Letter Sequence Withdrawal |
---|
|
|
MONTHYEARML12347A3162012-12-12012 December 2012 Acceptance Review E-mail, License Amendment Request 12-005 for Revision to Technical Specifications 3.3.1 and 3.3.2 Project stage: Acceptance Review CP-201300927, Withdrawal of License Amendment Request 12-005, Revision to Technical Specifications 3.3.1, Reactor Trip System Instrumentation and 3.3.2, Engineered Safety Feature Actuation System Instrumentation.2013-07-25025 July 2013 Withdrawal of License Amendment Request 12-005, Revision to Technical Specifications 3.3.1, Reactor Trip System Instrumentation and 3.3.2, Engineered Safety Feature Actuation System Instrumentation. Project stage: Withdrawal ML13218A1002013-07-25025 July 2013 Withdrawal of License Amendment Request (LAR) 12-005 Revision to Technical Specifications 3.3.1, Reactor Trip System Instrumentation and 3.3.2, Engineered Safety Feature Actuation System Instrumentation. Project stage: Withdrawal ML13210A2782013-08-0606 August 2013 FRN, Withdrawal of Amendment Request, Revise Technical Specification (TS) 3.3.1, Reactor Trip System (RTS) Instrumentation, and TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation Project stage: Withdrawal ML13210A2772013-08-0606 August 2013 Letter, Withdrawal of Amendment Request, Revise Technical Specification (TS) 3.3.1, Reactor Trip System (RTS) Instrumentation, and TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation Project stage: Withdrawal 2013-07-25
[Table View] |
|
---|
Category:Federal Register Notice
MONTHYEARML24031A6342024-09-13013 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4), Final Safety Analysis Report Update Schedule (EPID L-2023-LLE-0023) - Federal Register Notice ML24136A1362024-07-30030 July 2024 Renewed License - Federal Register Notice ML24130A0012024-05-16016 May 2024 April 2024, Issuance of Multiple Exemptions Regarding Security Notifications, Reports, and Recording Keeping ML24114A3102024-05-0303 May 2024 Monthly (28-Day) Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 14, 2024 ML24074A4332024-04-26026 April 2024 License Renewal Final SEIS-Notice of Availability FRN ML23312A0292023-11-0808 November 2023 Federal Register Notice: Comanche Peak Draft Supplemental Environmental Impact Statement Comment Period Correction ML23237B4412023-09-29029 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Federal Register Notice, Direct and Indirect License Transfer Issuance Order ML23124A0772023-05-17017 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (FRN) ML23039A0532023-02-16016 February 2023 FRN - Comanche Peak Second Notice of Intent to Prepare EIS and to Conduct EIS Scoping ML22299A1792022-12-0808 December 2022 FRN - Comanche Peak Notice of Intent to Prepare EIS and to Conduct EIS Scoping ML22297A0062022-11-28028 November 2022 Notice of Acceptance and Opportunity for Federal Register Notice ML22285A0742022-10-26026 October 2022 LRA - Receipt and Availability FRN ML21147A5192021-06-24024 June 2021 FRN - Notice of Issuance of Multiple COVID-19 Exemptions Regarding Various Parts of 10 CFR Issued in May 2021 ML21060A5962021-03-0909 March 2021 FRN - Notice of Issuance of Multiple COVID-19 Exemptions Regarding 10 CFR Part 26 for February 2021 ML20255A1002020-10-0707 October 2020 Proposed Alternative to the Requirements of the ASME OM Code to Extend the Inservice Test Program Interval for Certain Check and Relief Valves (EPID L-2020-LLR-0061 and EPID L-2020-LLR-0062 (COVID-19)) ML20101P5592020-04-13013 April 2020 Public Notice of Application for Amendment to Facility Operating License ML20035C4082020-02-18018 February 2020 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 02/25/2020 ML20015A0542020-02-14014 February 2020 Federal Register Notice - Individual Notice of Consideration of Issuance of Amendments to Adopt TSTF-513, Revision 3 ML20015A3962020-02-14014 February 2020 Letter - Individual Notice of Consideration of Issuance of Amendments to Adopt TSTF-513, Revision 3 ML19122A1572019-05-15015 May 2019 Federal Register Notice: Comanche Peak Independent Spent Fuel Storage Installation - Environmental Assessment and Finding of No Significant Impact; Issues NRC-2018-0287, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 01/02/20192019-01-0202 January 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 01/02/2019 ML18351A0022019-01-0202 January 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 01/02/2019 ML18295A7442018-10-25025 October 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 11/06/18 ML18276A0262018-10-0404 October 2018 Letter - Renotice Individual 14-day Exigent Notice of Consideration of Issuance of Amendment, Revise TS 3.8.4, DC Sources - Operating, to Modify TS Actions for One Inoperable Battery ML18276A0292018-10-0404 October 2018 FRN - Renotice Individual 14-day Exigent Notice of Consideration of Issuance of Amendment, Revise TS 3.8.4, DC Sources - Operating, to Modify TS Actions for One Inoperable Battery NRC-2018-0205, FRN - Renotice Individual 14-day Exigent Notice of Consideration of Issuance of Amendment, Revise TS 3.8.4, DC Sources - Operating, to Modify TS Actions for One Inoperable Battery2018-10-0404 October 2018 FRN - Renotice Individual 14-day Exigent Notice of Consideration of Issuance of Amendment, Revise TS 3.8.4, DC Sources - Operating, to Modify TS Actions for One Inoperable Battery ML18254A0162018-09-13013 September 2018 FRN, Individual 14-day Exigent Notice of Consideration of Issuance of Amendment, Revise Technical Specification (TS) 3.8.4, DC Sources - Operating, to Modify TS Actions for One Inoperable Battery ML18173A1792018-08-0707 August 2018 OEDO-17-00070 - Notice of Issuance of Director'S Decision, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and Japan C ML17198A3292017-08-30030 August 2017 OEDO-17-00070 - Acknowledgement Letter, Paul Gunter, Beyond Nuclear, Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and Jap ML17200A0652017-08-30030 August 2017 OEDO-17-00070 - Acknowledgement FRN, Paul Gunter, Beyond Nuclear, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and NRC-2016-0214, Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Consideration; Correction to Notice Published October 25, 20162016-10-27027 October 2016 Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Consideration; Correction to Notice Published October 25, 2016 ML16300A1772016-10-27027 October 2016 Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Consideration; Correction to Notice Published October 25, 2016 NRC-2016-0020, ISFSI - FRN, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming License Amendments (CAC Nos. MF7075 and MF7076)2016-05-0606 May 2016 ISFSI - FRN, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming License Amendments (CAC Nos. MF7075 and MF7076) ML16130A6492016-05-0606 May 2016 ISFSI - FRN, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming License Amendments ML16032A3492016-02-0202 February 2016 Independent Spent Fuel Storage Installation - Correction Letter, Notice of Consideration of Approval of Transfer of Facility Operating Licenses and Conforming Amendments, and Opportunity for a Hearing (CAC MF7075-MF7076) ML15351A0502016-01-27027 January 2016 Independent Spent Fuel Storage Installation - Letter, Notice of Consideration of Approval of Transfer of Facility Operating Licenses and Conforming Amendment, and Opportunity for a Hearing ML15351A0532016-01-27027 January 2016 Independent Spent Fuel Storage Installation - FRN, Notice of Consideration of Approval of Transfer of Facility Operating Licenses and Conforming Amendment, and Opportunity for a Hearing ML15218A6252015-08-14014 August 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 14, 2015 ML14043A2032014-02-19019 February 2014 Federal Register Notice Regarding the 612th ACRS Meeting, March 6-8, 2014 ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML13210A2782013-08-0606 August 2013 FRN, Withdrawal of Amendment Request, Revise Technical Specification (TS) 3.3.1, Reactor Trip System (RTS) Instrumentation, and TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML13210A2772013-08-0606 August 2013 Letter, Withdrawal of Amendment Request, Revise Technical Specification (TS) 3.3.1, Reactor Trip System (RTS) Instrumentation, and TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML13064A4302013-03-12012 March 2013 Correction FRN, Correct Date of Safety Evaluation in One Column; Order Approving the Proposed Internal Restructuring and Indirect Transfer of License NRC-2012-0310, FRN, Order Approving Indirect License Transfer Regarding the Proposed Energy Future Holdings Corporate Internal Restructuring (TAC Nos. ME9767 and ME9768)2013-02-22022 February 2013 FRN, Order Approving Indirect License Transfer Regarding the Proposed Energy Future Holdings Corporate Internal Restructuring (TAC Nos. ME9767 and ME9768) ML13022A3342013-02-22022 February 2013 FRN, Order Approving Indirect License Transfer Regarding the Proposed Energy Future Holdings Corporate Internal Restructuring ML12292A2022013-01-0202 January 2013 ISFSI - Notice of Consideration of Approval of Application Containing SUNSI, Opportunity for a Hearing; Indirect License Transfer, Proposed Energy Future Holdings Corporation Internal Transaction NRC-2012-0301, ISFSI - FRN, Notice of Consideration of Approval of Application Containing SUNSI, Opportunity for a Hearing - Indirect License Transfer, Proposed Energy Future Holdings Corporation Internal Transaction2012-12-26026 December 2012 ISFSI - FRN, Notice of Consideration of Approval of Application Containing SUNSI, Opportunity for a Hearing - Indirect License Transfer, Proposed Energy Future Holdings Corporation Internal Transaction ML12292A2092012-12-26026 December 2012 ISFSI - FRN, Notice of Consideration of Approval of Application Containing SUNSI, Opportunity for a Hearing - Indirect License Transfer, Proposed Energy Future Holdings Corporation Internal Transaction ML12056A0442012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status 2024-09-13
[Table view] |
Text
[7590-01-P]
NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-445 and 50-446; NRC-2013-0182] Luminant Generation Company LLC Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 Application for Amendment to Facility Operating License AGENCY: Nuclear Regulatory Commission.
ACTION: License amendment application; withdrawal.
ADDRESSES: Please refer to Docket ID NRC-2013-0182 when contacting the NRC about the availability of information regarding this document. You may access information related to this document, which the NRC possesses and are publicly available, using any of the following methods:
- Federal rulemaking Web site:
Go to http://www.regulations.gov and search for Docket ID NRC-2013-0182. Address questions about NRC dockets to Carol Gallagher; telephone: 301-287-3422; e-mail:
Carol.Gallagher@nrc.gov.
- NRC's Agencywide Documents Access and Management System (ADAMS):
You may access publicly available documents online in the NRC Library at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select "ADAMS Public Documents" and then select "Begin Web-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this notice (if that document is available in ADAMS) is provided the first time that a document is referenced.
- NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. FOR FURTHER INFORMATION CONTACT: Balwant K. Singal, Senior Project Manager, Plant Licensing Branch IV, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555; telephone: 301-415-3016; e-mail: Balwant.singal@nrc.gov. SUPPLEMENTARY INFORMATION:
The U.S. Nuclear Regulatory Commission (NRC) has granted the request of Luminant Generation Company LLC (the licensee) to withdraw its application dated October 2, 2012 (ADAMS Accession No. ML12285A091), for a proposed amendment to Facility Operating License Nos. NPF-87 and NPF-89 for the Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, respectively, located in Somervell County, Texas. The proposed amendment would have revised Technical Specification (TS) 3.3.1, "Reactor Trip System (RTS) Instrumentation," and TS 3.3.2, "Engineered Safety Feature Actuation System (ESFAS) Instrumentation," to relocate the TS requirements for the following instruments to the Technical Requirements Manual, a licensee-controlled document:
- Pressurizer Water Level - High (RTS Function No. 9),
The proposed changes would have relocated the TS requirements in their entirety and would not have resulted in deletion or alteration of any RTS or ESFAS requirements. The proposed relocation of the TS requirements for these RTS and ESFAS instrument Functions was based on the application of TS criteria of Title 10 of the Code of Federal Regulations , (10 CFR) paragraph 50.36(c)(2)(ii). The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the Federal Register on January 22, 2013 (78 FR 4472). However, by letter dated July 25, 2013 (ADAMS Accession No. ML13218A100), the licensee withdrew the proposed change. For further details with respect to this action, see the application for amendment dated October 2, 2012, and the licensee's letter dated July 25, 2013, which withdrew the application for license amendment. Dated at Rockville, Maryland, this 6th day of August 2013.
For the Nuclear Regulatory Commission.
/RA/
Balwant K. Singal, Senior Project Manager, Plant Licensing Branch IV, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.