Pages that link to "LIC-16-0044, Calculation FC08499 Evaluation of FCS Concrete Compressive Strength Test Data"
Jump to navigation
Jump to search
The following pages link to LIC-16-0044, Calculation FC08499 Evaluation of FCS Concrete Compressive Strength Test Data:
Displayed 50 items.
- ML17264A750 (← links)
- ML17041A443 (← links)
- ML17041A444 (← links)
- ML17089A544 (← links)
- ML17268A221 (← links)
- ML16165A028 (← links)
- ML16165A029 (redirect page) (← links)
- ML17278A607 (← links)
- ML16057A074 (← links)
- ML17348A623 (← links)
- ML15350A019 (← links)
- ML15350A018 (← links)
- ML18088B378 (← links)
- ML18106A038 (← links)
- ML081070326 (← links)
- ML081070325 (← links)
- LIC-08-0037, Calculation FC05694, Calculation of Minimum Reactor Coolant Time Using Shutdown Cooling System, Attachment 2, Pages 91 Through End (← links)
- LIC-08-0037, Calculation FC05694, Calculation of Minimum Reactor Coolant Time Using Shutdown Cooling System, Attachment 2, Pages 51 Through 90 (← links)
- LIC-08-0037, Calculation FC05694, Calculation of Minimum Reactor Coolant Time Using Shutdown Cooling System. (← links)
- LIC-18-0015, CH-ODCM-0001, Revision 27, Off-Site Dose Calculation Manual. (← links)
- LIC-18-0015, CH-ODCM-0001, Revision 26, Off-Site Dose Calculation Manual. (← links)
- LIC-16-0044 (redirect page) (← links)
- ML061640242 (← links)
- ML061640241 (← links)
- ML061640239 (← links)
- LIC-17-0068, Reply to Final Request for Additional Information (RAI) for Fort Calhoun Exemption from 10 CFR 140.11 (a)(4), Off-site Primary and Secondary Liability Insurance (MF9664) (← links)
- LIC-17-0024, Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 4 of 4) (← links)
- LIC-16-0025, Ft. Calhoun, Unit 1 - Response to Request for Additional Information Adoption of TSTF-501, Revision 1 (← links)
- LIC-17-0065, Submittal of Response to Request for Additional Information Re Fort Calhoun Request to Revise Their Technical Specifications to Align to Those Requirements for Decommissioning (← links)
- LIC-17-0047, Final Request for Additional Information Concerning License Amendment Request 16-07: Revise the Emergency Plan to the Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme (← links)
- LIC-17-0045, Response to Request for Additional Information Defueled Emergency Plan Exemption Request (← links)
- LIC-17-0020, Response to Request for Additional Information, Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment (← links)
- LIC-16-0109, Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (Attachments 1, 2, 4, 5 and 6) (← links)
- LIC-16-0107, Final Response to the Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident and Corresponding Commitments (← links)
- LIC-16-0090, Response to Request for Additional Information Regarding Certified Fuel Handler Training Program (← links)
- LIC-16-0078, Revision to Response to Request for Information Regarding Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - Flood Hazard Reevaluation Report (← links)
- LIC-16-0022, Response to NRC Request for Additional Information Revise Current Licensing Basis to Allow Use of Equipment Classification Methodology from ANSI/ANS-58.14-2011 (← links)
- LIC-16-0001, Response to NRC Request for Additional Information Technical Specification Administrative Changes (← links)
- LIC-15-0147, Response to NRC Request for Additional Information Fifth Lnservice Testing Interval Relief Requests P-1 and P-2 (← links)
- LIC-15-0129, Addendum to Response to Request for Information Regarding Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - Flood Hazard Reevaluation Report (← links)
- LIC-15-0113, Response to Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (← links)
- LIC-17-0054, Submission of Corrected Pages for Response to Request for Additional Information, Fort Calhoun Station, Unit No. 1 - Request for Additional Information Certified Fuel Handler Training Program (← links)
- LIC-17-0048, Response to Request for Additional Information Regarding the Fort Calhoun Station Request to Revise Technical Specifications to Align Staffing Requirements for Permanently Defueled Condition (← links)
- LIC-17-0037, Response to Request for Additional Information, Fort Calhoun Station, Unit No.1 - Final Request for Additional Information Concerning Exemption from the Requirements of 10 CFR 50.47 and Appendix E (← links)
- LIC-17-0036, Supplemental Response to Request for Additional Information - Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment (← links)
- LIC-15-0102, Response to NRC Request for Additional Information Re License Amendment Request to Adopt Emergency Action Level Scheme Per NEI 99-01, Rev. 6 (← links)
- LIC-15-0139, ISFSI - Supplemental OPPD Response to NRC Request for Additional Information License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 (← links)
- LIC-15-0121, ISFSI - Supplemental OPPD Response to NRC Request for Additional Information License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 (← links)
- LIC-15-0115, ISFSI - Response to NRC Request for Clean Copy of Emergency Action Level Technical Basis Document (← links)
- LIC-08-0067, Response to Request for Additional Information Relief Request for Valve Replacement and Supplemental Information (← links)
- LIC-18-0018, Independent Spent Fuel Storage Installation - Emergency Plan Update (← links)