Pages that link to "CNL-22-052, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status"
Jump to navigation
Jump to search
The following pages link to CNL-22-052, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status:
Displayed 50 items.
- ML16354A588 (← links)
- ML13254A297 (← links)
- ML13247A291 (← links)
- ML13247A286 (← links)
- ML13093A370 (← links)
- ML13023A315 (← links)
- ML12354A111 (← links)
- ML12024A376 (← links)
- ML11203A006 (← links)
- ML100950064 (← links)
- ML090930285 (← links)
- ML071340090 (← links)
- ML071210624 (← links)
- ML071170573 (← links)
- ML070930689 (← links)
- ML070750204 (← links)
- ML063210110 (← links)
- ML063110080 (← links)
- ML061500069 (← links)
- ML061420476 (← links)
- ML060520652 (← links)
- CNL-18-119, Application to Revise Watt Bar Nuclear Plant, Units 1 & 2, Technical Specifications 3.8.1, 3.8.7, 3.8.8, and 3.8.9, Regarding Electrical Power Systems (WBN-TS-1808) (← links)
- CNL-18-100, TVA Request for Revision of Modifications 85, 102, and 106 Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants for the Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Table (← links)
- CNL-18-113, Response to Request for Additional Information Regarding Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage (WBN-TS-17-028) . (← links)
- CNL-18-122, Status Regarding the Improved Flood Mitigation System Project (← links)
- CNL-18-090, Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications to Extend Surveillance Requirement 3.3.1.5, 3.3.2.2, and 3.3.6.2 Specified Intervals (390-WBN-TS-2018-14) (← links)
- CNL-18-003, Application to Revise Watts Bar Nuclear Plant Unit 2 Technical Specifications for Use of voltage-based Alternate Repair Criteria in Accordance with Generic Letter 95-05 (391-WBN2-TS-17-30) (← links)
- CNL-18-001, TVA Request for Revision to Item Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants for the Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Attachment a, Table B-1 (← links)
- CNL-18-018, Supplement to Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage (WBN-TS-17-028) (← links)
- CNL-18-011, Tennessee Valley Authority Response to NRC Request for Additional Information Related to BFN Application to Revise Technical Specification 5.5.12 Primary Containment Leakage Rate Testing Program (BFN-TS-497) (← links)
- CNL-17-149, Revised Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025) (← links)
- CNL-17-134, Transmittal of WCAP-18191-NP, Watts Bar Unit 2 Heatup and Cooldown Limit Curves for Normal Operation and Supplemental Reactor Vessel Integrity Evaluations (← links)
- CNL-17-120, Status Regarding the Improved Flood Mitigation System Project (← links)
- CNL-17-109, Response to NRC Request for Additional Information for License Amendment Request to Revise Modifications and an Implementation Item Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Genera (← links)
- CNL-17-014, Application to Revise Technical Specifications to Adopt Technical Specification Task Force (TSTF)-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Pro (← links)
- CNL-17-021, Decommissioning Funding Status Report (← links)
- CNL-16-188, Withdrawal of Browns Ferry Unit 2 Fifth Ten Year Interval Request for Relief 2-ISI-30 and Response to NRC Request for Additional Information Related to Browns Ferry Unit 3 Fourth Ten Year Interval Request for Relief 3-ISI-27 for the Use o (← links)
- CNL-16-142, Application to Modify Operating License Conditions for Watts Bar Nuclear Plant, Units 1 and 2 Regarding the Completion of Permanent Modifications to the Fort Loudoun Dam (WBN-TS-16-12) (← links)
- CNL-16-133, Response to NRC Request for Additional Information Related to License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (BFN-TS-486) (CAC Nos. MF6738, MF6739, and MF6740) - Letter 7 (← links)
- CNL-16-119, Brown Ferry Nuclear Plant, Unit 1, 2 and 3 - Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplemental Information Related to Replacement Steam Dryers (← links)
- CNL-16-091, Brown Ferry, Units 1, 2 & 3, Responses to Requests for Additional Information and Updates Associated with Interconnection System Impact Study Modifications on Proposed Technical Specifications Change TS-505 - Request for License Amendment (← links)
- CNL-16-001, Application to Modify Sequoyah Nuclear Plant, Units 1 and 2 Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02) (← links)
- CNL-15-253, Brown Ferry, Units 1, 2, and 3 - Change in Commitment Related to Interim Compensatory Measures to Reduce Fire Risk (← links)
- CNL-15-247, Brown Ferry Unit 1, Submittal of Response to NRC Request for Additional Information Re Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506). Enclosure 2 ANP-3458NP Enclose (← links)
- CNL-15-232, Attachment 1, CE-15-588-NP-Attachment, Rev. 1 and Attachment 3, CE-15-611-NP-Attachment Regarding Proposed Response to NRC RAIs Nos. 1, 2, 3, and 4 Regarding LAR for Increasing the Maximum Number of Tpbars in Watts Bar, Unit 1. (Non-Propr (← links)
- CNL-15-191, Update to License Amendment Request to Adopt NFPA 805 Performance- Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants for the Browns Ferry Nuclear Plant, Units 1, 2, and 3 (TAC Nos. MF1185, MF1186, and M (← links)
- CNL-15-149, Application to Update Watts Bar Nuclear Plant Unit 1 License Condition 2.F to Allow Two-Unit Operation and Add License Condition 2.I (WBN-TS-15-01) (← links)
- CNL-15-158, Supplement to TVA Letter, Sequoyah Nuclear Plant - Revision to Commitment No. 28 and Review of Impacts to the SQN Reactor Vessel Internals Aging Management Program Due to Dislodged Reactor Vessel Surveillance Capsules in Unit 1 Reactor. (← links)
- CNL-15-096, Tennessee Valley Authority (TVA) Response to NRC Regulatory Issue Summary 2015-07 (← links)
- CNL-15-097, Flood Hazard Reevaluation Report for Watts Bar Plant, Response to NRC Request for Information Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)