ENS 52889
From kanterella
Revision as of 17:15, 24 September 2017 by StriderTol (talk | contribs) (Created page by program invented by Mark Hawes)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ENS Event | |
---|---|
02:35 Aug 6, 2017 | |
Title | Automatic Reactor Scram During Testing |
Event Description | At 2235 [EDT] Nine Mile Point Unit 2 experienced an automatic scram on high reactor pressure. Turbine stop valve testing was in progress at the time of the scram. All control rods inserted. Pressure control is via the turbine bypass valves. The cause of the scram is being investigated.
This is a 4-Hour report for 10CFR50.72(b)(2)(iv)(B) RPS [Reactor Protection System] Actuation. The NRC Resident Inspector has been notified. Reactor water level is being maintained with normal feedwater flow. No safety or relief valves lifted. The plant is in its normal shutdown electrical lineup. |
Where | |
---|---|
Nine Mile Point New York (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
Time - Person (Reporting Time:+-2.15 h-0.0896 days <br />-0.0128 weeks <br />-0.00295 months <br />) | |
Opened: | Carl Crawford 00:26 Aug 6, 2017 |
NRC Officer: | Mark Abramovitz |
Last Updated: | Aug 6, 2017 |
52889 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 52889\u003C/a\u003E - \u003Ca href=\"/Nine_Mile_Point\" title=\"Nine Mile Point\"\u003ENine Mile Point\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EAutomatic Reactor Scram During Testing\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 52889 - Nine Mile Point\n","link":"","lat":43.52021388888889,"lon":-76.40656388888888,"icon":"/w/images/b/be/Constellation_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | A/R |
Before | Power Operation (84 %) |
After | Hot Shutdown (0 %) |
WEEKMONTHYEARENS 573342024-09-23T11:20:00023 September 2024 11:20:00
[Table view]10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Automatic Reactor Scram Due Turbine Trip ENS 570042024-03-04T00:42:0004 March 2024 00:42:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram Due to Main Turbine Trip on LOW Condenser Vacuum ENS 567102023-09-02T10:32:0002 September 2023 10:32:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Automatic Reactor Scram Due to Feedwater Transient ENS 558212022-04-05T06:23:0005 April 2022 06:23:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Scram on LOW Level ENS 545622020-03-04T17:05:0004 March 2020 17:05:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Scram in the Turbine Control System ENS 540352019-04-29T20:33:00029 April 2019 20:33:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram Due to Power Oscillations and High Pressure Coolant Injection System Initiation ENS 539982019-04-14T04:03:00014 April 2019 04:03:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram and Specified System Actuation ENS 535652018-08-27T04:00:00027 August 2018 04:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation En Revision Imported Date 8/29/2018 ENS 529502017-09-06T15:57:0006 September 2017 15:57:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram on Low Reactor Vessel Water Level ENS 528892017-08-06T02:35:0006 August 2017 02:35:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram During Testing ENS 526242017-03-20T06:27:00020 March 2017 06:27:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Scram Due to Pressure Oscillations ENS 524252016-12-10T13:48:00010 December 2016 13:48:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram Due to High Main Turbine Vibrations ENS 513692015-09-04T13:16:0004 September 2015 13:16:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unplanned Automatic Scram and Specified System Actuations Due to Msiv Closure ENS 508302015-02-18T19:06:00018 February 2015 19:06:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Scram Due to Rapidly Rising Reactor Water Level ENS 498882014-03-10T20:28:00010 March 2014 20:28:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Reactor Scram Due to Actuation of the Alternate Rod Insertion System ENS 498682014-03-04T06:43:0004 March 2014 06:43:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Unit 2 Manual Reactor Scram Following Loss of a Uninterruptible Power Supply (Ups) ENS 495932013-12-02T14:04:0002 December 2013 14:04:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Scram Following Trip of Both Reactor Recirculation Pumps ENS 484772012-11-03T12:23:0003 November 2012 12:23:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Scram on Low Reactor Water Level ENS 484532012-10-29T04:00:00029 October 2012 04:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Rps Actuation While Critical Due to Generator Load Reject ENS 483232012-09-20T13:23:00020 September 2012 13:23:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Scram and High Pressure Coolant Injection System Initiation ENS 481102012-07-17T15:18:00017 July 2012 15:18:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram Due to High Neutron Flux ENS 480972012-07-12T06:20:00012 July 2012 06:20:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Due to Lowering Condenser Vacuum ENS 471412011-08-11T04:16:00011 August 2011 04:16:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Inserted Due to a Feedwater Leak on a Min Flow Line ENS 468082011-05-03T00:51:0003 May 2011 00:51:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram ENS 464092010-11-10T15:56:00010 November 2010 15:56:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unplanned Automatic Scram and High Pressure Coolant Injection System Initiation During Testing ENS 456122010-01-07T06:00:0007 January 2010 06:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram During Transmitter Venting ENS 454122009-10-05T15:58:0005 October 2009 15:58:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Scram and High Pressure Coolant Injection Following a Loss of Feedwater Level Control ENS 445982008-10-24T01:26:00024 October 2008 01:26:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram Due to Loss of the Electronic Pressure Regulator ENS 424032006-03-10T03:14:00010 March 2006 03:14:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Due to Loss of Condenser Vacuum Turbine Trip ENS 419272005-08-18T13:49:00018 August 2005 13:49:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Scram Due to Loss of a Power Board ENS 414642005-03-07T09:37:0007 March 2005 09:37:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Automatic Turbine Trip/ Reactor Scram ENS 409982004-08-30T12:35:00030 August 2004 12:35:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unit 1 Manually Scrammed Due to Oscillating Reactor Vessel Water Level ENS 407192004-05-02T06:17:0002 May 2004 06:17:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Manual Scram Due to Rising Torus Temperature Due to Stuck Open Erv 2024-09-23T11:20:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_52889&oldid=81816"