Pages that link to "RA-21-0067, Response to Request for Additional Information - Relief Request, Service Water Pinhole Leak in a Socket Weld, Inservice Inspection Program, Fourth Ten-Year Interval"
Jump to navigation
Jump to search
The following pages link to RA-21-0067, Response to Request for Additional Information - Relief Request, Service Water Pinhole Leak in a Socket Weld, Inservice Inspection Program, Fourth Ten-Year Interval:
Displayed 50 items.
- ML16315A272 (← links)
- ML092310353 (← links)
- ML081330466 (← links)
- ML081330465 (← links)
- ML081330464 (← links)
- ML080460093 (← links)
- HNP-18-020, Supplement to Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses (← links)
- HNP-16-029, Response to Request for Additional Information Regarding License Amendment Request for Main Steam Safety Valve Lift Setting Tolerance Change (← links)
- HNP-06-081, Submittal of Inservice Inspection Summary Report for Harris Nuclear Plant (← links)
- RA-18-0175, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors. (← links)
- RA-18-0171, Supplemental Information for License Amendment Request Regarding Reactor Trip System and Engineered Safety Features Actuation System Instrumentation Trip Setpoints (← links)
- RA-18-0066, Cycle 21 Owner'S Activity Report (← links)
- HNP-18-002, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements (← links)
- HNP-18-003, Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses (← links)
- HNP-17-078, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements (← links)
- HNP-17-084, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements (← links)
- HNP-17-082, Response to Request for Additional Information Regarding License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Limit Detailed In.. (← links)
- HNP-17-025, Fourth Interval Lnservice Inspection Plan, Third Interval Containment Lnservice Inspection Plan, and Fourth Interval Lnservice Inspection Pressure Test Plan (← links)
- HNP-17-062, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal (← links)
- HNP-17-034, Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106.. (← links)
- HNP-16-116, Response to Request for Additional Information Regarding License Amendment Request to Modify Diesel Fuel Oil Testing Surveillance Requirements (← links)
- HNP-16-086, Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specifications Pertaining to the Explosive Gas and Storage Tank Radioactivity Monitoring Program (← links)
- HNP-16-092, Relief Request I3R-16, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Third Ten-Year Interval (← links)
- HNP-16-072, Supplement to the License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement (← links)
- HNP-16-056, Response to Second Request for Additional Information Regarding License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement (← links)
- HNP-16-034, Transmittal of Response to Second Request for Additional Information Regarding the License Amendment Request to Revise Technical Specifications by Relocating Specific Surveillance Frequency Requirements to a Licensee.. (← links)
- HNP-16-008, Response to Request for Additional Information Regarding License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement (← links)
- HNP-16-011, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications by Relocating Specific Surveillance Frequency Requirements to a Licensee Controlled Program (← links)
- HNP-15-102, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.. (← links)
- HNP-15-091, Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Action Level Scheme to One Based on Revision 6 of NEI 99-01, Development of Emergency Action Levels for Non-Passive Reactors (← links)
- HNP-15-064, Submits 90-day Inservice Inspection Summary Report (← links)
- HNP-15-037, Relief Request I3R-15, Reactor Vessel Closure Head Nozzle Repair Technique, Response to Request for Additional Information (← links)
- HNP-15-034, Relief Request I3R-15 Revision and Supplement, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program - Third Ten-Year Interval (← links)
- HNP-15-010, Relief Request I3R-15, Reactor Vessel Closure Head Nozzle Repair Technique Inservice Inspection Program - Third Ten-Year Interval (← links)
- HNP-14-099, Relief Request I3R-14, Deferral of Reactor Vessel Inspections Inservice Inspection Program - Third Ten-Year Interval Response to Request for Additional Information (← links)
- HNP-13-119, Relief Request I3R-13, Reactor Vessel Closure Head Nozzle 37, Inservice Inspection Program - Third Ten-Year Interval (← links)
- HNP-13-057, Relief Request I3R-11 Reactor Vessel Closure Head Nozzles Lnservice Inspection Program - Third Interval (← links)
- HNP-11-045, 180-Day Steam Generator Tube Inspection Report (← links)
- HNP-11-017, 90-Day Inservice Inspection (ISI) Summary Report (← links)
- HNP-09-095, Response to Request for Additional Information Regarding Relief Requests 2R1-018, 2R1-019, 2R1-020, 2R1-021, 2R1-022, 2R2-009, 2R2-010, & 2R2-011 for the Second 10-Year Inservice Inspection Program (← links)
- RA-18-0106, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Supplement and Request for Additional Information Response (← links)
- HNP-09-076, 90-Day Inservice Inspection (ISI) Summary Report (← links)
- HNP-08-067, Supplement to Third Interval Inservice Inspection Relief Request 13R-02 Submittal (← links)
- HNP-07-179, 90-Day Inservice Inspection (ISI) Summary Report (← links)
- HNP-07-145, Inservice Inspection Relief Request 1, Summary of Ultrasonic Examinations of Preemptive Weld Overlays for Pressurizer Nozzle Locations Containing Alloy 600 Materials (← links)
- HNP-07-042, Revision of the Relief Request from ASME OM Code Inservice Testing Requirements for the Third Ten-Year Interval Plan (← links)
- HNP-06-141, Relief Request from ASME OM Code Inservice Testing Requirements for the Third Ten-Year Interval Plan (← links)
- HNP-06-091, Relief Requests from ASME Code Inservice Testing Requirements to Allow Online Disassembly of Certain Check Valves (← links)
- RA-18-0261, Response to Request for Additional Information Regarding License Amendment Request on Reactor Trip System and Engineered Safety Features Actuation System Instrumentation Trip Setpoints (← links)
- RA-18-0248, Response to Request for Additional Information Regarding License Amendment Request for Emergency Action Level Scheme Change (← links)