Pages that link to "05000461/LER-1997-014, Forwards LER 97-014-00,submitted IAW Requirements of 10CFR50.73.Commitments Made Listed"
Jump to navigation
Jump to search
The following pages link to 05000461/LER-1997-014, Forwards LER 97-014-00,submitted IAW Requirements of 10CFR50.73.Commitments Made Listed:
Displayed 26 items.
- 05000461/LER-1997-006, Forwards LER 97-006-01 Re Lack of Coordination of 120 Volt non-safe Shutdown Circuit Breakers in Distribution Panels W/Safe Shutdown Circuit Breakers,Causes Plant to Be Outside Design Basis (← links)
- 05000461/LER-1997-019, Forwards LER 97-019-00 Which Notes That Switchgear Heat Removal Sys Fan Discharge Damper Control Circuit Routed Through MCR Was Not Per Design Basis Due to Design Error & Could Fail During MCR Fire.Commitment,Discussed (← links)
- 05000461/LER-1997-017, Forwards LER 97-017-00 Re Failure to Properly Calibrate MSL Radiation Monitors.List of Commitments Provided (← links)
- ML20141C475 (redirect page) (← links)
- ML20141C478 (← links)
- 05000461/LER-1997-014 (redirect page) (← links)
- 05000461/LER-1997-016, Forwards LER 97-016-00,re Failure to Provide Emergency Lighting for Safe Shutdown Equipment as Required by Plant Design Basis.Commitments Made in Ltr,Submitted (← links)
- 05000461/LER-1997-030, Forwards LER 97-030-00 Re Failure to Verify Reactor Water Cleanup Sys as Available Alternate Means of Shutdown Cooling Due to Improper Valve Lineup.Commitment Made in LER, Listed (← links)
- 05000461/LER-1997-026, Forwards LER 97-026-00 Re Inadequate Procedure for Insp of Shutdown Svc Water Pumps for Excess Slit Results in Shutdown Svc Water Pump Inoperability.Util Committing to Take Listed Actions as Documented in LER (← links)
- 05000461/LER-1997-033, Forwards LER 97-033-00 Re Misinterpretation of Tech Specs Bases Results in Failure to Meet Required Tech Specs for Two Inoperable ECC Subsystems.Ler Contains Listed Commitments (← links)
- 05000461/LER-1997-036, Forwards LER 97-036-00 & 10CFR21 Rept 21-98-002 Re Failure of Cooling Unit Mfg to Install Motor Shaft Key Leads to Inoperability of Shutdown Svc Water Pump Room Cooling Unit. Rept Submitted in Accordance W/Requirements of 10CFR (← links)
- 05000461/LER-1997-032, Forwards LER 97-032-00,plant Was Outside Design Basis Due to Inadequate Tornado Missile Protection Caused by Design Error,Iaw 10CFR50.73 & 10CFR21.21.Commitments Made in Rept, Listed (← links)
- 05000461/LER-1997-028, Forwards LER 97-028-00 Re Failure of Abb to Supply Properly Qualified Components.Ler Also Contains 10CFR21.21 Rept. Commitments Made by Util,Listed (← links)
- 05000461/LER-1997-031, Forwards LER 97-031-00,re Inadequate Testing of SR Logic Circuits Which Resulted in Failure to Meet TS Sr.Commitments Made within Ltr,Listed (← links)
- 05000461/LER-1997-029, Forwards LER 97-029-00 Re Failure to Follow Plant Procedure When Erecting Scaffold Resulted in safety-related Area Cooler Becoming Inoperable Due to Seismic Qualification Concerns.Commitments Contained in Ler,Listed (← links)
- 05000461/LER-1997-023, Forwards LER 97-023-00,re Inadequate Work Instruction Which Led to Potential Overgreasing of Motor Bearings Causing Potential Failure of Various Motors.Commitments Made within Ltr,Listed (← links)
- 05000461/LER-1997-027, Forwards LER 97-027-00 Re Misinterpretation of 10CFR50.59 Which Resulted in Installation of Mod of RHR That Is Outside Design Basis,Per 10CFR50.73.Commitment Made within Ltr, Listed (← links)
- 05000461/LER-1997-025, Forwards LER 97-025-00 Re Design Deficiency Which Caused Plant to Be Outside Design Basis for Fire in Main CR Potentially Damaging Valves Required for Safe Shutdown of of Plant.Commitments Made in Ler,Listed (← links)
- 05000461/LER-1997-034, Forwards 930414 S&L Electrical Engineering Std ESA-102 W/Copyright Statement Removed.Encl Originally Submitted w/980205 Info Re CPS Combined LER 97-034-00 & Part 21 Rept Contained Copyright Statement (← links)
- 05000461/LER-1997-021, Forwards LER 97-021-00 & 10CFR21 Rept 21-97-040,re Control Circuit for Division 1 EDG Feed Breaker Which Did Not Meet Basis Due to Design Error (← links)
- 05000461/LER-1997-035, Forwards LER 97-035-01,re Divisions 1 & 2 Battery Chargers Incapable of Supplying Full Rated Voltage & Current Flow at Degraded Voltage Trip Setpoint IAW Plant TS & Design Basis.Commitments Made within Ltr,Listed (← links)
- 05000461/LER-1997-002, Forwards LER 97-002-01 Re Failure to Complete TS 3.8.2 LCO Required Action B.4 Due to Personnel Error.Commitment Made within Ltr,Listed (← links)
- 05000461/LER-1997-005, Forwards LER 97-005-01 Re Eighteen Containment Penetrations Susceptible to Thermally Induced over-pressurization Due to Unknown Cause.Util Will Modify Seven Containment Penetrations to Eliminate over-pressure Concern (← links)
- 05000461/LER-1997-009, Forwards LER 97-009-01 Re Identification of Surveillance Procedure Which Does Not Adequately Consider Accuracy of Installed Instrumentation in Meeting TS Requirements for Reactor Core Isolation Cooling Pump.Commitments,Listed (← links)
- 05000461/LER-1997-022, Forwards LER 97-022-00 Re Design of DG Ventilation Subsystems Being Outside of Design Basis.Ler Also Contains 10CFR21 Rept.Commitments Made by Util,Listed (← links)
- 05000461/LER-1997-018, Forwards LER 97-018-00 Re Inadequate Preventive Maint Which Led to Possible Failure of W Dhp Circuit Breakers to Open on Demand.Commitments,Listed (← links)
- 05000461/LER-1997-020, Forwards LER 97-020-00 Re Failure to Document Effect of Degraded Coatings in Containment on Eccs.Commitments Made by Util,Listed (← links)