- PNO-I-96-086, on 961205,plant Engineers Identified Three Inadequate Cable Seperation Issues Affecting Reactor Protection Sys.Both Buttons of Either Pair of Trip Push Buttons Required to Be Depressed,To Initiate Manual Trip (← links)
- PNO-I-85-055, instrumentation Valves Mispositioned.State of Me Notified by Telcon on 850807.W/o Encl (← links)
- PNO-I-80-054, on 800402,plant Tripped from Full Power Due to Ground in Reactor Protective Sys.Ground Will Be Repaired & Plant Returned to Svc (← links)
- PNO-I-80-030, on 800218,while Refueling Core W/Pool Clarity & W/Approx 1/3 Core in Place,Problems Experienced in Seating Assembly.Assembly Placed in Core Improperly & Tilted Over. Area Evacuated (← links)
- PNO-I-80-031, on 800131,licensee Identified Nine Fuel Assemblies Containing Leaking Fuel Pins.At Least Two Pins Appeared to Have Missing Segments.Cause Not Stated.Damaged Fuel Assemblies Being Replaced (← links)
- ML20151X581 (← links)
- PNO-I-97-046, on 970801,Maine Yankee Announced That Negotiations W/Peco Have Ceased & Plant Owners Agreed to Proceed W/Decommissioning.Majority of Contractors Released in May When Board Elected to Minimize Spending (← links)
- PNO-I-86-101, on 861230,leak from Blank Flange on Addition Line Connected to Vol Control Tank Discovered.Caused by Personnel Error.Release Well Below Tech Spec Limits & Radiation Monitor Readings Subsequently Decreased to Normal (← links)
- PNO-I-99-030, on 990630,licensee Notified NRC Region I That Shipping Container Loaded with Internally Contaminated Vacuum Cleaning Device,Used at Maine Yankee for Asbestos Removal,Was Damaged.No Radioactive Matl Was Released (← links)
- PNO-I-89-077, on 890907,bomb Threats Received to Licensee Corporate Ofc.Searches for Explosive Devices Conducted by Both Plant Operations & Security Personnel in Both Protected & owner-controlled Areas.No Explosive Devices Found (← links)
- ML20236V391 (← links)
- PNO-I-87-058A, on 870625,licensee Completed Unscheduled Shutdown to Repair Vibration Problems on Main Turbine Generator Unit.Plant Continued to Experience Vibrations. Plant Manually Tripped from 25% Power on 870701 (← links)
- PNO-I-87-058, on 870623,plant Shutdown Due to Higher Vibrations of Turbine/Generator Radial.Licensee Estimates Shutdown Will Be Min of 3 Days (← links)
- PNO-I-96-086A, on 961205,Maine Yankee Personnel Identified Inadequate Cable Separation Issues Affecting Reactor Protection Sys.Licensee in Process of Developing Scope for Expanded Review & Process for Field Verification (← links)