
- RC-06-0073, March 2006 Monthly Operating Report for V.C. Summer Nuclear Station (← links)
- ML060100448 (← links)
- RC-01-0138, Transmittal of Revised Emergency Plan Procedures EPP-023, Rev. 12 & EPP-051, Rev. 6 for Virgil C. Summer Nuclear Station (← links)
- ML18282A046 (redirect page) (← links)
- ML18299A012 (← links)
- ML18345A060 (← links)
- ML19023A420 (← links)
- ML19091A058 (← links)
- ML20156A226 (← links)
- ML20248H378 (← links)
- RC-18-0070, Virgil C. Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Co (redirect page) (← links)
- RC-18-0070 (redirect page) (← links)
- RC-18-0084, Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Requ (← links)
- RC-18-0079, Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error (← links)
- RC-16-0001, V.C. Summer, Report of Full Compliance with March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) and Responses to Requests for Additional Information (← links)
- RC-13-0123, V. C. Summer, Unit 1 - First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) (← links)
- RC-12-0153, South Carolina Electric & Gas (Sce&G) Company'S Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)