Press Release-IV-09-017, NRC to Discuss 2008 Performance Assessment for South Texas Project Nuclear Plant

From kanterella
Revision as of 14:10, 26 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Press Release-IV-09-017: NRC to Discuss 2008 Performance Assessment for South Texas Project Nuclear Plant
ML091350066
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/15/2009
From:
Office of Public Affairs Region IV
To:
Category:Press Release
References
Press Release-IV-09-017
Download: ML091350066 (2)


Text

No. IV-09-017

Contact: Victor Dricks

Phone: (817) 860-8128 May 15, 2009 E-Mail: opa4@nrc.gov NRC TO DISCUSS 2008 PERFORMANCE ASSESSMENT FOR SOUTH TEXAS PROJECT NUCLEAR PLANT The Nuclear Regulatory Commission staff will hold a public meeting in Bay City, Texas, on June 3, with representatives of South Texas Project Nuclear Operating Co., to discuss the agency=s 2008 assessment of safety performance for the South Texas Project nuclear plant.

The meeting, which will be open to the public, is scheduled to begin at 6:30 p.m. at the Bay City Civic Center, 201 Seventh St., Bay City.

During the meeting, the NRC staff will be av ailable to answer questions from the public on the safety performance of South Texas Project, as well as the NRC

=s role in ensuring safe plant operation.

AThe NRC continually reviews the performance of South Texas Project and the nation

=s other commercial nuclear power facilities,@ NRC Region IV Administrator Elmo E. Collins said.

AThis meeting will provide an opportunity for a discussion of our annual assessment of safety performance with the company and with local officials and residents who live near the plant.

@ A letter sent from the NRC Region IV office to plant officials addresses the performance of the plant during 2008 and will serve as the basis for the meeting discussion. It is available on the NRC web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/stp_2008q4.pdf . The NRC said South Texas Project operated safely during 2008 and will receive the detailed inspection regime during 2009 used by the NRC for plants that are operating well.

NRC NEWS U.S. NUCLEAR REGULATORY COMMISSION Office of Public Affairs Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Telephone: (817) 860-8128

These inspections are performed by two NRC Resident Inspectors assigned to the plant and by inspection specialists from the Region IV Office in Arlington, Texas.

Current performance information for South Texas Project Unit 1 is available on the NRC web site at: http://www.nrc.gov/NRR/OVERSI GHT/ASSESS/STP1/stp1_chart.html . Current performance information for Unit 2 is available at:

http://www.nrc.gov/NRR/OVERSI GHT/ASSESS/STP2/stp2_chart.html . ###

NRC news releases are available through a free list serve subscription at the following Web address: http://www.nrc.gov/public-involve/listserver.html . The NRC homepage at www.nrc.gov also offers a SUBSCRIBE link. E-mail notifications are sent to subscribers when news releases are posted to NRC's Web site.