Pages that link to "RA-24-0094, Request for Approval of Duke Energy Corporation Transition to ANSI/ANS3.1-2014, American National Standard for Selection and Training of Nuclear Power Plant Personnel and Revision 4 of Regulatory Guide 1.8, Rev. 4 Qualification and Traini"
Jump to navigation
Jump to search
The following pages link to RA-24-0094, Request for Approval of Duke Energy Corporation Transition to ANSI/ANS3.1-2014, American National Standard for Selection and Training of Nuclear Power Plant Personnel and Revision 4 of Regulatory Guide 1.8, Rev. 4 Qualification and Traini:
Displayed 50 items.
- RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation (← links)
- RA-23-0313, Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation (← links)
- RA-23-0320, Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency (← links)
- RA-23-0306, Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. (← links)
- RA-24-0015, Submittal of 2023 Sea Turtle Annual Report (← links)
- RA-23-0242, Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) (← links)
- RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX (← links)
- RA-24-0006, 10 CFR 50.54(q) Evaluation (← links)
- RA-23-0295, Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval (← links)
- RA-24-0012, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report (← links)
- RA-24-0045, Cycle 29, Revision 0, Core Operating Limits Report (COLR) (← links)
- RA-24-0208, Refuel 26 (C2R26) Inservice Inspection (ISI) Report (← links)
- RA-24-0209, Regulatory Conference, Additional Supporting Information (← links)
- RA-24-0203, Regulatory Conference Supporting Information (← links)
- RA-24-0197, Subsequent License Renewal Application Response to Request for Additional Information 2024 Annual Update and Subsequent License Renewal Application Supplement 5 Addition (← links)
- RA-24-0165, Response to Request for Additional Information (RAI) Regarding Proposed Alternative for the Fifth Ten-Year Inservice Inspection Interval Limited Examinations (← links)
- RA-24-0178, Independent Spent Fuel Storage Installation (ISFSI) Docket No. 72-06 - Registration for Use of General License Spent Fuel Casks (← links)
- RA-24-0172, Supplement to a Request for Additional Information Response Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications (← links)
- RA-24-0137, Relief Requests for Inservice Testing Plan – Fifth Interval (← links)
- RA-24-0173, Renewed License Number DPR-23 Request Review of White Papers to Determine Fracture Toughness-based Reference Temperature of Heat Number W5214 Weld (← links)
- RA-24-0166, Revision to Emergency Plan Implementing Procedure (← links)
- RA-24-0164, Inservicee Inspection Program Owners Activity Report Refueling Outage 25 (← links)
- RA-24-0163, Registration for Use of General License Spent Fuel Casks (← links)
- RA-24-0154, Supplemental Information Supporting the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) Using Risk-Informed Process for Evaluations (← links)
- RA-24-0136, Subsequent License Renewal Application Third Annual Update to the License Renewal Application and Subsequent License Renewal Application Supplement 5 (← links)
- RA-24-0152, Duke Energy Carolinas, LLC - Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI (← links)
- RA-24-0132, Transmittal of Oconee Unit 2, Refuel 31 (O2R31) Steam Generator Tube Inspection Report (← links)
- RA-24-0110, Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical. (← links)
- RA-24-0030, Duke Energy - Annual Radioactive Effluent Release Report - 2023 (← links)
- RA-24-0083, Annual Report of Changes Pursuant to 10 CFR 50.46 (← links)
- RA-24-0096, Instrumentation and Control Safety Systems NRC Review of Framatome TXS-Compact Topical Report (← links)
- RA-24-0101, (Mns), Units 1 and 2, Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency (← links)
- RA-24-0031, Annual Radiological Environmental Operating Report - 2023 (← links)
- RA-24-0103, Response to Request for Additional Information (RAI) Regarding License Amendment Request for a One-Time Extension to the Integrated Leak Rate Test Interval (← links)
- RA-24-0117, Cycle 26 Core Operating Limits Report, Revision O (← links)
- RA-24-0099, Reactor and Senior Reactor Operator Initial Examination Outlines (← links)
- RA-24-0106, Annual Environmental (Non-Radiological) Operating Report (← links)
- RA-24-0097, Response to Request for Supplemental Information Supporting the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) Using Risk-Informed Process for Evaluations (← links)
- RA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations (← links)
- RA-24-0086, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums (← links)
- RA-24-0085, Onsite Property Insurance Coverage (← links)
- RA-24-0082, Core Operating Limits Report (COLR) for Unit 2 Cycle 27 Reload Core (← links)
- RA-24-0073, Transmittal of Oconee Unit 2, Refuel 31 (O2R31) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval (← links)
- RA-24-0062, 10 CFR 50 .54(q) Evaluation (← links)
- RA-24-0058, Cycle 25 Core Operating Limits Report (COLR) (← links)
- RA-24-0067, Independent Spent Fuel Storage Installation (ISFSI) (← links)
- RA-24-0033, Response to Request for Additional Information Regarding the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals (← links)
- RA-24-0004, End of Cycle 29 (M1R29) Inservice Inspection Summary Report (← links)
- RA-24-0053, Registration for Use of General License Spent Fuel Cask Number 176 (← links)
- RA-23-0300, Fifth Ten-Year Inservice Inspection Interval Limited Examinations (← links)