Pages that link to "05000413/LER-1999-001, Forwards LER 99-001-00,re Inoperable Refueling Water Storage Tank Level Channels Resulting in Operation Outside Design Basis.Commitments Are Provided in Planned Corrective Action Section of LER"
Jump to navigation
Jump to search
The following pages link to 05000413/LER-1999-001, Forwards LER 99-001-00,re Inoperable Refueling Water Storage Tank Level Channels Resulting in Operation Outside Design Basis.Commitments Are Provided in Planned Corrective Action Section of LER:
Displayed 19 items.
- 05000414/LER-1999-002, Forwards Abstract of LER 99-002-00 Re Forced Shutdown of Plant as Result of Flow Restriction Caused by Corrosion of Afs Assured Suction Source Piping Due to Inadequate Testing. Final LER Will Be Submitted No Later than 990708 (← links)
- 05000413/LER-1999-005, Forwards LER 99-005-00 Entitled, Surveillance Requirements for Turbine Trip-Reactor Trip Functions Incorrectly Performed Causing TS Non-Compliance. Expected Submittal Date for Suppl Rept Is 990429 (← links)
- 05000413/LER-1999-003, Forwards LER 99-003-00 Re Inoperability of Eight Ice Condenser Inlet Doors Caused by Ice/Frost Buildup That Could Restrict Door Movement.Rept Contains No New Regulatory Commitments (← links)
- 05000413/LER-1999-002, Forwards LER 99-002-00,re Three RHR Sys Valves Which Did Not Meet Edf Response Time Requirements.Commitments Made by Util Are Listed in Planned Corrective Actions Section (← links)
- ML20204G034 (redirect page) (← links)
- 05000413/LER-1999-001 (redirect page) (← links)
- 05000413/LER-2014-001 (← links)
- 05000413/LER-2016-001 (← links)
- 05000413/LER-1995-001, Forwards LER 95-001 Re TS 3.0.3 Entry Due to Both Trains of CR Ventilation Inoperable (← links)
- 05000413/LER-1995-003, Forwards Rev to LER 95-003 Re Failure to Perform TS Surveillance Due to Unanticipated Interaction of Sys (← links)
- 05000413/LER-1996-001, Submits Modification to Commitment Contained in LER-96-001 (← links)
- 05000413/LER-1987-041, Resubmitted Ltr Forwarding LER 87-041-00 (← links)
- 05000413/LER-1950-412, Forwards Rept Summarizing Review Results of Interunit Electrical Interfaces,Which Was Part of Corrective Action for LER 50-412/85-51.Item Also Identified in Insp Repts 50-413/85-35 & 50-414/85-32 (← links)
- 05000413/LER-1998-016, Forwards LER 98-016-00 Re Plant Being in Condition Outside Design Basis Due to Discovery of Missing Interlock.One Regulatory Commitment Is Contained in Planned Corrective Actions Section of LER (← links)
- 05000413/LER-1997-012, Forwards LER 97-012-00 Re RTD & Incore Thermocouple Cross Calibrations Being Performed Incosistent W/Ts Requirements. Event Considered to Be of No Significance W/Respect to Health & Safety of Public (← links)
- 05000413/LER-1997-011, Forwards LER 97-011-00 Re ESF Actuation Due to RCS Leakage from Loop Drain Valves.Event Considered to Be of No Significance W/Respect to Health & Safety of Public (← links)
- 05000413/LER-1990-025, Notifies of Missed Commitment & Change in Commitment Re LER 90-025 & Insp Repts 50-413/90-09 & 50-414/90-09.Prior Commitment Is Being Changed to Allow Continued Use of Vendor Methodology (← links)
- 05000413/LER-1999-005, Forwards LER 99-005-00 Entitled, Surveillance Requirements for Turbine Trip-Reactor Trip Functions Incorrectly Performed Causing TS Non-Compliance. Expected Submittal Date for Suppl Rept Is 990429 (← links)
- 05000413/LER-1999-003, Forwards LER 99-003-00 Re Inoperability of Eight Ice Condenser Inlet Doors Caused by Ice/Frost Buildup That Could Restrict Door Movement.Rept Contains No New Regulatory Commitments (← links)
- 05000413/LER-1999-002, Forwards LER 99-002-00,re Three RHR Sys Valves Which Did Not Meet Edf Response Time Requirements.Commitments Made by Util Are Listed in Planned Corrective Actions Section (← links)
- 05000413/LER-1999-001, Forwards LER 99-001-00,re Inoperable Refueling Water Storage Tank Level Channels Resulting in Operation Outside Design Basis.Commitments Are Provided in Planned Corrective Action Section of LER (← links)
- 05000413/LER-1997-008, Forwards LER 97-008-00 Re Inadequate Solid State Protection Sys Surveillance Testing.Event Considered to Be No Significance W/Respect to Health & Safety of Public (← links)
- 05000413/LER-1998-019, Forwards LER 98-019-00 Re Inoperable Standby Shutdown Facility in Excess of TS AOT Due to Mispositioned Breakers. One Regulatory Commitment Is Contained in Planned Corrective Actions Section of Rept (← links)
- 05000413/LER-1999-007, Forwards LER 99-007-00,re Operation Prohibited by TS 3.4.7. Commitments Identified in LER Are Listed in Planned Corrective Actions Section (← links)
- 05000413/LER-1997-009, Forwards LER 97-009-02, Unanalyzed Postulated Single Failure Affecting SG Tube Rupture Analysis, Suppl Revises Planned C/A Described in Suppl 1 to Ler.Current Status of C/As & Addl C/As Planned,Provided in Rept (← links)
- 05000413/LER-1999-006, Forwards LER 99-006-00,re CR Ventilation Sys Inoperability. Root Cause & Corrective Actions for Occurence Are Being Finalized & Will Be Reported in Supplement Rept on 990607 (← links)
- 05000413/LER-1999-008, Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach (← links)
- 05000413/LER-1998-014, Forwards LER 98-014-00 Concerning Misinterpretation of TSs Resulting in Failure to Perform DG Surveillance Requirement within Required Surveillance Interval (← links)
- 05000413/LER-1998-015, Forwards LER 98-015-00 Re TS Required Shutdown & Operation Prohibited by TS Associated W/Ice Condenser.Rept Will Be Revised by 981015 (← links)
- 05000413/LER-1998-013, Forwards LER 98-013-01 Re Operation Outside of Tech Specs Due to Analyzing Grab Samples at Incorrect Lower of Detection.Two Regulatory Commitments Contained in Planned Corrective Actions Section of Rept (← links)
- 05000413/LER-1998-009, Forwards LER 98-009-00,concerning Unit Entering TS 3.0.3 Due to Inadequate Testing of Auxiliary Bldg Filtered Exhaust Sys (← links)
- 05000413/LER-1998-011, Forwards LER 98-011-00 Re Two Inoperable Refueling Water Storage Tank Level Channels on Each Unit Due to Lightning Activity.Commitments Made by Util Are Contained in Planned Corrective Action Section of LER (← links)
- 05000413/LER-1998-006, Forwards LER 98-006-00,re Missed TS Surveillance on Pressurizer Heater Emergency Power Supply Testing. Commitments Made within Ltr,Encl (← links)
- 05000413/LER-1998-005, Forwards LER 98-005-00,re Missed TS Surveillance on Abv. Commitments Made within Ltr,Encl (← links)
- 05000413/LER-1998-002, Forwards LER 98-002-00,incorrectly Set Valve Leads to Elevated Condensate Storage Sys Temperature,Causing Condition Outside Design Basis of Plant.Planned Corrective Actions Section of Rept Contain Commitments (← links)
- 05000413/LER-1998-012, Forwards LER 98-012-00 Re Entry Into TS 3.0.3 Due to Inoperability of Both Trains of CR Ventilation Caused by Improper Sys Isolation (← links)
- 05000413/LER-1998-010, Forwards LER 98-010-00,re Pinhole Leak in AFW Nozzle Tempering Line.Commitments Are Contained in Planned Corrective Action Section of Rept (← links)
- 05000413/LER-1987-037, Advises That Submittal of LER 87-037-00,re Itt Grinnell mini-stiff Pipe Clamps Found Broken Due to Improper Heat Treatment,Will Be Delayed Until 871215 to Allow for Analysis & Review of Pertinent Info (← links)
- 05000413/LER-1998-007, Forwards LER 98-007-00,concerning Missed TS Surveillance on Containment Penetration Testing Due to Literal Compliance Issue (← links)
- 05000413/LER-1987-036, Advises That LER 87-36 Re Operation of Nuclear Svc Water Sys Will Be Delayed to Allow for Proper Review & Consideration of Info Recently Gathered by Util.Ler Originally Due on 870930.Rept Will Be Submitted on 871023 (← links)
- 05000413/LER-1999-015, Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept (← links)
- 05000413/LER-1998-001, Forwards LER 98-001-00 Re Both Trains of Control Room Area Ventilation Inadvertently Disabled During Restoration.Ltr Contains Commitments to Perform Corrective Actions (← links)
- 05000413/LER-1999-009, Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept (← links)
- 05000413/LER-1987-011, Forwards LER 87-011-03 Re Shutdown Due to Diesel Generator Inoperability Because of Mfg Deficiency.Ler 87-011-01,dtd 870506 Should Have Been Rev 2 & Did Not Include Changes from 870413 Submittal (← links)
- 05000413/LER-1986-037, Forwards LER 86-037-00 Re Inoperable Ice Condenser Lower Inlet Doors Due to Personnel Error.Event of No Significance to Health & Safety of Public.Previous LER Numbered 86-037 Changed to 86-033 by (← links)
- 05000413/LER-1999-014, Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment (← links)
- 05000413/LER-1999-013, Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER (← links)
- 05000413/LER-1999-011, Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment (← links)
- 05000413/LER-1999-010, Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units (← links)
- 05000413/LER-1999-007, Forwards LER 99-007-00,re Operation Prohibited by TS 3.4.7. Commitments Identified in LER Are Listed in Planned Corrective Actions Section (← links)
- 05000413/LER-1999-006, Forwards LER 99-006-00,re CR Ventilation Sys Inoperability. Root Cause & Corrective Actions for Occurence Are Being Finalized & Will Be Reported in Supplement Rept on 990607 (← links)
- 05000413/LER-1999-008, Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach (← links)
- 05000414/LER-1999-005, Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments (← links)
- 05000414/LER-1999-004, Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments (← links)
- 05000413/LER-1999-015, Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept (← links)
- 05000413/LER-1999-009, Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept (← links)
- 05000414/LER-1999-003, Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev (← links)
- 05000413/LER-1999-014, Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment (← links)
- 05000413/LER-1999-013, Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER (← links)
- 05000413/LER-1999-011, Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment (← links)
- 05000413/LER-1999-010, Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units (← links)
- 05000414/LER-1999-001, Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed (← links)