Vermont Yankee 2013 Summary Report - Inservice Inspection and Repair and Replacement
ML13190A019
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 07/01/2013
From: Wanczyk R J
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BVY 13-063
Download: ML13190A019 (7)


Text

ilift1-6.-'60ýEntergy Entergy Nuclear Operations, Inc.Vermont Yankee320 Governor Hunt RoadVernon, VT 05354Tel 802 257 7711Robert J. WanczykLicensing ManagerBVY 13-063July 1,2013U.S. Nuclear Regulatory Commission ATTN: Document Control Desk11555 Rockville PikeRockville, MD 20852

SUBJECT:

Vermont Yankee 2013 Summary Report -Inservice Inspection and Repair and Replacement Vermont Yankee Nuclear Power StationDocket No. 50-271License No. DPR-28

Dear Sir or Madam:

This letter, in accordance with IWA-4000 and ASME Code Case N-532-4, provides acopy of the Inservice Inspection Summary Report for activities performed at the VermontYankee Nuclear Power Station for the period November 2, 2011 to March 4, 2013.Vermont Yankee hereby submits 2013 Form OAR-i, Owner Activity Report for Inservice Inspections.

Vermont Yankee's fourth ten year Inservice Inspection interval beganSeptember 1, 2003.There are no new regulatory commitments being made in this submittal.

If you have any questions concerning this submittal, please contact me at(802) 451-3166.

Sincere[RJW/JTM]

Attachment:

OAR-1 Owner Activity Report Through RFO 30 (4 pages)cc listing (next page)4CA17 BVY 13-063 / page 2 of 2cc: Mr. William M. Dean, Region 1 Administrator U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100King of Prussia, PA 19406-2713 Mr. Richard Guzman, Project ManagerOffice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop -08C2A11555 Rockville PikeRockville, MD 20852USNRC Resident Inspector Vermont Yankee Nuclear Power Station320 Governor Hunt RoadVernon, VT 05354Mr. Christopher

Recchia, Commissioner VT Department of Public Service112 State Street, Drawer 20Montpelier, VT 05620-2601 BVY 13-063Attachment 1Vermont Yankee Nuclear Power StationOAR-1Owner Activity Report Through RFO 30

--EntergyEntergy Nuclear Vermont YankeeOAR-1Owner Activity Report Through RFO 30November 2, 2011 through March 4, 2013Reviewed By:Reviewed By:Reviewed By:Approved By:Inservice Inspection Program Owner-,lRe-pait-r'depliacement Program OwnerSupervisor.

Cod ProgramsEngineering Programs

& Cmrponentso nagerDate: (6!__!_Date: 6/116 / 13Date: _/_ /--Date: "1/

Form OAR-1 Owner's Activity ReportReport Number:13-01-01Plant: Entergy Nuclear Vermont YankeeUnit No.: ICurrent inspection interval:

Current inspection period:Commercial service date: 11/30/1972 Refueling Outage no.: RFO 30Third (Trd)(Is1, 2 li, 3rd)Edition and Addenda of Section XI applicable to the inspection plans: 1998 Edition, through 2000 AddendaDate and revision of inspection plans: SEP-ISI-VTY-001 VTY Fourth Ten-Year Interval Inservice Inspection (ISI)Program Plan, Revision 7, 02/15/2012 Edition and Addenda of Section XI applicable to repair/replacement activities if different than the inspection 1J~ IA Af tt5-iII ~i~~~1, ~ VU~I IMIAA F ;x1Ja C2. D 1ii f A 'Ui D 'r t DUICode Cases used: ASME Code Case N-532-4(if applicable)

Certificate of Conformance I certify that (a) the statements made in this report are correct-(b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XIL and (c) the repair/replacement activities and evaluations supporting the completion of RFO 30 4 confonn to the requirements of Section XI.( Irefueli ou ge u iber)Date: (0 /",P- 1113Sioned: lack Bovle/Director of EnzineerinDa

....... j ~Owner or Owner's Designee, Title (/,wrier or Owner's Desivee, Titlet" /!Certificate of Inservice Inspection I, the undersigned, holding a valid conunission issued by the National Board of Boiler and Pressure VesselInspectors and the State or Province of 4 -V-c t x-,"r employed by Hartford Steam Boiler of CTof Connecticut have inspected the items described in this Owner's Activity Report, and state that,to the best of my knowledge and belief, the owner has performed all activities represented by this report inaccordance with the requirements of Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied,concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither theInspector nor his employer shall be liable in any manner for any personal inju-y or property damage or a loss of anykind arising from or connected with this inspection.

Elizabeth York / ,aInspector's Sig ureDate:Le , 4v?Colmmissions

.41Z 14T 96/%/,!9A-///,,'

.. '4e1Natioial Board, State, Province.

and Endorsements OAR-1 Table 1Items with Flaws or Relevant Conditions that Required Evaluation forContinued ServiceExamination Item Description Evaluation Description Category andItem NumberNone None NonePage 1 of I Table 2-ABSTRACT OF REPAIRS, REPLACEMENTS OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICECode Item Description Description of Work Date Completed Repair/Replacement Class Plan Number3 Service Water 'T' near V70-817A Repair by replacement of component with leaking 3/14/2013 322369-01 1_ 1__ 3/4" socket weld. CR-VTY-2012-03565 I