ML13057A613

From kanterella
Revision as of 21:33, 18 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Agenda Oconee Flood Issue, Technical Staff Meeting
ML13057A613
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/12/2008
From:
Office of Information Services
To:
References
FOIA/PA-2012-0325
Download: ML13057A613 (1)


Text

Agenda Oconee Flood Issue Technical Staff Meeting -11112/08 (0900-1000)

Purpose* Plan the upcoming technical meeting between NRC, Duke, and other stakeholders.

  • Discuss parameters for licensee to consider for the upcoming technical meeting.* Discuss areas to cover for a site visit.Discussion Topics 1. Summary of Duke Management meeting of 11/5/08 a. Impressions
b. Path forward 2. Inundation study concerns a. Breach size b. Timing c. Modeling technique (1-D vs. 2-D).3. Seismic-analysis concerns a. Soil liquefaction
b. Embankment seepage c. Seismic curves 4. Weather a. PMP 5. Dam failure frequency concerns a. Fault tree modeling.b. Spillway design.-c. Inspections'" 6. Site visit a. Walkdown of Jocassee Dam.b. Review the purchasing spec. for the watertight doors?c. Discuss the scope of the engineering support mods. for watertight doors.7. Inter-agency and contractors
a. FERC involvement
b. Review from DOI -Bureau of Reclamation
c. Possible contractors to RES.8. Preparation of meeting -with Duke (Oconee and Duke Hydro) technical staff 9. Briefing NRC (NRR) management
a. Planned call between Duke and NRC management
10. Next Meeting