- JAFP-07-0020, Submittal of James A. Fitzpatrick - Inservice Inspection Summary Report 2006 Refuel Outage (Reload 17/Cycle 18) (← links)
- JAFP-07-0050, Proposed Relief Requests for the James A. FitzPatrick Power Plant Fourth Interval In-Service Testing Program (← links)
- JAFP-19-0004, Inservice Inspection Summary Report Cycle 23 (← links)
- JAFP-18-0113, Fifth Ten-Year Lnservice Inspection Interval Program Plan (← links)
- JAFP-18-0078, Fifth Ten-Year Interval Inservice Testing Program Plan (← links)
- JAFP-17-0057, Inservice Inspection Summary Report 2017 Refuel Outage 22 (← links)
- JAFP-16-0136, Alternative Examination Requirements Nozzle-to-Vessel Welds and Nozzle Inner Radii Using ASME Code Case N-702 and BWRVIP-241 (← links)
- JAFP-14-0012, Inservice Testing Program 10 CFR 50.55a Request PRR-05 (← links)
- JAFP-13-0004, Inservice Inspection Summary Report 2012 Refuel Outage (Reload 20/Cycle 21) (← links)
- JAFP-11-0009, Inservice Inspection Summary Report 2010 Refuel Outage (Reload 19/Cycle 20) (← links)
- JAFP-09-0088, Proposed Relief Request VRR-06 for the Fourth Interval In-Service Testing Program (← links)
- JAFP-09-0008, Response to Request for Additional Information Regarding: Request for Additional Information Third Ten-Year Inservice Inspection Interval Program Plan Relief Request RR-CRV-01 (← links)
- JAFP-09-0004, Inservice Inspection Summary Report 2008 Refuel Outage (Reload 18/Cycle 19) (← links)
- JAFP-08-0109, Submittal of the Final Ultrasonic Test Results on the N2C-SE Weld Overlay (← links)
- JAFP-08-0038, Inservice Inspection Program Relief Requests Third Ten-year Interval Closeout (← links)
- JAFP-07-0116, Fourth Interval Inservice Testing Program for Pumps and Valves (← links)
- JAFP-07-0107, Response to Request for Additional Information Regarding Proposed Relief Request PRR-01 for the Fourth Interval In-Service Testing Program (← links)
- JAFP-07-0030, Fourth Inservice Inspection Interval Inspection Program Plan (← links)
- JPN-05-009, Entergy Response to NRC Request for Information on Entergy Actions to Ensure Employees at FitzPatrick Remain Willing to Raise Safety Concerns (Letter Dated June 15, 2005) (← links)
- JAFP-05-0151, Request for Approval of Relief Request No. RR-39, Implementation of BWRVIP Guidelines in Lieu of ASME Section XI Code Requirements on Reactor Vessel Internals and Components Inspection (← links)
- ML051580203 (← links)
- JPN-05-005, Status of Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc., for Year Ending December 31,2004 - 10 CFR 50.75(f)(1) (← links)
- JAFP-05-0013, Inservice Inspection Summary Report 2004 Refuel Outage (Reload 16/Cycle 17) (← links)
- JPN-04-017, Request for Extension to Answer the November 5, 2004, Order Imposing Requirements for the Protection of Certain Safeguards Information (EA-04-190) (← links)
- TAC:MA0711 (← links)
- JAFP-04-0072, 2nd Period Inspection Results and Repair/Replacement Activities for Third 10-Year Inservice Inspection Interval (← links)
- JPN-04-011, Comments on Preliminary Accident Sequence Precursor Analysis of August 14, 2003 Operational Event (← links)
- JPN-04-010, Request to Use 1998 Edition, 2000 Addenda of American Society of Mechanical Engineers (ASME) Section Xl Code Requirements for Examination of Reactor Vessel Closure Studs (← links)
- JPN-04-002, Alternative to Appendix Viii, Supplement 4 Requirements for Reactor Vessel Pressure Retaining Weld Inspection (← links)
- JPN-03-025, Proof of Financial Protection (10CFR140.15) (← links)
- JPN-03-020, Indian Point Nuclear Generating Station, Units 2 & 3, Pilgrim Nuclear Power Station, Vermont Yankee Nuclear Power Station, Relief, Relief Request to Use ASME Code Case N-600 (← links)
- JAFP-03-0096, James a FitzPatrick Nuclear Power Plant, Proposed Relief Request No. VRR-08 to In-Service Testing Program (← links)
- JPN-03-011, Entergy Nuclear Operations, Inc. Service List Updates (← links)
- JPN-03-004, Fitness-for-Duty Program Performance Report for the Period July - December 2002 (← links)
- JPN-03-002, 20-Day Response to NRC January 7, 2003 Order for Compensatory Measures Related to Access Authorization (← links)
- JAFP-02-0251, In-Vessel Visual Inspection Summary Report 2002 Refuel Outage (Reload 15/Cycle 16) (← links)
- JPN-02-026, Relief Request RR-28, Revision 3 for Third 10-Year Inservice Inspection Interval Program Plan (← links)
- JPN-02-025, Final Response to Issuance of Orders for Interim Safeguards and Security Compensatory Measures (← links)
- JPN-02-024, Fitness-for-Duty Program Performance Report for the Period January - June 2002 (← links)
- JPN-03-007, Status of Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc. for Year Ending December 31, 2002 - 10 CFR 50.75(f)(1) (← links)
- JPN-02-023, 10 CFR 50.46 Annual Report - Errors in Emergency Core Cooling System (ECCS) Evaluation Models (← links)
- JPN-02-022, License DPR-59, Relief Request RR-28, Revision 2 for the Third 10-Year Inservice Inspection Interval Program Plan (← links)
- JPN-02-019, & James A. FitzPatrick Nuclear Power Plant Entergy Quality Assurance Program Manual (← links)
- JPN-02-018, Supplemental Response to Issuance of Order for Interim Safeguards and Security Compensatory Measures from James A. FitzPatrick Power Plant (← links)
- JPN-02-016, Proposed License Amendment for a Limited Scope Application of the Alternate Source Term Guidelines in NUREG-1465 Related to the Re-Evaluation of the Fuel Handling Dose Consequences (← links)
- JPN-02-015, Supplemental Response to Issuance of Order for Interim Safeguards and Security Compensatory Measures from James A. FitzPatrick Nuclear Power Plant (← links)
- JPN-02-013, Letter from Michael R. Kansler Re James A. FitzPatrick Nuclear Power Plant License DPR-59 Supplemental Response to Issuance of Order for Interim Safeguards and Security Compensatory Measures (← links)
- JPN-02-011, Request for Relief RR-29, Third 10-Year Inservice Inspection Interval Program Plan (← links)
- JPN-02-010, Relief Request RR-28, Revision 1 for the Third 10-Year Inservice Inspection Interval Program Plan (← links)
- JPN-02-008, Proof of Financial Protection (10 CFR 140.15) and Guarantee Payment of Deferred Premiums (10 CFR.21) (← links)