ENS 42555
From kanterella
Revision as of 17:38, 24 September 2017 by StriderTol (talk | contribs) (Created page by program invented by Mark Hawes)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ENS Event | |
---|---|
21:50 May 4, 2006 | |
Title | Unexpected Reactor Protection System (Rps) Actuation During Testing |
Event Description | On May 4, 2006, at 1750 hrs, with the plant in Mode 5, an actuation of the reactor protection system occurred with a single control rod fully withdrawn for testing. The actuation occurred when operators opened the main steam isolation valves (MSIVs) for a separate testing activity, which caused an apparent pressure perturbation with the steam generator level transmitters. The pressure perturbation resulted in the indicated level of 2 of 4 'A' Steam Generator level transmitters oscillating to below the steam generator low level reactor trip setpoint, before returning to the pre-event level. As a result of the reactor protection system actuation, the control rod inserted into the core as expected.
The steam generators were aligned in lay-up condition with a nitrogen blanket present at the time the MSIVs were opened. The event is reportable in accordance with 10 CFR 50.72(b)(3)(iv), as a valid actuation of the reactor protection system. The licensee informed the NRC Resident Inspector. |
Where | |
---|---|
Palisades Michigan (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+0.07 h0.00292 days <br />4.166667e-4 weeks <br />9.5886e-5 months <br />) | |
Opened: | Daniel Malone 21:54 May 4, 2006 |
NRC Officer: | Steve Sandin |
Last Updated: | May 4, 2006 |
42555 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 42555\u003C/a\u003E - \u003Ca href=\"/Palisades\" title=\"Palisades\"\u003EPalisades\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EUnexpected Reactor Protection System (Rps) Actuation During Testing\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 42555 - Palisades\n","link":"","lat":42.32339722222222,"lon":-86.31451666666666,"icon":"/w/images/7/79/Entergy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Not Critical |
Scram | A/R |
Before | Cold Shutdown (0 %) |
After | Cold Shutdown (0 %) |
WEEKMONTHYEARENS 538192019-01-09T05:00:0009 January 2019 05:00:00
[Table view]10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Trip from Full Power Due to Rps Testing ENS 538132019-01-03T05:00:0003 January 2019 05:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Trip Due to Cycling of Turbine Governor Valve ENS 527642017-05-19T06:06:00019 May 2017 06:06:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Reactor Protection System Actuation While Shutdown ENS 513972015-09-16T05:17:00016 September 2015 05:17:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Turbine Trip ENS 475232011-12-14T20:10:00014 December 2011 20:10:00 Other Unspec Reqmnt, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Loss of Both Main Feedpumps ENS 472902011-09-25T19:06:00025 September 2011 19:06:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Trip Due to Loss of Two 120 Volt Ac Instrument Busses ENS 465642011-01-22T22:35:00022 January 2011 22:35:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Loss of Generator Load ENS 442372008-05-23T16:49:00023 May 2008 16:49:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip on Possible Generator Lockout ENS 439002008-01-13T10:21:00013 January 2008 10:21:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip After Loss of Main Feedwater Pump ENS 433512007-05-08T17:22:0008 May 2007 17:22:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip on Low Steam Generator Water Level ENS 425552006-05-04T21:50:0004 May 2006 21:50:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unexpected Reactor Protection System (Rps) Actuation During Testing ENS 419672005-09-01T14:25:0001 September 2005 14:25:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Trip Due to Main Generator Hydrogen Leak ENS 413192005-01-09T16:27:0009 January 2005 16:27:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Lowering Main Condenser Vacuum ENS 410022004-08-31T11:18:00031 August 2004 11:18:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Rps Actuation Due to Fire in 2B Condensate Pump 2019-01-09T05:00:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_42555&oldid=91705"