ML11200A115
ML11200A115 | |
Person / Time | |
---|---|
Site: | Bellefonte |
Issue date: | 07/14/2011 |
From: | Hinson A Tennessee Valley Authority |
To: | Office of Nuclear Reactor Regulation |
Hinson A | |
Shared Package | |
ML11200A124 | List: |
References | |
Download: ML11200A115 (21) | |
Text
July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 1 TVA Phase 0 Meeting with NRC Bellefonte Units 1 & 2 Main Control Room Modernization Alvin Hinson TVA I&C Engineering Manager July 14, 2011
TVA, AREVA Desmond Raymond AREVA HFE Manager Bob Kershner HFE Engineering Discipline Lead Dominick Logalbo HFE Analysis Lead Jim Hawks TVA Oversight Jerry Mauck TVA Oversight July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 3 Bellefonte MCR/HFE Phase 0 Meeting 4 Bellefonte MCR/HFE Background Control room designed and built in early 1980s Bailey equipment installed in main control room July 14, 2011
Bellefonte MCR/HFE Phase 0 Meeting 6 Bellefonte MCR/HFE Background (continued) Detailed control room design review performed in early 1980s to address TMI action item I.D.1 795 HEDs identified with 425 HED still to be resolved Some legacy issues, documented as HEDs, remain to be resolved July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 7 Bellefonte MCR/HFE Background (continued) July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 8 Bellefonte MCR/HFE Background (continued) MCR/HFE modernization will address: Unresolved HEDs that required significant modifications to correct Obsolescence of existing controls and indication Modernization of balance of plant I&C offered opportunity for use of integrated controls, displays, and alarms Significantly better than the relocation, paint, tape, and label fixes previously envisioned July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 9 Conceptual Plan for Modern Bellefonte Control Room Consolidate number of panels with safety related components Normal control from sitting work stations Safety-related control from standing work stations Safety-related work stations set on each side of unit supervisor desk July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 10 Conceptual Plan for Modern Bellefonte Control Room (continued) Shift turnover/briefing room and shift manager office added Use of mosaic technology for safety-related work stations Use of group-view panel for plant overview monitoring safety and crew situational awareness July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 11 Conceptual Control Room Layout July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 12 Conceptual Control Room Layout July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 13 Conceptual Plan for Operation General Concept of Operations - Normal Operation RO1 controls reactivity and NSSS from non-safety controls RO2 controls turbine and BOP from non-safety Controls July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 14 Conceptual Plan for Operation (continued) General Concept of Operations Emergency Response RO1 performs safety-related actions of EOPs from safety panel (and EDG panel, if required) RO2 performs supporting EOP actions from non-safety panels July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 15 Conceptual Plan for Operation (continued) General Concept of Operations - Loss of Offsite Power RO1 performs safety-related actions of AOPs from safety panel RO2 recovers electrical power at EDG panel and directs field operations July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 16 Conceptual Plan for Operation (continued) General Concept of Operations High Workload Surveillance Testing RO1 controls reactivity and NSSS from non-safety controls RO2 controls turbine and BOP from non-safety controls RO3 performs surveillance at safety panel or EDG panel, as required July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 17 HFE Process Bellefonte Human Factors Engineering Plan Integrated plan based on NUREG 0700 and NUREG 0711 Uses previous CRDR work as operating experience input Builds on industry experience from B&W operating plants July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 18 Conceptual Control Room Mockup July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 19 July 14, 2011 Conceptual Control Room Mockup (continued)
Bellefonte MCR/HFE Phase 0 Meeting 20 July 14, 2011 Conceptual Control Room Mockup (continued)
Bellefonte MCR/HFE Phase 0 Meeting 21 Questions Open Discussion July 14, 2011