Pages that link to "Information Notice 1993-21, Summary of NRC Staff Observations Compiled During Engineering Audits or Inspections of Licensee Erosion/Corrosion Programs"
Jump to navigation
Jump to search
The following pages link to Information Notice 1993-21, Summary of NRC Staff Observations Compiled During Engineering Audits or Inspections of Licensee Erosion/Corrosion Programs:
Displayed 50 items.
- Information Notice 1993-61, Excessive Reactor Coolant Leakage Following a Seal Failure in a Reactor Coolant Pump or Reactor Recirculation Pump (← links)
- Information Notice 1993-88, Status of Motor-Operated Valve Performance Prediction Program by the Electric Power Research Institute (← links)
- Information Notice 1993-17, Safety Systems Response to Loss of Coolant and Loss of Offsite Power (← links)
- Information Notice 1993-34, Potential for Loss of Emergency Cooling Function Due to a Combination of Operational and Post-LOCA Debris in Containment (← links)
- Information Notice 1993-54, Motor-Operated Valve Actuator Thrust Variations Measured with a Torque Thrust Cell and a Strain Gage (← links)
- Information Notice 1993-09, Failure of Undervoltage Trip Attachment on Westinghouse Model DB-50 Reactor Trip Breaker (← links)
- Information Notice 1993-10, Dose Calibrator Quality Control (← links)
- Information Notice 1993-11, Single Failure Vulnerability of Engineered Safety Features Actuation Systems (← links)
- Information Notice 1993-12, Off-Gassing in Auxiliary Feedwater System Raw Water Sources (← links)
- Information Notice 1993-13, Undetected Modification of Flow Characteristics in High Pressure Safety Injection System (← links)
- Information Notice 1993-15, Failure to Verify the Continuity of Shunt Trip Attachment Contacts in Manual Safety Injection and Reactor Trip Switches (← links)
- Information Notice 1993-01, Accuracy of Motor-Operated Valve Diagnostic Equipment Manufactured by Liberty Technologies (← links)
- Information Notice 1993-02, Malfunction of a Pressurizer Code Safety Valve (← links)
- Information Notice 1993-14, Clarification of 10 CFR 40.22, Small Quantities of Source Material (← links)
- Information Notice 1993-16, Failures of Not-Locking Devices in Check Valves (← links)
- Information Notice 1993-18, Portable Moisture-Density Gauge User Responsibilities During Field Operations (← links)
- Information Notice 1993-19, Slab Hopper Bulging (← links)
- Information Notice 1993-37, Eyebolts with Indeterminate Properties Installed in Limitorque Valve Operator Housing Covers (← links)
- Information Notice 1993-04, Investigation and Reporting of Misadministrations by the Radiation Safety Officer (← links)
- Information Notice 1993-38, Inadequate Testing of Engineered Safety Features Actuation Systems (← links)
- Information Notice 1993-20, Thermal Fatigue Cracking of Feedwater Piping to Steam Generators (← links)
- Information Notice 1993-39, Radiation Beams From Power Reactor Biological Shields (← links)
- ML031080042 (redirect page) (← links)
- NUREG-2221, Dfc, Supp 1, Technical Bases for Changes in the Subsequent License Renewal Guidance Documents, NUREG2191, Revision 1, Draft Report for Comment and NUREG2192, Revision 1, Draft Report for Comment Draft Report for Comment Tracked C (← links)
- NUREG-2191, Dfc, Vol 2, Rev 1, Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report, Draft Report for Comment, Tracked Changes Version (← links)
- Information Notice 1993-21 (redirect page) (← links)
- Information Notice 1993-05, Locking of Radiography Exposure Devices (← links)
- Information Notice 1993-40, Fire Endurance Test Results for Thermal Ceramics FP-60 Fire Barrier Material (← links)
- Information Notice 1993-41, One Hour Fire Endurance Test Results for Thermal Ceramics Kaowool, 3M Company FS-195 and 3M Company Interam E-50 Fire Barrier Systems (← links)
- Information Notice 1993-06, Potential Bypass Leakage Paths Around Filters Installed in Ventilation Systems (← links)
- Information Notice 1993-26, Grease Soldification Causes Molded-Case Circuit Breaker Failure to Close (← links)
- Information Notice 1993-22, Tripping of Klockner-Moeller Molded-Case Circuit Breakers Due to Support Lever Failure (← links)
- Information Notice 1993-24, Distribution of Revision 7 of NUREG-1021, Operation Licensing Examiner Standards (← links)
- Information Notice 1993-07, Classification of Transportation Emergencies (← links)
- Information Notice 1993-08, Failure of Residual Heat Removal Pump Bearings Due to High Thrust Loading (← links)
- Information Notice 1993-23, Weschler Instruments Model 252 Switchboard Meters (← links)
- Information Notice 1993-25, Electrical Penetration Assembly Degradation (← links)
- Information Notice 1993-27, Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization (← links)
- Information Notice 1993-28, Failure to Consider Loss of DC Bus in the Emergency Core Cooling System Evaluation May Lead to Nonconservative Analysis (← links)
- Information Notice 1993-29, Problems with the Use of Unshielded Test Leads in Reactor Protection System Circuitry (← links)
- Information Notice 1993-30, NRC Requirements for Evaluation of Wipe Test Results; Calibration of Count Rate Survey Instruments (← links)
- Information Notice 1993-31, Training of Nurses Responsible for the Care of Patients with Brachytherapy Implants (← links)
- Information Notice 1993-32, Nonconservative Inputs for Boron Dilution Events Analysis (← links)
- Information Notice 1993-42, Failure of Anti-Rotation Keys in Motor-Operated Valves Manufactured by Yelan (← links)
- Information Notice 1993-43, Use of Inappropriate Lubrication Oils in Satety-Related Applications (← links)
- Information Notice 1993-33, Potential Deficiency of Certain Class Ie Instrumental and Control Cables (← links)
- Information Notice 1993-53, Effect of Hurricane Andrew on Turkey Point Nuclear Generating Station and Lessons Learned (← links)
- Information Notice 1993-35, Insights from Common-Cause Failure Events (← links)
- Information Notice 1993-46, Potential Problem with Westinghouse Rod Control System and Inadvertent Withdrawal of Single Rod Control Cluster Assembly (← links)
- Information Notice 1993-44, Operational Challenges During a Dual-Unit Transient (← links)
- Information Notice 1993-36, Notifications, Reports, and Records of Misadministrations (← links)
- Information Notice 1993-50, Extended Storage of Sealed Sources (← links)