ML13358A068
ML13358A068 | |
Person / Time | |
---|---|
Site: | Browns Ferry |
Issue date: | 12/18/2013 |
From: | GE-Hitachi Nuclear Energy Americas |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML13358A064 | List: |
References | |
CNL-13-148 NEDO-33445, Rev 0 | |
Download: ML13358A068 (62) | |
Text
{{#Wiki_filter:ENCLOSURE 3NEDO-33445 -Pressure and Temperature Limits Report (PTLR) Up to 25 and 38Effective Full- Power Years (Non-Proprietary) 0 HITACHIGE Hitachi Nuclear Energy3901Castle Hayne RdWilmington, NC 28401NEDO-33445 Revision 0December 2013Non-Proprietary Information-Class I (Public)TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT UNI 1Pressure and Temperature Limits Report (PTLR)Up to 25 and 38 Effective Full-Power YearsCopyright 2013 GE-Hitachi Nuclear Energy Americas LLCAll Rights Reserved NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)INFORMATION NOTICEThis is a non-proprietary version of the document NEDC-33445P, Revision 0, which has theproprietary information removed. Portions of the document that have been removed are indicated by an open and closed bracket as shown here [[IMPORTANT NOTICE REGARDING CONTENTS OF THIS REPORTPLEASE READ CAREFULLY The design, engineering, and other information contained in this document are furnished for thepurposes of supporting a License Amendment Request by Tennessee Valley Authority (TVA) fora pressure temperature limits in proceedings before the U.S. Nuclear Regulatory Commission. The only undertakings of the GEH respecting information in this document are contained in thecontract between TVA and GEH, and nothing contained in this document shall be construed aschanging the contract. The use of this information by anyone other than TVA, or for anypurpose other than that for which it is intended, is not authorized; and, with respect to anyunauthorized use, GEH makes no representation or warranty, express or implied, and assumes noliability as to the completeness,
- accuracy, or usefulness of the information contained in thisdocument, or that its use may not infringe privately owned rights.ii NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)ABBREVIATIONS
& ACRONYMS .............................................................................................. iv1.0 P u rp o se ................................................................................................................................... 12 .0 A pp licab ility ........................................................................................................................... 13 .0 M ethodology .......................................................................................................................... 13.1 Chemistry 2................................................ .......23.2 Initial Reference Temperature of Nil Ductility Transition (RTNDT) .......................... 23.3 Adjusted Reference Temperature ............................................................................................ 23.4 Surveillance Program ........................................................................................................... 33.5 Reactor Coolant Pressure Boundary ......................................................................................... 43.6 F utu re C hanges .............................................................................................................................. 54.0 O perating L im its ............................................................................................................ 55 .0 D iscu ssio n .............................................................................................................................. 66 .0 R eferen ces ............................................................................................................................ 10APPENDICES Appendix A Reactor Vessel Material Surveillance Program .......................................................... 25Appendix B BFNP Unit 1 Reactor Pressure Vessel P-T Curve Supporting Plant-Specific In form ation ........................................................................................................................................... 26Appendix C BFNP Unit 1 Reactor Pressure Vessel P-T Curve Checklist .................................... 37Appendix D Sample P-T Curve Calculations .................................................................................. 42TABLESTable 1: BFNP Unit I Tabulation of Curves -25 EFPY ................................................................. 15Table 2: BFNP Unit 1 Tabulation of Curves -38 EFPY ............................................................... 20Table B-i: BFNP Unit 1 Initial RTNDT Values for RPV Plate and Flange Materials ...................... 28Table B-2: BFNP Unit 1 Initial RTNDT Values for RPV Nozzle and Weld Materials ..................... 29Table B-3: BFNP Unit 1 Initial RTNDT Values for RPV Appurtenance and Bolting Materials ......... 30Table B-4: BFNP Unit 1 Adjusted Reference Temperatures for Up to 25 EFPY .......................... 31Table B-5: BFNP Unit 1 Adjusted Reference Temperatures for Up to 38 EFPY .......................... 33Table B-6: BFNP Unit 1 RPV Beltline P-T Curve Input Values for 38 EFPY .............................. 35Table B-7: BFNP Unit 1 Definition of RPV Beltline Region[] ...................................................... 36Table C-I: BFNP Unit 1 Checklist ................................................................................................ 38FIGURESFigure 1: BFNP Unit I Composite Curve A Pressure Test P-T Curves Effective for Up to2 5 E F P Y ................................................................................................................................................ 11Figure 2: BFNP Unit 1 Composite Curve B Core Not Critical Including Bottom Head and CurveC Core Critical P-T Curves Effective for Up to 25 EFPY ............................................................... 12Figure 3: BFNP Unit 1 Composite Curve A Pressure Test P-T Curves Effective for Up to3 8 E F P Y ................................................................................................................................................ 13Figure 4: BFNP Unit I Composite Curve B Core Not Critical Including Bottom Head and CurveC Core Critical P-T Curves Effective for Up to 38 EFPY ............................................................... 14Figure B-i: BFNP Unit 1 Reactor Pressure Vessel ........................................................................ 27C o m p o n en t ............................................................................................................................................ 3 6iii NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)ABBREVIATIONS & ACRONYMSShort Form Description %Cu Weight percent Copper%Ni Weight percent Nickel1/4T /4 depth into the vessel wall from the inside diameter3/4T 33/4 depth into the vessel wall from the inside diameterASME American Society of Mechanical Engineers ART Adjusted Reference Temperature BAF Bottom of Active FuelBFNP Browns Ferry Nuclear PlantBWR Boiling Water ReactorBWR/6 BWR Product Line 6BWRVIP BWR Vessel and Internals ProjectCF Chemistry FactorCMTR Certified Material Test ReportCRD Control Rod DriveEFPY Effective Full Power YearsEPRI Electric Power Research Institute ESW Electroslag WeldFW Feedwater GEH GE-Hitachi Nuclear Energy Americas LLCGL Generic LetterID Inside DiameterISP Integrated Surveillance ProgramLTR Licensing Topical Reportn/cmP neutrons per square centimeter (measure of fluence)N 16 BFNP Unit I Water Level Instrumentation NozzleNDT Nil Ductility Transition NRC Nuclear Regulatory Commission P/T Pressure and Temperature P-T Pressure-Temperature PTLR Pressure and Temperature Limits ReportRCPB Reactor Coolant Pressure BoundaryRCS Reactor Coolant SystemRG Regulatory GuideRPV Reactor Pressure VesselRTNDT Reference Temperature of Nil Ductility Transition RVID Reactor Vessel Integrity Database (by NRC)SAW Submerged Arc WeldSSP Supplemental Surveillance ProgramTAF Top of Active FuelTS Technical Specification TVA Tennessee Valley Authority UFSAR Updated Final Safety Analysis Reportiv NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)Short FormUSWLIWRCDescription United StatesWater Level Instrumentation Welding Research CouncilV NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)1.0 PurposeThe purpose of the Browns Ferry Nuclear Plant (BFNP) Unit 1 Pressure and Temperature LimitsReport (PTLR) is to present operating limits relating to:1. Reactor Coolant System (RCS) Pressure versus Temperature limits during Heatup,Cooldown and Hydrostatic/Class I Leak Testing;2. RCS Heatup and Cooldown rates;3. Reactor Pressure Vessel (RPV) to RCS coolant AT requirements duringRecirculation Pump startups;
- 4. RPV bottom head coolant temperature to RPV coolant temperature AT requirements during Recirculation Pump startups;
- 5. RPV head flange bolt-up temperature limits.This report has been prepared in accordance with the requirements defined in Reference 6.2.2.0 Applicability This report is applicable to the BFNP Unit 1 RPV for up to 25 and 38 Effective Full Power Years(EFPY), representing a 60-year license.The following Technical Specification (TS) is affected by the information contained in thisreport:TS 3.4.9 RCS Pressure and Temperature (P/T) Limits3.0 Methodology The limits in this report were derived from the Nuclear Regulatory Commission (NRC)-approved methods listed in the specific revisions listed below:1. The neutron fluence was calculated per Licensing Topical Report (LTR), GeneralElectric Methodology for Reactor Pressure Vessel Fast Neutron Flux Evaluation, NEDC-32983P-A, Revision 2, January 2006, approved in Reference 6.1.2. The pressure and temperature limits were calculated per GE Hitachi Nuclear EnergyMethodology for Development of Reactor Pressure Vessel Pressure-Temperature Curves, NEDC-33178P-A, Revision 1, June 2009, approved in Reference 6.2.3. This revision of the pressure and temperature limits is to incorporate the following changes:* Application of GEH Topical Report for Pressure-Temperature (P-T)Curves* The Water Level Instrumentation (WLI) nozzle that occurs in the beltlineregion was fabricated from non-ferritic Inconel material and has beenconsidered in the Adjusted Reference Temperature (ART) evaluation.
The1 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)material properties of the [[ 1] material havebeen considered with the fluence for the nozzle location. Application of new Integrated Surveillance Program (ISP) testing andanalysis results from the BFNP Unit 2 surveillance capsule that areapplicable to BFNP Unit 1.3.1 Chemistry The N16 WLI nozzle is defined as being within the beltline region, and is evaluated for ART.This nozzle is fabricated from non-ferritic Inconel materials. Therefore, the chemistry for theR]] to evaluate the ART to represent this nozzleforging.Chemistry for all other materials remains unchanged from those used in the development of thecurrently licensed P-T curves.Surveillance materials are evaluated using the chemistries obtained from Boiling Water Reactor(BWR) Vessel and Internals Project (BWRVIP)-135, Revision 2, as presented in Section 3.4. Itis noted that there are no best estimate chemistries for the BFNP Unit 1 beltline materials described in BWRVIP-135. The Chemistry Factors (CFs) for all materials are calculated based upon the requirements ofRegulatory Guide (RG) 1.99, Revision 2.3.2 Initial Reference Temperature of Nil Ductility Transition The N 16 WLI nozzle is evaluated for ART. As the nozzle forging is fabricated from Inconel, forwhich fracture toughness evaluations are not required, the [[1] are used.Surveillance materials are evaluated using the limiting initial RTNDT of the beltline plate or weldmaterial. Initial RTNDTS for all other beltline materials remain unchanged from those used in thedevelopment of the currently licensed P-T curves.3.3 Adjusted Reference Temperature The ART values for 25 and 38 EFPY included in Appendix B are developed considering thelatest BWRVIP ISP data available that is representative of the applicable materials in the BFNPUnit I RPV (Reference 6.3). The surveillance data used in the BFNP Unit I ART calculations are not obtained from actual BFNP Unit 1 RPV test specimens. The ISP plate materials are notlimiting with respect to the ART. The ISP weld is the limiting material; this value is considered in the development of the P-T curves because the ISP material is the identical heat to the materialin the BFNP Unit I RPV.The N 16 nozzle ART is determined considering the initial RTNDT E[]material together with the fluence at the nozzle elevation. 2 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)3.4 Surveillance ProgramAs discussed in Appendix A, BFNP Unit 1 participates in the ISP. All three (3) of thesurveillance
- capsules, installed at plant startup, remain in the vessel. As BFNP Unit 1 is not ahost plant, the three (3) surveillance capsules have an ISP status designation of deferred(standby) per Reference 6.4.BWRVIP-135, Revision 2 and Reference 6.5 provide the surveillance data considered indetermining the chemistry and any adjusted CFs for the beltline materials.
Excerpt from BWRVIP-135, Revision 2:For BFNP Unit 1, the ISP representative plate, heat Er ]] target plate. Thisheat was contained in two (2) BFNP Unit 2 capsules that have been tested and analyzed. Theresultant chemistry is [[ ]] Cu and [[ ]] Ni. The CF from RG 1.99, Revision 2 isEr ]]. The fitted CF is [[ ]]; however, as the ISP material [[target material, the ART table evaluated the ISP plate material [[ ]]. Thismaterial [[ ]] in determining the limiting ART for the PT curves; this [[]] the limiting material. Excerpt from BWRVIP-135, Revision 2:ErFor BFNP Unit 1, the ISP representative weld, heat [[]] target weld. This heat wasSurveillance capsules that have been tested and analyzed. Er ]] Cu and [[ ]] Ni. The CF from RG 1.99 is Er , calculated using surveillance data. The scatter]]. Because the [[]] in the ART calculation. In addition, the EE1] This material for the PT curves.contained in Supplemental The resultant chemistry is. The fitted CF isin this data [[]] the limiting ART3 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)Excerpt from BWRVIP-135, Revision 2:[[IShould actual surveillance capsules be withdrawn and tested from the BFNP Unit 1 RPV(e.g., status change to be an ISP host plant under the BWRVIP ISP), compliance with 10 CFR 50Appendix H requirements on reporting test results and evaluations on the effects to plantoperations parameters (e.g., P-T limits, hydrostatic and leak test conditions) will be inaccordance with Section 3 of Reference 6.3.3.5 Reactor Coolant Pressure BoundaryAmerican Society of Mechanical Engineers (ASME) Code Section XI, Appendix G, Article G-3000, paragraph G-3 100 states that for materials "used for piping, pumps, and valves for whichimpact tests are required (NB-23 11), the tests and acceptance standards of Section III, Division 1are considered to be adequate to prevent non-ductile failure under the loadings and with thedefect sizes encountered under normal, upset, and testing conditions. Level C and Level DService Limits should be evaluated on an individual case basis (G-2300)." As described inSection 4.3 of Reference 6.1, [[ ]] the development of allnon-beltline PT limits.ASME Section III, Paragraph NB-2332 states that "Pressure-retaining materials (other thanbolting) with nominal thickness over 2.5 inches for piping (pipe and tubes) and materials forpumps, valves and fittings with any pipe connection of nominal wall thickness greater than2.5 inches shall meet the requirements of NB-233 1. The lowest service temperature shall be notlower than RTNDT + 100°F unless a lower temperature is justified by following the methodssimilar to those contained in Article G-2000." All BFNP Unit 1 ferritic Reactor CoolantPressure Boundary (RCPB) piping has nominal wall thicknesses less than 2.5 inches. OtherClass 1 RCPB components are significantly smaller with nominal wall thicknesses well below2.5 inches, including all of the ferritic RCPB components. The lowest service temperatures maybe less than 250'F in some cases; however the methods of Appendix G have been followed tojustify lower temperatures. Therefore, the requirements of NB-2332 have been met, and thereare no ferritic RCPB piping components that require consideration in the RPV P-T curves forBFNP Unit 1.4 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)The [[]], are more limiting relativeto stress than any of the Class 1 ferritic branch piping in the RCPB.With respect to concern regarding irradiation effects on RCPB piping, a qualitative fluenceassessment was performed. With a 38 EFPY peak surface Inside Diameter (ID) fluence of1.58e18 n/cm2 as the maximum fluence of concern, accrual of fluence greater than 1.Oel 7 n/cm2outside the vessel for 38 EFPY is not expected, based on historical calculations of flux vs. vesselthickness. As discussed in the BFNP Updated Final Safety Analysis Report (UFSAR), it is noted that themanner in which the RCPB was designed and constructed was to ensure a high degree ofintegrity with adequate toughness throughout the plant life. The RCPB components weredesigned and fabricated, and are maintained and tested such that adequate assurance is providedthat the boundary will behave in a non-brittle manner throughout the life of the plant.3.6 Future ChangesChanges to the curves, limits, or parameters within this PTLR, based upon new irradiation fluence data of the RPV, or other plant design assumptions in the UFSAR, can be made pursuantto 10 CFR 50.59, provided the above methodologies are utilized. The revised PTLR shall besubmitted to the NRC upon issuance. 4.0 Operating LimitsThe P-T curves provided in this report represent steam dome pressure versus minimum vesselmetal temperature and incorporate the appropriate non-beltline limits and irradiation embrittlement effects in the beltline region.The operating limits for pressure and temperature are required for three categories of operation: (a) hydrostatic pressure tests and leak tests, referred to as Curve A; (b) non-nuclear heatup/cooldown (core not critical), referred to as Curve B; and (c) core critical operation, referred to as Curve C.Complete P-T curves were developed for 25 and 38 EFPY. The P-T curves are provided inFigures 1 through 4, and a tabulation of the curves is included in Table 1 (25 EFPY) and Table 2(38 EFPY).Other temperature limits applicable to the RPV and controlled by the Technical Specification are:" Heatup and Cooldown rate limit during Hydrostatic and Class 1 Leak Testing:< 15'F/hour. " Normal Operating Heatup and Cooldown rate limit: __ 100lF/hour.
- RPV bottom head coolant temperature to RPV coolant temperature AT limitduring Recirculation Pump startup:
< 145°F.5 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)* Recirculation loop coolant temperature to RPV coolant temperature AT limitduring Recirculation Pump startup: < 50'F.* RPV flange and adjacent shell temperature limit: > 80'F.5.0 Discussion The procedures described in References 6.1 and 6.2 were used in the development of the P-Tcurves for BFNP Unit 1.The method for determining the initial RTNDT for all vessel materials is defined in Section 4.1.2of Reference 6.2. Initial RTNDT values for all vessel materials considered are presented in tablesin Appendix B of this report.In order to ensure that the limiting vessel discontinuity has been considered in the development of the P-T curves, the methods in Sections 4.3.2.1 and 4.3.2.2 of Reference 6.2 for the non-beltline and beltline
- regions, respectively, are applied.In order to determine how much to shift the P-T curves, an evaluation is performed usingTables 4-4a and 4-5a from NEDC-33178P-A (Reference 6.2). These tables define the [[]] curves.Each component listed in these tables is [[ ]] foreach component.
The required temperature is then determined by [[]], thereby resulting in the required T for the curve. As the upper vesselcurve is initially based on the [[ ]] T-RThNyT, all resulting Tvalues are compared to the [[ ]]. The [[]] the upper vessel curve. The same method is appliedfor the [[ ]] curve. In this manner, it is assured that each curve bounds the[]] that is represented. For the BFNP Unit 1 upper vessel curve, the maximum T value from the method described above is [[ ]]. The initial required T-RTN-oT for theU]]; this is then adjusted by the BFNP Unit 1-specific [R ]], resulting in [[Comparing this to the other components bounded by the upper vessel curve, the limiting value isfor the [[ ]]. The required T-RTNDT for the [[]], which is [[ ]]. It isseen that the resulting T required for the [[ ]]. As [[ ]] islimiting, the BFNP Unit 1 upper vessel curve is based on an RTNDT of [[]]. As noted above, this calculation was performed for each component shown inTable 4-4a of NEDC-33178P-A (Reference 6.2); only the limiting cases are presented here.For the BFNP Unit 1 bottom head or CRD [[]], the maximum T value from the method described above is [[]]. The required T-RTNDT for the EE]]; this is adjusted by the BFNP Unit 1-specific maximum [[]], resulting in [[ ]]. Comparing this to the next limiting value, the6 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)required T-RTNDT is [[ ]], which is added to the [[]]. It is seen that the resulting T required for the [[ ]]. Asi , the BFNP Unit 1 bottom head (CRD) curve is based on anE[[ ]]. As noted above, this calculation was performed for eachcomponent shown in Table 4-5a of NEDC-33178P-A (Reference 6.2); only the limiting case ispresented here.Appendix H of NEDC-33178P-A (Reference 6.2) contains the details of an analysis performed todetermine the baseline requirement (non-shifted) for the [[]]. It can be seen in Section H.5 ofAppendix H that the stresses developed in this finite element analysis demonstrated that the11 11,resulting in a baseline non-shifted required T-RTNDT of []]. Therefore, considering the determination of the required shift from the paragraph above for [[ ]], calculations for all components listed in Table 4-5a of NEDC-33178P-A were compared to the CRD T, which is [[ ]] (where [[]] materials). Therefore, the shift for thebottom head [.For BFNP Unit 1, the limiting surveillance
- material, E[ ]], was considered using [[ ]] as defined in Appendix I of Reference 6.2. This procedure was usedbecause the target vessel material and the surveillance material
[[ ]]. As thismaterial is a [[ ]], the use of the [[]] is considered. The calculated value of [l]] material for the beltline P-T curves.For BFNP Unit 1, there are thickness discontinuities in the vessel: (1) between the bottom headupper and lower torus; and (2) between the bottom head torus and the support skirt attachment. The P-T curves defined in Section 4.3 of Reference 6.2 are based upon an RTNDT of 56'F for thebottom head [[ ]], and 51 'F for the uppervessel. The 25 EFPY beltline curves are based on an ART of 128'F, and the 38 EFPY beltlinecurves are based on an ART of 146'F. Curves based on these temperatures bound therequirements due to the beltline thickness discontinuities. The ART of the limiting beltline material is used to adjust the beltline P-T curves to account forirradiation effects. RG 1.99, Revision 2 provides the methods for determining the ART. Thebasis for the difference in the margin terms in Tables B-4 and B-5 is due, in part, to the effective fluence associated with 25 and 38 EFPY. For many of the BFNP Unit 1 materials, the marginterm is dependent on the ARTNDT. This is consistent with Position 1.1 of RG 1.99, Revision 2,which provides the methodology for determining ART. The final paragraph of this section of theRG states that aA (standard deviation for ARTNDT) is 170F for plates and 28'F for welds, but thataA need not exceed 0.5*ARTNDT. The BFNP Unit 1 ART calculation has incorporated the use of7 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)0.5*ARTND-for all materials, where applicable. The full margin term was used for the [[The vessel beltline copper and nickel values were obtained from plant-specific vessel purchaseorder records, Certified Material Test Reports (CMTRs), or are values previously approved bythe NRC, and remain unchanged from previous submittals. The pressure head for the beltline hydrostatic test curve (Curve A) for BFNP Unit 1 is[[ ]]. This is determined using the height of the vessel and the elevation of the bottomof active fuel. The full vessel pressure head is [[ ]]. This pressure is used in the P-Tcurve analysis, considered in the determination of KI for the bottom head curve as discussed inSections 4.3.2.1.1 and 4.3.2.2.2 of the LTR.The P-T curves for the non-beltline region were conservatively developed for a BWR [[]] with nominal ID of [[ ]]. As discussed in Section 4.3.2.1.1 ofthe LTR, if the plant-specific result of Equation 4-3 is greater than that of the [[ ]]from Equation 4-2, the user is directed to perform a plant-specific evaluation. The plant-specific BFNP Unit 1 geometry demonstrates that it is bounded by the Equation 4-2 result:BFNP Unit 1: R / t1/2 = [[ ]]The analysis is therefore considered appropriate for BFNP Unit 1. The [[ ]] wasadapted to the conditions at BFNP Unit 1 using plant-specific RTNDT values for the RPV.The peak RPV ID fluence used in the P-T curve evaluation for BFNP Unit 1 at 25 EFPY is1.01 e 18 n/cm2 and at 38 EFPY is 1.58e18 n/cm2.These values were calculated using methodsthat comply with the guidelines of RG 1.190, (as discussed in Reference 6.1). This fluenceapplies to the lower-intermediate shell plates and longitudinal welds. The fluence is adjusted forthe lower plates, associated longitudinal welds, and the girth weld based upon the axial fluencedistribution calculated as part of the fluence evaluation; hence, the peak ID surface fluence forthese components is 8.14e17 n/cm2 for 25 EFPY and 1.28e18 n/cm2 for 38 EFPY. Similarly, thefluence is adjusted for the N16 nozzle based upon the axial fluence distribution; hence, the peakID surface fluence used for this component is 3.04e1 7 n/cm2 for 25 EFPY and 4.77e1 7 n/cm2 for38 EFPY.The P-T curves for the heatup and cooldown operating conditions at a given EFPY apply forboth the 1/4T and 3/4T locations. When combining pressure and thermal stresses, it is usuallynecessary to evaluate stresses at the 1/4T location (inside surface flaw) and the 3/4T location(outside surface flaw). This is because the thermal gradient tensile stress of interest is in theinner wall during cooldown and the outer wall during heatup. However, as a conservative simplification, the thermal gradient stress at the l/4T location is assumed to be tensile for bothheatup and cooldown. This results in the approach of applying the maximum tensile stress at the1/4T location. This approach is conservative because irradiation effects cause the allowable toughness, KI, at 1/4T to be less than that at 3/4T for a given metal temperature. This approachcauses no operational difficulties, because the BWR is at steam saturation conditions duringnormal operation, well above the heatup/cooldown curve limits.8 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)For the core not critical curve (Curve B) and the core critical curve (Curve C), the P-T curvesspecify a coolant heatup and cooldown temperature rate of < 1000F/hr for which the curves areapplicable.
- However, the core not critical and the core critical curves were also developed tobound transients defined on the RPV thermal cycle diagram and the nozzle thermal cyclediagrams.
For the hydrostatic pressure and leak test curve (Curve A), a coolant heatup andcooldown temperature rate of < 15°F/hr must be maintained. The P-T limits and corresponding heatup/cooldown rates of either Curve A or B may be applied while achieving or recovering from test conditions. Curve A applies during pressure testing and when the limits of Curve Bcannot be maintained. As shown in Tables B-4 and B-5, the [[]]. However, the material is contained in the [[]]. When comparing the required T-RTNDT for the [[]] provides a more restrictive curve. This is due to the reduced [[]] as discussed in Section 4.3.2.2.2 of the LTR. Therefore, for BFNP Unit 1, the axialelectroslag weld heat is the limiting material for the beltline region for 25 and 38 EFPY. Theinitial RTNDT for electroslag weld heat material is 23.1 OF. The generic pressure test P-T curve isapplied to the BFNP Unit I beltline curve by shifting the P vs. (T -RTNDT) values to reflect theART value of 128°F for 25 EFPY and 1460F for 38 EFPY.Using the fluence discussed above, the P-T curves are beltline limited for Curves A, B, and C,for 25 and 38 EFPY. For 25 EFPY, Curve A is beltline limited above 640 psig; Curve B andCurve C are beltline limited above 500 psig. For 38 EFPY, Curve A is beltline limited above570 psig; Curve B and Curve C are beltline limited above 410 psig and 420 psig, respectively. For Curve C, the upper vessel and beltline regions are bounding at pressures up to 50 psig. Forpressures between 60 psig and 312.5 psig, the upper vessel is bounding; this is true for both25 and 38 EFPY.The N16 WLI nozzle is a partial penetration design similar to that shown in Figure 1 inAppendix J of the LTR, fabricated with a [[ ]]. Reference to thisstatus is contained in the BFNP UFSAR. Therefore, the evaluation is performed, consistent withthe statement in Appendix J, [[]]. Appendix J of the LTR provides detailed results of an analysisperformed for the WLI nozzle that provides the [[]] a specific curve applicable for the WLI nozzle toensure that this location is bounded in the P-T curves. The nozzle curve [[ ]] forBFNP Unit 1 Curves A, B, or C. Sample calculations are provided in Appendix D.9 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)6.0 References 6.1 Letter, Herbert N Berkow (NRC) to George B. Stramback (GE), Final Safety Evaluation Regarding Removal of Methodology Limitations for NEDC-32983P-A, General ElectricMethodology for Reactor Pressure Vessel Fast Neutron Flux Evaluation (TAC NO.MC3 788), November 17, 2005.6.2 Letter, Thomas B. Blount (NRC) to Doug Coleman (BWROG), Final Safety Evaluation for Boiling Water Reactors Owners' Group Licensing Topical Report NEDC-33178P, General Electric Methodology for Development of Reactor Pressure Vessel Pressure-Temperature Curves (TAC NO. MD2693), April 27, 2009.6.3 B WR Vessel and Internals Project Integrated Surveillance Program (ISP) Data SourceBook and Plant Evaluations, BWRVIP-135, Revision 2, Electric Power ResearchInstitute, Palo Alto, CA, October 2009 (EPRI Proprietary). 6.4 B WR Vessel and Internals
- Project, Updated B WR Integrated Surveillance Program (ISP)Implementation Plan, BWRVIP-86, Revision 1, EPRI, Palo Alto, CA: September 2008.1016575.
(EPRI Proprietary). 6.5 Letter 2013-050, Bob Carter (EPRI) to Victor Schiavone (TVA), Evaluation of theBrowns Ferry Unit 2 1200 Surveillance Capsule Data, EPRI, Palo Alto, CA, April 10,2013 (EPRI Proprietary). 10 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)1400 --1300INITIAL RTNDT VALUESARE23°F FOR BELTLINE, 51°F FOR UPPERVESSEL,AND1100AN56°F FOR BOTTOM HEAD1000 BELTLINE CURVES/ADJUSTED AS SHOWN:EFPY SHIFT ('F)I- 25 1050_-11 800 HEATUP/COOLDOWN IU RATE OF COOLANT>~< 15oFIHRW 7000640 psigW 600 ---Z- ACCEPTABLE REGIONOF OPERATION IS TO500 THE RIGHT OF THEwU APPLICABLE CURVE400 BOTTOMU) ~ HEADw) 68*F300-UPPER VESSEL200 AND BELTLINELIMITS------- BOTTOM HEAD100 CURVE0 -0 25 50 75 100 125 150 175 200 225 250MINIMUM REACTOR VESSEL METAL TEMPERATURE (OF)Figure 1: BFNP Unit 1 Composite Curve A Pressure Test P-T Curves Effective for Up to25 EFPY1l NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)B C.9CL0_jLULU0)I-LULUCo140013001200110010009008007006005004003002001000[INITIAL RTNDT VALUESARE23.1°F FOR BELTLINE, 51°F FOR UPPERVESSEL,AND56"F FOR BOTTOM HEADBELTLINE CURVESADJUSTED AS SHOWN:EFPY SHIFT (*F)25 105HEATUP/COOLDOWN RATE OF COOLANT< 15°F/HR FOR CURVE A,100°F/HR FORCURVES B&CACCEPTABLE REGION OFOPERATION IS TO THERIGHTOFTHE APPLICABLE CURVEI------- Bottom Head Curve B-Composite Curve B-Composite Curve C0 25 50 75 100 125 150 175 200 225 250 275 300MINIMUM REACTOR VESSEL METAL TEMPERATURE (=F)Figure 2: BFNP Unit 1 Composite Curve B Core Not Critical Including Bottom Head andCurve C Core Critical P-T Curves Effective for Up to 25 EFPY12 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)1400130012001100Is.S1000Z 900IL0w 800LUa 7000S600zN 500LU400U3LU300INITIAL RTNDT VALUESARE23.1°F FOR BELTLINE, 51°F FOR UPPERVESSEL,AND56"F FOR BOTTOM HEADBELTLINE CURVESADJUSTED AS SHOWN:EFPY SHIFT ('F)38 123HEATUP/COOLDOWN RATE OF COOLANT< 15°F/HRACCEPTABLE REGIONOF OPERATION IS TOTHE RIGHT OF THEAPPLICABLE CURVE-UPPER VESSELAND BELTLINELIMITS------- BOTTOM HEADCURVE20010000 25 50 75 100 125 150 175 200 225 250MINIMUM REACTOR VESSEL METAL TEMPERATURE ('F)Figure 3: BFNP Unit 1 Composite Curve A Pressure Test P-T Curves Effective for Up to38 EFPY13 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)B CI.0w0LuCnw140013001200110010009008007006005004003002001000INITIAL RTNDT VALUESARE23.1°F FOR BELTLINE, 51"F FOR UPPERVESSEL,AND560F FOR BOTTOM HEADBELTLINE CURVESADJUSTED AS SHOWN:EFPY SHIFT (*F)38 123ACCEPTABLE REGION OFOPERATION IS TO THERIGHT OF THEAPPLICABLE CURVE------- Bottom Head Curve B-Composite Curve B-Composite Curve CI!IL 12LTU0 25 50 75 100 125 150 175 200 225 250 275 300MINIMUM REACTOR VESSEL METAL TEMPERATURE (*F)Figure 4: BFNP Unit 1 Composite Curve B Core Not Critical Including Bottom Head andCurve C Core Critical P-T Curves Effective for Up to 38 EFPY14 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)Table 1: BFNP Unit 1 Tabulation of Curves -25 EFPYBOTTOM UPPER RPV &HEAD BELTLINE ATPRESSURE25EP (PSIG)25 EFPY(PSIG) CURVE A CURVE A(OF) (OF)BOTTOM UPPER RPV &HEAD BELTLINE AT25 EFPYCURVE B CURVE B(OF) (OF)0102030405060708090100110120130140150160170180190200210220230240250260270280290300310312.5312.568.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.083.183.183.183.183.183.183.183.183.183.183.183.183.183.183.183.183.183.183.183.183.183.183.183.183.183.183.183.183.183.183.183.183.1113.168.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.083.183.183.183.183.183.183.183.183.183.183.183.183.185.288.491.293.996.598.9101.2103.3105.3107.3109.1110.9112.6114.2115.8117.3118.8120.2121.5121.9143.1LIMITING25 EFPYCURVE C(OF)83.183.183.183.183.183.191.098.2104.2109.3113.8117.9121.7125.2128.4131.2133.9136.5138.9141.2143.3145.3147.3149.1150.9152.6154.2155.8157.3158.8160.2161.5161.9183.115 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)PRESSURE(PSIG)320330340350360370380390400410420430440450460470480490500510520530540550560570580590600610620630640650660BOTTOM UPPER RPV &HEAD BELTLINE AT25 EFPYCURVE A CURVE ABOTTOM UPPER RPV &HEAD BELTLINE AT25 EFPYCURVE B CURVE B(OF) (OF)(OF)68.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.068.269.9(OF)113.1113.1113.1113.1113.1113.1113.1113.1113.1113.1113.1113.1113.1113.1113.1113.1113.1113.1113.1113.1113.1113.1113.1113.1113.1113.1113.1113.1113.1113.1113.1113.1113.1115.3117.468.068.068.068.068.068.068.068.068.068.068.068.070.473.376.078.681.183.485.687.889.891.893.795.597.399.0100.6102.2103.8105.3106.7108.1109.5110.8112.1143.1143.1143.1143.1143.1143.1143.1143.1143.1143.1143.1143.1143.1143.1143.1143.1143.1143.1143.1143.8145.5147.0148.6150.1151.5152.9154.3155.6156.9158.1159.4160.6161.7162.9164.0LIMITING25 EFPYCURVE C(OF)183.1183.1183.1183.1183.1183.1183.1183.1183.1183.1183.1183.1183.1183.1183.1183.1183.1183.1183.1183.8185.5187.0188.6190.1191.5192.9194.3195.6196.9198.1199.4200.6201.7202.9204.016 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)PRESSURE(PSIG)67068069070071072073074075076077078079080081082083084085086087088089090091092093094095096097098099010001010BOTTOM UPPER RPV &HEAD BELTLINE AT25 EFPYCURVE A CURVE A(OF) (OF)BOTTOM UPPER RPV &HEAD BELTLINE AT25 EFPYCURVE B CURVE B(OF) (OF)71.673.274.776.277.779.180.581.883.184.485.686.888.089.290.391.492.593.594.695.696.697.598.599.4100.4101.3102.1103.0103.9104.7105.6106.4107.2108.0108.7119.5121.5123.4125.2127.0128.7130.3131.9133.5135.0136.5137.9139.3140.6141.9143.2144.4145.6146.8148.0149.1150.2151.3152.4153.4154.4155.4156.4157.3158.3159.2160.1161.0161.9162.7113.4114.7115.9117.0118.2119.3120.4121.5122.6123.6124.6125.6126.6127.5128.5129.4130.3131.2132.0132.9133.7134.6135.4136.2137.0137.7138.5139.3140.0140.7141.5142.2142.9143.6144.2165.1166.2167.2168.2169.2170.2171.2172.1173.1174.0174.9175.8176.6177.5178.3179.2180.0180.8181.5182.3183.1183.8184.6185.3186.0186.7187.4188.1188.8189.5190.1190.8191.4192.0192.7LIMITING25 EFPYCURVE C(OF)205.1206.2207.2208.2209.2210.2211.2212.1213.1214.0214.9215.8216.6217.5218.3219.2220.0220.8221.5222.3223.1223.8224.6225.3226.0226.7227.4228.1228.8229.5230.1230.8231.4232.0232.717 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)BOTTOM UPPER RPV &HEAD BELTLINE ATPRESSURE25EP (PSIG)25 EFPY(PSIG) CURVE A CURVE A(OF) (OF)BOTTOM UPPER RPV &HEAD BELTLINE AT25 EFPYCURVE B CURVE B(OF) (OF)10151020103010351040105010551060107010801090110011051110112011301140115011601170118011901200121012201230124012501260127012801290130013101320109.1109.5110.3110.6111.0111.7112.1112.4113.2113.9114.6115.2115.6115.9116.6117.2117.9118.5119.1119.8120.4121.0121.6122.2122.8123.3123.9124.5125.0125.6126.1126.7127.2127.7128.3163.1163.6164.4164.8165.2166.0166.4166.8167.6168.4169.1169.9170.2170.6171.3172.0172.7173.4174.1174.8175.4176.1176.7177.4178.0178.6179.2179.9180.5181.0181.6182.2182.8183.4183.9144.6144.9145.6145.9146.2146.9147.2147.5148.1148.8149.4150.0150.3150.6151.2151.8152.3152.9153.5154.0154.6155.1155.7156.2156.8157.3157.8158.3158.8159.3159.8160.3160.8161.3161.8193.0193.3193.9194.2194.5195.1195.4195.7196.3196.9197.4198.0198.3198.6199.1199.6200.2200.7201.2201.8202.3202.8203.3203.8204.3204.8205.3205.8206.2206.7207.2207.6208.1208.6209.0LIMITING25 EFPYCURVE C(OF)233.0233.3233.9234.2234.5235.1235.4235.7236.3236.9237.4238.0238.3238.6239.1239.6240.2240.7241.2241.8242.3242.8243.3243.8244.3244.8245.3245.8246.2246.7247.2247.6248.1248.6249.018 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)BOTTOM UPPER RPV &HEAD BELTLINE ATPRESSURE25EP (PSIG)25 EFPY(PSIG) CURVE A CURVE A(OF) (OF)BOTTOM UPPER RPV &HEAD BELTLINE AT25 EFPYCURVE B CURVE B(OF) (OF)13301340135013601370138013901400128.8129.3129.8130.3130.8131.3131.8132.3184.5185.0185.6186.1186.6187.1187.7188.2162.2162.7163.2163.6164.1164.5165.0165.4209.5209.9210.3210.8211.2211.6212.1212.5LIMITING25 EFPYCURVE C(OF)249.5249.9250.3250.8251.2251.6252.1252.519 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)Table 2: BFNP Unit 1 Tabulation of Curves -38 EFPYPRESSURE(PSIG)0102030405060708090100110120130140150160170180190200210220230240250260270280290300310312.5UPPER RPVBOTTOM &HEAD BELTLINEATCURVE A 38EFPY(OF) CURVE A(OF)68.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.1UPPER RPVBOTTOM &HEAD BELTLINEATCURVE B 38 EFPY(OF) CURVE B(OF)68.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 83.168.0 85.268.0 88.468.0 91.268.0 93.968.0 96.568.0 98.968.0 101.268.0 103.368.0 105.368.0 107.368.0 109.168.0 110.968.0 112.668.0 114.268.0 115.868.0 117.368.0 118.868.0 120.268.0 121.568.0 121.9LIMITING38 EFPYCURVE C(OF)83.183.183.183.183.183.191.098.2104.2109.3113.8117.9121.7125.2128.4131.2133.9136.5138.9141.2143.3145.3147.3149.1150.9152.6154.2155.8157.3158.8160.2161.5161.920 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)PRESSURE(PSIG)312.5320330340350360370380390400410420430440450460470480490500510520530540550560570580590600610620630640650UPPER RPVBOTTOM &HEAD BELTLINEATCURVE A 38 EFPY(OF) CURVE A(OF)68.0 113.168.0 113.168.0 113.168.0 113.168.0 113.168.0 113.168.0 113.168.0 113.168.0 113.168.0 113.168.0 113.168.0 113.168.0 113.168.0 113.168.0 113.168.0 113.168.0 113.168.0 113.168.0 113.168.0 113.168.0 113.168.0 113.168.0 113.168.0 113.168.0 113.168.0 113.168.0 113.168.0 114.968.0 118.068.0 120.968.0 123.668.0 126.268.0 128.768.0 131.068.2 133.3UPPER RPVBOTTOM &HEAD BELTLINEATCURVE B 38 EFPY(OF) CURVE B(OF)68.0 143.168.0 143.168.0 143.168.0 143.168.0 143.168.0 143.168.0 143.168.0 143.168.0 143.168.0 143.168.0 143.168.0 144.168.0 146.470.4 148.673.3 150.876.0 152.878.6 154.781.1 156.683.4 158.485.6 160.287.8 161.889.8 163.591.8 165.093.7 166.695.5 168.197.3 169.599.0 170.9100.6 172.3102.2 173.6103.8 174.9105.3 176.1106.7 177.4108.1 178.6109.5 179.7110.8 180.9LIMITING38 EFPYCURVE C(OF)185.6185.6185.6185.6185.6185.6185.6185.6185.6185.6185.6185.6186.4188.6190.8192.8194.7196.6198.4200.2201.8203.5205.0206.6208.1209.5210.9212.3213.6214.9216.1217.4218.6219.7220.921 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)UPPER RPVBOTTOM &HEAD BELTLINEPRESSURE A(PSIG)AT(PSIG) CURVE A 38 EFPY(OF) CURVE A(OF)660 69.9 135.4670 71.6 137.5680 73.2 139.5690 74.7 141.4700 76.2 143.2710 77.7 145.0720 79.1 146.7730 80.5 148.3740 81.8 149.9750 83.1 151.5760 84.4 153.0770 85.6 154.5780 86.8 155.9790 88.0 157.3800 89.2 158.6810 90.3 159.9820 91.4 161.2830 92.5 162.4840 93.5 163.6850 94.6 164.8860 95.6 166.0870 96.6 167.1880 97.5 168.2890 98.5 169.3900 99.4 170.4910 100.4 171.4920 101.3 172.4930 102.1 173.4940 103.0 174.4950 103.9 175.3960 104.7 176.3970 105.6 177.2980 106.4 178.1990 107.2 179.01000 108.0 179.9UPPER RPVBOTTOM &HEAD BELTLINEATCURVE B 38 EFPY(OF) CURVE B(OF)112.1 182.0113.4 183.1114.7 184.2115.9 185.2117.0 186.2118.2 187.2119.3 188.2120.4 189.2121.5 190.1122.6 191.1123.6 192.0124.6 192.9125.6 193.8126.6 194.6127.5 195.5128.5 196.3129.4 197.2130.3 198.0131.2 198.8132.0 199.5132.9 200.3133.7 201.1134.6 201.8135.4 202.6136.2 203.3137.0 204.0137.7 204.7138.5 205.4139.3 206.1140.0 206.8140.7 207.5141.5 208.1142.2 208.8142.9 209.4143.6 210.0LIMITING38 EFPYCURVE C(OF)222.0223.1224.2225.2226.2227.2228.2229.2230.1231.1232.0232.9233.8234.6235.5236.3237.2238.0238.8239.5240.3241.1241.8242.6243.3244.0244.7245.4246.1246.8247.5248.1248.8249.4250.022 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)PRESSURE(PSIG)10101015102010301035104010501055106010701080109011001105111011201130114011501160117011801190120012101220123012401250126012701280129013001310UPPER RPVBOTTOM &HEAD BELTLINEATCURVE A 38 EFPY(OF) CURVE A(OF)108.7 180.7109.1 181.1109.5 181.6110.3 182.4110.6 182.8111.0 183.2111.7 184.0112.1 184.4112.4 184.8113.2 185.6113.9 186.4114.6 187.1115.2 187.9115.6 188.2115.9 188.6116.6 189.3117.2 190.0117.9 190.7118.5 191.4119.1 192.1119.8 192.8120.4 193.4121.0 194.1121.6 194.7122.2 195.4122.8 196.0123.3 196.6123.9 197.2124.5 197.9125.0 198.5125.6 199.0126.1 199.6126.7 200.2127.2 200.8127.7 201.4UPPER RPVBOTTOM &HEAD BELTLINEATCURVE B 38 EFPY(OF) CURVE B(OF)144.2 210.7144.6 211.0144.9 211.3145.6 211.9145.9 212.2146.2 212.5146.9 213.1147.2 213.4147.5 213.7148.1 214.3148.8 214.9149.4 215.4150.0 216.0.150.3 216.3150.6 216.6151.2 217.1151.8 217.6152.3 218.2152.9 218.7153.5 219.2154.0 219.8154.6 220.3155.1 220.8155.7 221.3156.2 221.8156.8 222.3157.3 222.8157.8 223.3158.3 223.8158.8 224.2159.3 224.7159.8 225.2160.3 225.6160.8 226.1161.3 226.6LIMITING38 EFPYCURVE C(OF)250.7251.0251.3251.9252.2252.5253.1253.4253.7254.3254.9255.4256.0256.3256.6257.1257.6258.2258.7259.2259.8260.3260.8261.3261.8262.3262.8263.3263.8264.2264.7265.2265.6266.1266.623 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)PRESSURE(PSIG)132013301340135013601370138013901400UPPER RPVBOTTOM &HEAD BELTLINEATCURVE A 38 EFPY(OF) CURVE A(OF)128.3 201.9128.8 202.5129.3 203.0129.8 203.6130.3 204.1130.8 204.6131.3 205.1131.8 205.7132.3 206.2UPPER RPVBOTTOM &HEAD BELTLINEATCURVE B 38 EFPY(OF) CURVE B(OF)161.8 227.0162.2 227.5162.7 227.9163.2 228.3163.6 228.8164.1 229.2164.5 229.6165.0 230.1165.4 230.5LIMITING38 EFPYCURVE C(OF)267.0267.5267.9268.3268.8269.2269.6270.1270.524 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)Appendix AReactor Vessel Material Surveillance ProgramNone of the BFNP Unit I surveillance capsules have been removed from the reactor vessel. Allthree capsules have been in the reactor vessel since plant startup.As described in the BFNP Unit 1 UFSAR Section 4.2.6, Inspection and Testing, the BWRVIPISP will determine the removal schedule for the remaining BFNP Unit 1 surveillance capsules. The BFNP Unit 1 material surveillance program is administered in accordance with theBWRVIP ISP. The ISP combines the United States (US) BWR surveillance programs into asingle integrated program. This program uses similar heats of materials in the surveillance programs of BWRs to represent the limiting materials in other vessels. It also adds data from theBWR SSP. Per the BWRVIP ISP, BFNP Unit 1 is not a host plant; all surveillance capsules areclassified as "Deferred". 25 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)Appendix BBFNP Unit 1 Reactor Pressure Vessel P-T Curve Supporting Plant-Specific Information 26 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)TOP HEADTOP HEAD FLANGE-SHELL FLANGESHELL COURSE #5SHELL COURSE #4SHELL COURSE #3SHELL COURSE #2SHELL COURSE #1TOP OFACTIVE FUEL(TAF) 368.3"BOTTOM OFACTIVE FUEL(BAF) 218.3"BOTTOM HEADSUPPORT SKIRTNote: The WLI nozzle centerline is at 366" elevation, at the top of active fuel.Figure B-i: BFNP Unit 1 Reactor Pressure Vessel27 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)Table B-i: BFNP Unit 1 Initial RTNDT Values for RPV Plate and Flang Materials Test DropTest Charpy Energy (T50r60) Weight RTNDTComponent Heat Temp (ft.lb) (*F) NDT (°F)(*F) _ (*F)PLATES & FORGINGS: Top Head & FlangeShell Flange (IDK48)48-127-1 ALU 55 10 118 90 79 -20 10 10Top Head Flange (rMK209)209-127-1 AMW 56 10 120 109 126 -20 10 10Top Head Dollar (MK201) Not201-122-2 C-1354-3 40 67 58 51 10 Available 40Top Head Side Plates (MK202)202-122-1 A0057-2 10 45 41 55 -2 10 10202-122-2 A0057-2 10 37 30 42 20 10 20202-122-5 C1182-1 10 41 60 50 -2 10 10202-122-6 C1182-1 10 57 45 62 -10 10 10202-139-5 C2737-2 10 68 90 86 -20 10 10202-139-6 C2737-2 10 84 78 86 -20 10 10Shell CoursesUpper Shell Plates (MK60)6-127-7 A0973-1 10 57 60 41 -2 10 106-127-12 C1942-2 10 46 52 52 -12 10 106-127-19 C2496-2 10 56 58 54 -20 10 10Transition Shell Plates (MK16)15-127-2 C-2533-2 10 53 48 43 -6 10 1015-127-5 A-0954-3 10 46 40 32 16 10 1615-127-6 A-0954-3 10 41 52 45 -2 10 10Upper Intermediate Shell Plates (MK59)6-127-3 B5842-1 10 63 62 61 -20 10 106-127-8 A0954-1 10 52 60 55 -20 10 106-127-10 B5853-2 10 70 65 66 -20 10 10Lower Intermediate Shell Plates (MK58)6-139-19 C2884-2 10 33 55 34 14 0 146-139-20 C2868-2 10 46 55 25 30 0 306-139-21 C2753-1 10 39 58 57 2 -20 2Lower Shell Segments (MK57)6-127-2 B5864-1 10 84 73 62 20 -206-127-4 A1009-1 10 62 84 77 10 -106-127-1 A0999-1 10 56 59 66 20 -20Bottom HeadBottom Head Upper Torus (MK2)2-122-7 B5924-1 40 75 70 75 10 40 402-122-8 B5924-1 40 37 61 44 36 40 402-122-10 A0942-2 40 62 62 65 10 40 402-127-7 C2412-3 40 91 90 57 10 40 402-127-8 C2412-3 40 95 92 82 10 40 402-127-9 C2393-2 40 105 125 112 10 40 40Bottom Head Lower Torus (MK4)4-122-5 A0927-2 40 71 50 59 10 40 404-122-6 A0927-2 40 75 66 64 10 40 404-122-7 C1412-3 40 30 41 40 50 40 504-122-8 C1412-3 40 27 35 49 56 40 56Bottom Head Dollar (MiK)1-122-2 B5861-1 40 45 50 49 20 40 40Note: Minimum Charpy values are provided for all materials. 28 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)Table B-2: BFNP Unit 1 Initial RTNDT Values for RPV Nozzle and Weld Materials Test DropHeat or CharpyEnergy (T5or60) Weight RTNDTComponent HeatlFluxiLot Te(p (ft-lb) (OF) NDT (°F)_ __ __ _ (*F )Nozzles:Ni Recirc Outlet Nozzle (MK8)8-127-1 E31VW 431H-1 40 109 86 90 10 40 408-139-2 AV1696 7J-6327 40 34 46 44 42 40 42N2 Recirc Inlet Nozzle (MK7)7-122-1 ZT2872 9709-1 40 65 54 58 10 30 307-122-7 ZT2869 9704-1 40 31 38 39 48 30 487-127-9 E25VW 433H-9 40 93 103 110 10 40 407-122-10 ZT2872 9709-2 40 65 54 58 10 30 307-122-11 Zr2885 9711-1 40 34 37 41 42 30 427-122-12 ZT2885 9711-2 40 34 37 41 42 30 427-122-13 ZT2885-3 9710-2 40 64 48 36 39 30 397-122-16 ZT-2885 40 38 38 48 35 30 357-122-18 ZT2885 9712-2 40 54 52 49 12 30 307-122-19 ZT2869 9705-1 40 69 53 42 27 30 30N3 Steam Outlet Nozzle (MK14)14-127-1 E26VW 435H-1 40 97 77 94 10 40 4014-127-2 E26VW 435H-2 40 86 84 76 10 40 4014-127-3 E26VW 435H-3 40 102 92 105 10 40 4014-127-4 E26VW 435H-4 40 119 94 94 10 40 40N4 Feedwater Nozzle (WK10)10-127-1 E25VW 436H-1 40 98 97 92 10 40 4010-127-2 E25VW 436H-2 40 124 98 105 10 40 4010-127-3 E25VW 436H-3 40 99 84 92 10 40 4010-127-4 E25VW 436H-4 40 111 98 101 10 40 4010-127-5 E25VW 436H-5 40 114 114 110 10 40 4010-127-6 E25VW 436H-6 40 117 111 112 10 40 40N5 Core Spray Nozzle (00 1)11-111-1 BT2001-2 7098 40 48 32 42 46 40 4611-111-2 BT2001-3 6945-1 40 54 36 49 38 40 40N6 Top Head Instrumentation Nozzle (W206)206-139-1 & -4 BT2615-4 40 123 143 144 10 40 40N7 Vent Nozzle (MK204)204-127-1 ZT3043-3 40 102 130 117 10 40 40N8 Jet Pump Instr. Nozzle (vg19)19-127-1 &-2 ZT3043 40 107 112 113 10 40 40N9 CRD HYD System Return Nozzle (MK13)13-145-1 EV9793 7K-6233A 40 81 50 91 10 40 40N10 Core DP & Liquid Control Nozzle (MK17)17-127-1 ZT3043 40 106 136 111 -20 40 40Nil, N12, N16 Instrumentation Nozzle (M<12) Inconel12-127-1 through 6 8564N13, N14 High & Low Pressure Seal Leak (W139)139-127-1 & -2 Not Available 40 40QN15 Drain Nozzle (MK22)22-127-1 213099 40 42 44 39 32 40 40WELDS:Cylindrical Shell Axial WeldsElectroslag Welds ESW 23.1**Girth WeldsShell 1 to Shell 2 WF 154 (SAW) 406L44, Lot 8720 20*Notes: Minimum Charpy values are provided for all materials.
- No Nil Ductility Transition (NDT) value is available on the CMTR; obtained from the purchasespecification.
- Weld initial RTNDT values were obtained from previously-approved submittals.
29 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)Table B-3: BFNP Unit 1 Initial RTNDT Values for RPVADDurtenance and Boltin2 Materials DropTest Temp Charpy Energy (Twr-60) Wegh RTNDTComponent Heat (OF) (ft-lb) (OF) Weight (OF)NDT (OF)Miscellaneous Appurtenances: Support Skit Segment (MK24)24-139-1 through -4 C3888-5 10 38 40 41 4 40 40Shroud Support (MK51, MK52. MK53) Alloy 600Steam Dryer Support Bracket (MKI 31) Stainless Steel131-127-1 through -4 00431Core Spray Bracket (MK132) Stainless Steel132-127-1 through-8 3342230Dryer Hold Down Bracket (MK133)133-127-1 through -4 EV-8446 40 38 42 37 36 40 40Guide Rod Bracket (MK134) Stainless Steel134-127-1 & -2 139506Feedwater Sparger Brackets (MK 135) Stainless Steel135-127-1 through -12 00431Stabilizer Bracket (MK1 96) 10 60 59 56 -20 40 40196-127-5 through -212 C6458-1Surveillance Brackets (MIK199 & MK200) Stainless Steel199-127-1 through -3 342633-2200-127-1 through -3 342633-2Lift Lugs (MK2 10)210-122-1, -2, -3, & -6 AI210-3B 10 83 98 95 -20 40 40CRD Penetrations (MKI 01 -MK128) Alloy 600101 through 128Refueling Containment Skirt (MK7 1)71-127-1 through -4 B7478-4B 40*Component HeatTest Temp(°F)Charpy Energy(ft-lb)LateralExpansion (mils)LowestServiceTemp (IF)STUDS:Closure (MK61) 6730502 10 34 52 68 N/A 70NUTS:Closure (MK62) 6730502 10 34 52 68 N/A 7023514 10 49 53 63 29 106780382 10 45 42 46 N/A 706790156 N/A N/A N/A N/A N/A 70BUSHINGS: Closure (MK63) T3798 10 61 69 73 51 10M2513 10 64 65 67 40 10M2514 10 66 56 70 42 10EV9474 10 67 64 62 N/A 70AV3107 10 63 70 72 N/A 70WASHERS:Closure (MK64 and MK65) 6730502 10 34 52 68 N/A 706780278 N/A N/A N/A N/A N/A 70Notes: Minimum Charpy values are provided for all materials.
- No NDT value is available on the CMTR; obtained from the purchase specification.
30 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)Table B-4:Thickness in inches = 6.125Thickness in inches = 6.125Thickness in inches = 6.125Thickness in inches = 6.125BFNP Unit 1 Adjusted Reference Temperatures for Up to 25 EFPYLower-Intermediate Plates25 EFPY Peak I.D. fluence = 1.01 E+1 8 n/cm225 EFPY Peak 4 T fluence = 6.99E+17 n/cm2Lower Plates & Lower to Lower-Intermediate Girth Weld25 EFPY Peak I.D. fluence = 8 14E+17 n/cm225 EFPY Peak 1/4 T fluence = 5.64E+17 n/cm2Axial Welds25 EFPY Peak I.D. fluence = 1.01E+I8 n/cm225 EFPY Peak / T fluence = 6.99E+17 n/cm2Water Level Instrumentation Nozzle25 EFPY Peak I.D. fluence = 3.04E+17 n/cm225 EFPY Peak 1/4 T fluence = 2.11 E+1 7 n/cm225 25 25Initial 'A T EFPY EFPY EFPYComponent Heat or %Cu %Ni CF Au RTteDT Fluence /T Gi Ga OF a/4 T / TomoetHeatlLot CF R°D FOF n/cm2 ARTNDT Shift ARTOF OF OFPLATES:Lower Shell6-127-1 A0999-1 0.14 0.60 100 -20 5.64E+17 31 0 16 31 62 426-127-2 B5864-1 0.15 0.44 101 -20 5.64E+17 32 0 16 32 63 436-127-4 A1009-1 0.14 0.50 96 -10 5.64E+17 30 0 15 30 60 50Lower-Intermediate Shell6-139-19 C2884-2 0.12 0.53 82 14 6.99E+17 28 0 14 28 57 716-139-20 C2868-2 0.09 0.48 58 30 6.99E+17 20 0 10 20 41 716-139-21 C2753-1 0.08 0.50 51 1 2 6.99E+17 18 0 9 18 36 38WELDS:Axial WeldsElectroslag Weld (ESW)Lower to Lower-Intermediate Girth WeldWFI540.240.270.370.6014118423.16.99E+ 175.64E+ 174957131025285659105117128137406L442031 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)25 25 25Initial / T EFPY EFPY EFPYComponent Heat or %Cu %Ni CF Adjusted RTNMT Fluence 1T MarginHeat/Lot CF RTA lec T o F 1/4T 'ATOF n/cm2 ARTNDT Shift ARTOF OF OFBEST ESTIMATE CHEMISTRIES: NoneNOZZLES:N 16 Water Level Instrumentation Forging Inconel I] [[ ]] 2.1 lE+17 [[Weld InconelINTEGRATED SURVEILLANCE PROGRAM:Plate,2"36.99E+17Weld"3-4_ 5.64E+17Notes:(I) [[(2) The representative plate material is not the same heat number as the target plate; therefore the RG 1.99 R2 CF is used. This information is not applicable to development of the P-Tcurves and is provided for information only.(3)32 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)Table B-5:Thickness in inches = 6.125Thickness in inches = 6.125Thickness in inches = 6.125Thickness in inches = 6.125BFNP Unit 1 Adjusted Reference Temperatures for Up to 38 EFPYLower-Intermediate Plates38 EFPY Peak I.D. fluence = I 58E+l 8 n/cm238 EFPY Peak 1/4 T fluence = 1.09E+18 n/cm2Lower Plates & Lower to Lower-Intermediate Girth Weld38 EFPY Peak I.D. fluence = I 28E+18 n/cm238 EFPY Peak 14 T fluence = 8.86E+17 n/cm2Axial Welds38 EFPY Peak I.D. fluence = 1.58E+18 n/cm238 EFPY Peak A T fluence = 1.09E+18 n/cm2Water Level Instrumentation Nozzle38 EFPY Peak I.D. fluence = 4.77E+1 7 n/cm238 EFPY Peak V, T fluence = 3.30E+17 n/cm238 38 38Initial '/4 T EFPY EFPY EFPYComponent Heat or %Cu %Ni CF A s RTNDT Fluence / T Mr Gi n T 1 TomoetHeat/Lot CF °F % AOF n/cm2 ARTNDT Shift ARTOF OF OFPLATES:Lower Shell6-127-1 A0999-1 0.14 0.60 100 -20 8.86E+17 39 0 17 34 73 536-127-2 B5864-1 0.15 0.44 101 -20 8.86E+17 40 0 17 34 74 546-127-4 A1009-1 0.14 0.50 96 -10 8.86E+17 38 0 17 34 72 62Lower-Intermediate Shell6-139-19 C2884-2 0.12 0.53 82 14 1.09E+18 36 0 17 34 70 846-139-20 C2868-2 0.09 0.48 58 30 1.09E+18 25 0 13 25 50 806-139-21 C2753-1 0.08 0.50 51 2 1.09E+18 22 0 11 22 44 46WELDS:Axial WeldsESWLower to Lower-Intermediate Girth WeldWFI540.240.270.370.6014118423.11.09E+ 188.86E+/-176172131028286259123132146152406L442033 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)38 38 38Heat or Adjusted Initial 1/4/4 T EFPY Margin EFPY EFPYComponentHeat/Lot %Cu %Ni CF RTNDT Fluence 1/4 T ol GA OF / T / THF n/cm2 ARTNDT Shift ARTOF OF OFBEST ESTIMATE CHEMISTRIES: NoneNOZZLES:N 16 Water Level Instrumentation Forging Inconel ... [[ ] 3.03E+17 [[ 1]Weld InconelINTEGRATED SURVEILLANCE PROGRAM:Plate"".11 1.09E+18 [[Weld 3"4' 8.86E+17Notes:(1) [[(2) The representative plate material is not the same heat number as the target plate; therefore the RG 1.99 R2 CF is used. This information is not applicable to development of the P-Tcurves and is provided for information only.(3) []]34 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)Table B-6: BFNP Unit 1 RPV Beltline P-T Curve Input Values for 38 EFPYAdjusted RTNDT = Initial RTNDT + Shift A = 23.1 + 123 = 146.1OF(Based on ART values in Table B-5)Vessel Height H = 875.13 inchesBottom of Active Fuel Height B = 216.3 inchesVessel Radius (to base metal) R = 125.7 inchesMinimum Vessel Thickness (without clad) t = 6.125 inchesNote: The ART for 25 EFPY is 1287F as shown in Table B-4.35 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)Table B-7: BFNP Unit 1 Definition of RPV Beltline RegioniElevation Component (inches fromRPV "60")Shell # 2 -Top of Active Fuel (TAF) 366.3Shell # 1 -Bottom of Active Fuel (BAF) 216.3Shell # 2 -Top of Extended Beltline Region (38 EFPY) 378.3Shell # 1 -Bottom of Extended Beltline Region (38 EFPY) 206.4Circumferential Weld Between Shell #1 and Shell #2 258.0Circumferential Weld Between Shell #2 and Shell #3 391.5Centerline of Recirculation Outlet Nozzle in Shell # 1 161.5Top of Recirculation Outlet Nozzle N I in Shell # 1 188.0Centerline of Recirculation Inlet Nozzle N2 in Shell # 1 181.0Top of Recirculation Inlet Nozzle N2 in Shell # 1 193.3Centerline of WLI Nozzle in Shell # 2 366.0Bottom of WLI Nozzle in Shell # 2 364.6Note:(1) The beltline region is defined as any location where the peak neutron fluence is expected to exceed or equal1.0e 17 n/cm2.Based on the above, it is concluded that none of the BFNP Unit I reactor vessel plates, nozzles,or welds, other than those included in the ART table, are in the beltline region.36 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)Appendix CBFNP Unit 1 Reactor Pressure Vessel P-T Curve Checklist 37 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)Table C-I provides a checklist that defines pertinent points of interest regarding the methods andinformation used in developing the BFNP Unit 1 PTLR. This table demonstrates that allimportant parameters have been addressed in accordance with the P-T curve LTR (Reference 6.2), and includes
- comments, resolutions, and clarifications as necessary.
Table C-i: BFNP Unit 1 Checklist Parameter Completed Comments/Resolutions/Clarifications Initial RTNDTInitial RTNDT has been determined for all The N 16 WLI nozzle is considered vessel materials including plates, flanges, within the beltline region. This forgingforgings, studs, nuts, bolts, welds. was [[Include explanation (including methods/sources) of any exceptions, are considered. resolution of discrepant data(e.g., deviation from originally reported All other information remainsvalues). unchanged from previous submittals. Appendix B contains tables of all initialRTNDT values.Has any non-plant-specific initial RTNDT Plate heat [[ ]] information information (e.g., ISP, comparison to other was obtained from the ISP database. plant) been used? This material is [[]] to the target vessel platematerial and, in accordance with the ISPguidance; this data was [[]] the limiting ART.Weld heat [[ ]] information was obtained from the ISP database. This material is [[ ]]to the target vessel weld material and, inaccordance with ISP guidance, this datawas [[ ]] thelimiting ART.If deviation from the P-T curve LTR No deviations from the P-T curve LTRprocess occurred, sufficient supporting process were applied.information has been included(e.g., Charpy V-Notch data used todetermine an Initial RTNDT).38 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)....a.r ...........-.. .. Cohmme s Ieslon l ns~ 4 4All previously published Initial RTNDT M RVID was reviewed for the beltlinevalues from sources such as the Generic materials; all initial RTNDT values agree;Letter (GL) 88-0 1, Reactor Vessel Integrity no further review was performed. Database (RVID), UFSAR, etc., have beenreviewed. Adjusted Reference Temperature Sigma I (ao, standard deviation for Initial Z Sigma I is equal to 0°F for all materials RTNDT) is 0°F unless the RTNDT was except the weld heats. The ESWobtained from a source other than CMTRs. material uses (aI of 13'F and theIf c, is not equal to 0°F, reference/basis has Submerged Arc Weld (SAW) girth weldbeen provided, material uses a y, of 10'F, consistent with previous NRC submittals. Sigma a (GA, standard deviation forARTNDT) is determined per RG 1.99,Revision 2Chemistry has been determined for all The N 16 WLI nozzle is [[vessel beltline materials including plates,forgings (if applicable), and welds.]] isInclude explanation (including considered. methods/sources) of any exceptions, resolution of discrepant data ISP data is obtained from BWRVIP-135, (e.g., deviation from originally reported Revision 2.values).No deviations from previously reportedvalues.Non-plant-specific chemistry information Z Plate heat [[ ]] has been(e.g., ISP, comparison to other plant) used evaluated using best estimate chemistry has been adequately defined and described. from the ISP.For any deviation from the P-T curve LTR Z While not a deviation, it is noted that theprocess, sufficient information has been limiting ART for the beltline materials isincluded. that for a weld heat. As this material]] toprovide bounding P-T curves for thebeltline region.No deviations from the P-T curve LTRprocess.39 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)All previously published chemistry values RVID was reviewed; all chemistry from sources such as the GL88-01, RVID, values agree; no further review wasUFSAR, etc., have been reviewed. performed. The fluence used for determination of ARTand any extended beltline region wasobtained using an NRC-approved methodology. The fluence calculation provides an axial .distribution to allow determination of thevessel elevations that experience fluence of1.Oel 7 n/cm2 both above and below activefuel.The fluence calculation provides an axialdistribution to allow determination of thefluence for intermediate locations such asthe beltline girth weld (if applicable) or forany nozzles within the beltline region.All materials within the elevation rangewhere the vessel experiences a fluence>1.0e17 n/cm2 have been included in theART calculation. All initial RTNDT andchemistry information is available orexplained. Discontinuities The discontinuity comparison has been There are no deviations. performed as described in Section 4.3.2.1of the P-T curve LTR. Any deviations have been explained. Discontinuities requiring additional [ All discontinuities are bounded by eithercomponents (such as nozzles) to be the Upper Vessel, Bottom Head, orconsidered part of the beltline have been Beltline curve; those bounded by theadequately described. It is clear which Upper Vessel and/or Bottom Head are incurve is used to bound each discontinuity, accordance with Tables 4-4a and 4-5a ofthe LTR.Appendix G of the P-T curve LTR The thickness discontinuity evaluation describes the process for considering a demonstrates that no additional thickness discontinuity, both beltline and adjustment is required; the curves boundnon-beltline. If there is a discontinuity in the discontinuity stresses. the vessel that requires such an evaluation, the evaluation was performed. Theaffected curve was adjusted to bound thediscontinuity, if required. _40 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)ýQX GO, .i .t~ý .a mbAppendix H of the P-T curve LTR definesthe basis for the CRD Penetration curvediscontinuity and the appropriate transient application. The plant-specific evaluation bounds the requirements of Appendix H.Appendix J of the P-T curve LTR definesthe basis for the WLI Nozzle curvediscontinuity and the appropriate transient application. The plant-specific evaluation bounds the requirements of Appendix J.41 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)Appendix DSample P-T Curve Calculations 42 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)Beltline Water Level Instrumentation NozzlePressure Test (Curve A)K, for the discontinuity is determined considering the K1 obtained from Table 7 of Appendix J(for hydrotest). For 1070 psig, this K1is [[ ]] as follows:KI]JT-RTNDT is calculated in the following manner:T-RTNDT]]The ART is added to T-RTNDT to obtain the required T:TI]This temperature is not obvious from the P-T curve as it is bounded by the [[Core Not Critical (Curve B)Ki for the discontinuity is determined considering the K, obtained from Table 5 of Appendix J.I]The transient used for the WLI nozzle, defined in Appendix J, is used in determination of K1.The total K1 is therefore: KI =T-RTNDT is calculated in the following manner:T-RTNDT= [[The ART is added to T-RTNDT to obtain the required T:T = [This temperature is not obvious from the P-T curve as it is bounded by the [[]]43 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)Correction FactorThe total stress for the WLI exceeds the yield stress; therefore, the correction factor, R, iscalculated to consider the nonlinear effects in the plastic region according the following equationbased on the assumptions and recommendation of Welding Research Council (WRC) Bulletin175 as shown in Equation 4-7 of Reference 6.2.R [ays -'pm -+ ((Qltotai -(Yys)/30)]/(Gtotal -Gpm)Applied to the WLI:R -]]44 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)Beltline Calculations Excludin2 Water Level Instrumentation NozzlePressure Test (Curve A) at 1070 psig for 38 EFPYThe limiting beltline material is the bounding !component for Curve A; therefore, a samplecalculation for this material, not including the WLI nozzle is provided for 1070 psig.The limiting ART applied to the beltline PT curves is [[ ]] for the [[]], which is also in the [[ ]]. However, the [[]] as defined in ASME Appendix G.When comparing the resultant required temperature to that for the axial ESW, it is seen that theaxial weld will provide a more limiting curve. Therefore, the ART of 1467F is used indeveloping the beltline P-T curve.Pressure is calculated to include hydrostatic pressure for a full vessel:P 1070 psig + (H -B)*0.0361 psi/inch(H=vessel height; B=elevation of bottom of active fuel)= 1070 + (875.13 -216.3)
- 0.0361= 1093.8 psigPressure Stress:o = PR/t(P=pressure; R=vessel radius; t=vessel thickness)
= 1.094
- 125.7 6.125= 22.45 ksiMm = 0.926'/t= 0.9264i6.125
= 2.29The stress intensity factor, Klt, is calculated as described in Section 4.3.2.2.4 of the LTR, exceptthat "G" is 15SF/hr instead of 1.000F/hr.Mt = 0.2914, from ASME Appendix G, Figure G-2214-1AT = GC2 /213G = coolant heatup/cooldown rate of 15°F/hrC= minimum vessel thickness including clad = 6.125"+0.1875"=6.313"=0.526 ftP = thermal diffusivity at 550°F = 0.354 ft2 /hr= (15*(0.526)2) / (2*0.354) = 5.86OF45 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)Kit = Mt
- AT= 0.2914
- 5.86-1.71Kim G
- Mm= 22.45
- 2.29= 51.4T-RTNDT = ln[(1.5*Kim
+ Kit -33.2)/20.734]/0.02 = ln[(1.5*51.4 + 1.71 -33.2)/20.734]/0.02 = 39.40FT is calculated by adding the ART:T = 39.4+146= 185.40F for P = 1070 psig at 38 EFPYThis temperature represents the limiting point on Curve A and is cited as 185.6°F in Table 2.Core Not Critical (Curve B) at 1070 psig for 38 EFPYThe WLI nozzle is not the bounding component at any point in the pressure range; therefore, asample calculation for the limiting beltline
- material, which bounds the WLI nozzle, is providedfor 1070 psig.As discussed above and in Section 5.0 and Table B-5, the limiting ART applied to the beltlineCurve B is 146°F for the axial ESW.The AT term is calculated as shown above for the Pressure Test case, but the temperature ratechange is 100°F/hr instead of 15°F/hr.
Therefore, AT equals 39°F.P -1070 psig + (H -B)*0.0361 psi/inch(H=vessel height; B=elevation of bottom of active fuel)= 1070 + (875.13 -216.3)
- 0.0361-1093.8 psigPressure Stress:o = PR/t(P=pressure; R=vessel radius; t=vessel thickness)
= 1.094
- 125.7 / 6.125= 22.45 ksiKim = G*Mm= 22.45
- 2.29= 51.4146 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)Kit = Mt
- AT (for the 1 000F/hr case)= 0.2914
- 39= 11.36T-RTNDT = ln[(2.0*K 1n + Kit -33.2)/20.734]/0.02
= ln[(2.0*51.41 + 11.36 -33.2)/20.734]/0.02 = 68.12OFT is calculated by adding the ART:T = 68.1+146= 214.10F for P = 1070 psig at 38 EFPYThis temperature represents the limiting point on Curve B and is cited in Table 2 as 214.3'F.47 NEDO-33445 Revision 0Non-Proprietary Information-Class I (Public)Feedwater Nozzle Calculations An evaluation was performed for the FW nozzle as described in Section 4.3.2.1.3 The first part of the evaluation is as described
- earlier, where it is assured thatcomponent that is represented by the upper vessel nozzle curve is bounded by the [[]]. A second evaluation was performed using the BFNP Unit 1-specific dimensions; this evaluation is shown below to demonstrate that the applicable to BFNP Unit 1:of the LTR.the limitingFW nozzle curve isVessel radius to base metal, R,Vessel thickness, t,Vessel pressure, PvPressure stress = PR/t =Dead Weight + Thermal Restricted Free End stressTotal Stress = [[ 3] ]]The factor F (a/rn) from Figure A5-I of "PVRC Recommendations on Toughness Requirements for Ferritic Materials,"
WRC Bulletin 175, August 1972 (WRC-175) is determined where:a -A (tn2 + tv2) '/2tn= thickness of nozzlet, thickness of vesselrn= apparent radius of nozzle = ri + 0.29*rcri= actual inner radius of nozzlerc= nozzle radius (nozzle comer radius) ]]Therefore, a/rn = [[WRC-175 for an intensity factor, K1, is 1.5 7 (7ra)1/2* F(a/rn):. The value F (a/rn), taken from Figure A5-I of]]. Including the safety factor of 1.5, the stressBFNP Unit 1 Plant-Specific Nominal K, = 1.5 * [[1]A detailed upper vessel example calculation for core not critical conditions is provided inSection 4.3.2.1.4 of the LTR. Section 4.3.2.1.3 of the LTR presents the [[]] for the FW nozzle evaluation upon which the baseline non-shifted upper vessel P-T curve is based. It can be seen that the nominal K, from this BFNP Unit1 evaluation is E[ ]]. Therefore, it has been shown that the nominal K1 for theBFNP Unit 1-specific FW nozzle is less than the [[ ]] KI, demonstrating applicability of the FW nozzle curve for BFNP Unit 1.48 ENCLOSURE 4Enclosed are the affidavits supporting the request to withhold proprietary information (included in Enclosure
- 2) from the public.
GE-Hitachi Nuclear Energy Americas LLCAFFIDAVIT I, Peter M. Yandow, state as follows:(1) I am the Vice President, Nuclear Plant Projects/Services Licensing, Regulatory
- Affairs, ofGE-Hitachi Nuclear Energy Americas LLC ("GEH"),
and have been delegated the functionof reviewing the information described in paragraph (2) which is sought to be withheld, andhave been authorized to apply for its withholding. (2) The information sought to be withheld is contained in GEH proprietary report, NEDC-33445P, "Tennessee Valley Authority Browns Ferry Nuclear Plant Unit I Pressure andTemperature Limits Report (PTLR) Up to 25 and 38 Effective Full-Power Years," datedDecember 2013. The GEH proprietary information in NEDC-33445P is identified by adotted underline inside double square brackets. [[This. sentence is an example... 3.]] In eachcase, the superscript notation 13ý refers to Paragraph (3) of this affidavit, which provides thebasis for the proprietary determination. (3) In making this application for withholding of proprietary information of which it is theowner or licensee, GEH relies upon the exemption from disclosure set forth in the Freedomof Information Act ("FOIA"), 5 U.S.C. Sec. 552(b)(4), and the Trade Secrets Act, 18 U.S.C.Sec. 1905, and NRC regulations 10 CFR 9.17(a)(4), and 2.390(a)(4) for trade secrets(Exemption 4). The material for which exemption from disclosure is here sought alsoqualifies under the narrower definition of trade secret, within the meanings assigned tothose terms for purposes of FOIA Exemption 4 in, respectively, Critical Mass EnergyProject v. Nuclear Regulatory Commission, 975 F.2d 871 (D.C. Cir. 1992), and PublicCitizen Health Research Group v. FDA, 704 F.2d 1280 (D.C. Cir. 1983).(4) The information sought to be withheld is considered to be proprietary for the reasons setforth in paragraphs (4)a. and (4)b. Some examples of categories of information that fit intothe definition of proprietary information are:a. Information that discloses a process, method, or apparatus, including supporting dataand analyses, where prevention of its use by GEH's competitors without license fromGEH constitutes a competitive economic advantage over other companies;
- b. Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture,
- shipment, installation, assurance of quality, or licensing of a similar product;c. Information that reveals aspects of past, present, or future GEH customer-funded development plans and programs, resulting in potential products to GEH;d. Information that discloses trade secret or potentially patentable subject matter forwhich it may be desirable to obtain patent protection.
(5) To address 10 CFR 2.390(b)(4), the information sought to be withheld is being submitted toNRC in confidence. The information is of a sort customarily held in confidence by GEH,Page 1 of 3 GE-Hitachi Nuclear Energy Americas LLCand is in fact so held. The information sought to be withheld has, to the best of myknowledge and belief, consistently been held in confidence by GEH, not been disclosed
- publicly, and not been made available in public sources.
All disclosures to third parties,including any required transmittals to the NRC, have been made, or must be made, pursuantto regulatory provisions or proprietary or confidentiality agreements that provide formaintaining the information in confidence. The initial designation of this information asproprietary information, and the subsequent steps taken to prevent its unauthorized disclosure, are as set forth in the following paragraphs (6) and (7).(6) Initial approval of proprietary treatment of a document is made by the manager of theoriginating component, who is the person most likely to be acquainted with the value andsensitivity of the information in relation to industry knowledge, or who is the person mostlikely to be subject to the terms under which it was licensed to GEH. Access to suchdocuments within GEH is limited to a "need to know" basis.(7) The procedure for approval of external release of such a document typically requires reviewby the staff manager, project manager, principal scientist, or other equivalent authority fortechnical
- content, competitive effect, and determination of the accuracy of the proprietary designation.
Disclosures outside GEH are limited to regulatory bodies, customers, andpotential customers, and their agents, suppliers, and licensees, and others with a legitimate need for the information, and then only in accordance with appropriate regulatory provisions or proprietary or confidentiality agreements. (8) The information identified in paragraph (2), above, is classified as proprietary because itcontains the detailed GEH methodology for pressure-temperature curve analysis for theGEH Boiling Water Reactor (BWR). These methods, techniques, and data along with theirapplication to the design, modification, and analyses associated with the pressure-temperature curves were achieved at a significant cost to GEH.The development of the evaluation processes along with the interpretation and application of the analytical results is derived from the extensive experience databases that constitute amajor GEH asset.(9) Public disclosure of the information sought to be withheld is likely to cause substantial harm to GEH's competitive position and foreclose or reduce the availability of profit-making opportunities. The information is part of GEH's comprehensive BWR safety andtechnology base, and its commercial value extends beyond the original development cost.The value of the technology base goes beyond the extensive physical database andanalytical methodology and includes development of the expertise to determine and applythe appropriate evaluation process. In addition, the technology base includes the valuederived from providing analyses done with NRC-approved methods.The research, development, engineering, analytical and NRC review costs comprise asubstantial investment of time and money by GEH. The precise value of the expertise todevise an evaluation process and apply the correct analytical methodology is difficult toquantify, but it clearly is substantial. GEH's competitive advantage will be lost if itsPage 2 of 3 GE-Hitachi Nuclear Energy Americas LLCcompetitors are able to use the results of the GEH experience to normalize or verify theirown process or if they are able to claim an equivalent understanding by demonstrating thatthey can arrive at the same or similar conclusions. The value of this information to GEH would be lost if the information were disclosed to thepublic. Making such information available to competitors without their having beenrequired to undertake a similar expenditure of resources would unfairly provide competitors with a windfall, and deprive GEH of the opportunity to exercise its competitive advantage to seek an adequate return on its large investment in developing and obtaining these veryvaluable analytical tools.I declare under penalty of perjury that the foregoing affidavit and the matters stated therein aretrue and correct to the best of my knowledge, information, and belief.Executed on this 6th day of December 2013.Peter M. YandowVice President, Nuclear Plant Projects/Services Licensing, Regulatory AffairsGE-Hitachi Nuclear Energy Americas LLC3901 Castle Hayne Rd.Wilmington, NC 28401Peter.Yandow@ge.com Page 3 of 3 E l ELECTRIC POWERRESEARCH INSTITUTE 2013-2 15 BWR Vessel & Internals Project (BWRVIP)December 9, 2013Brian EberTechnical ServicesLead Project ManagerGE Hitachi Nuclear Energy3901 Castle Hayne RoadATC2 Second Floor, Cube 4337Wilmington, NC 28401 USA
Subject:
Transmittal of EPRI Proprietary Affidavit to the NRCThe purpose of this letter is to transmit a proprietary affidavit for transmittal of the following document to the NRC:"GE Hitachi Nuclear Energy, NEDC-33445P, Revision 0, December 2013, Tennessee ValleyAuthority Browns Ferry Nuclear Plant Unit 1 Pressure and Temperature Limits Report (PTLR)up to 25 and 38 Effective Full Power Years"If you have any questions on this subject, please contact Andrew McGehee by telephone at 704-502-6440 or by email at amcgeheeaepri.com. Sincerely, Andrew McGeheeEPRI, BWRVIP Program Managerc: Vic Schiavone, TVATogether ... Shaping the Future of Electricity PALO ALTO OFFICE3420 Hillview Avenue, Polo Alto, CA 94304-1395 USA
- 650.855.2000
- Customer Service 800.313.3774
- www.epri.com 1 I ELECTRIC POWERRESEARCH INSTITUTE Christine KingDirector,
- Director, Nuclear Fuels & Chemistry Nuclear Power SectorDecember 6, 2014Document Control DeskOffice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Request for Withholding of the Following Proprietary Information Included in:GE Hitachi Nuclear Energy, NEDC-33445P, Revision 0, December 2013,Tennessee Valley Authority Browns Ferry Nuclear Plant Unit I Pressure andTemperature Limits Report (PTLR) up to 25 and 38 Effective Full Power YearsTo Whom It May Concern:This is a request under 10 C.F.R. §2.390(a)(4) that the U.S. Nuclear Regulatory Commission ("NRC")withhold from public disclosure the information identified in the enclosed Affidavit consisting of theproprietary information owned by Electric Power Research Institute, Inc. ("EPRr') identified in the attachedreport. Proprietary and non-proprietary versions of the Report and the Affidavit in support of this request areenclosed. EPRI desires to disclose the Proprietary Information in confidence to assist the NRC review of the enclosedsubmittal by Tennessee Valley Authority for Browns Ferry Nuclear Plant Unit 1 PTLR. The Proprietary Information is not to be divulged to anyone outside of the NRC nor shall any copies be made of theProprietary Information provided herein. EPRI welcomes any discussions and/or questions relating to theinformation enclosed. If you have any questions about the legal aspects of this request for withholding, please do not hesitate tocontact me at (650) 855-2164. Questions on the content of the Report should be directed to AndyMcGehee of EPRI at (704) 502-6440. Sincerely, Attachment(s) Together ...Shaping the Future of Electricity PALO ALTO OFFICE3420 Hillview Avenue, Palo Alto, CA 94304-1338 USA
- 650.855.2000
- Customer Service 800.313.3774
- www.epri.com E 3I 1ELECTRIC POWERRESEARCH INSTITUTE AFFIDAVIT RE: Request for Withholding of the Following Proprietary Information Included in:GE Hitachi Nuclear Energy, NEDC-33445P, Revision 0, December 2013, Tennessee Valley Authority Browns Ferry Nuclear Plant Unit 1 Pressure and Temperature LimitsReport (PTLR) up to 25 and 38 Effective Full Power YearsI, Christine King, being duly sworn, depose and state as follows:I am the Director, Nuclear Fuels & Chemistry at Electric Power Research Institute, Inc. whose principal office is located at 3420 Hillview Avenue, Palo Alto, California
("EPRI") and I have been specifically delegated responsibility for the above-listed report that contains EPRI Proprietary Information that is sought under thisAffidavit to be withheld ("Proprietary Information"). I am authorized to apply to the U.S. Nuclear Regulatory Commission ("NRC") for the withholding of the Proprietary Information on behalf of EPRI.EPRI Information is identified by a solid underline inside double square brackets. [[This sentence is anexample. ]{E} Tables containing EPRI proprietary information are identified with double square brackets beforeand after the object. In each case the superscript notation {E} refers to this affidavit as the bases for theproprietary determination. EPRI requests that the Proprietary Information be withheld from the public on the following bases:Withholding Based Upon Privileged And Confidential Trade Secrets Or Commercial Or Financial Information (see e.,g. 10 C.F.R. §2.390(a)(4):
- a. The Proprietary Information is owned by EPRI and has been held in confidence byEPRI. All entities accepting copies of the Proprietary Information do so subject to written agreements imposingan obligation upon the recipient to maintain the confidentiality of the Proprietary Information.
The Proprietary Information is disclosed only to parties who agree, in writing, to preserve the confidentiality thereof.b. EPRI considers the Proprietary Information contained therein to consitiute tradesecrets of EPRI. As such, EPRI holds the Information in confidence and disclosure thereof is strictly limited toindividuals and entities who have agreed, in writing, to maintain the confidentiality of the Information.
- c. The information sought to be withheld is considered to be proprietary for the following reasons.
EPRI made a substantial economic investment to develop the Proprietary Information and, byprohibiting public disclosure, EPRI derives an economic benefit in the form of licensing royalties and otheradditional fees from the confidential nature of the Proprietary Information. If the Proprietary Information werepublicly available to consultants and/or other businesses providing services in the electric and/or nuclear powerindustry, they would be able to use the Proprietary Information for their own commercial benefit and profit andwithout expending the substantial economic resources required of EPRI to develop the Proprietary Information.
- d. EPRI's classification of the Proprietary Information as trade secrets is justified by theUniform Trade Secrets Act which California adopted in 1984 and a version of which has been adopted by over 40 states. The California Uniform Trade Secrets Act, California Civil Code §§3426 -3426.11, defines a "tradesecret" as follows:"Trade Secret" means information, including a formula,
- pattern, compilation, program device,method, technique, or process, that:(1) Derives independent economic value, actual or potential, from not being generally known tothe pubic or to other persons who can obtain economic value from its disclosure or use; and(2) is the subject of efforts that are reasonable under the circumstances to maintain itssecrecy."
- e. The Proprietary Information contained therein are not generally known or available tothe public. EPRI developed the Information only after making a determination that the Proprietary Information was not available from public sources.
EPRI made a substantial investment of both money and employee hoursin the development of the Proprietary Information. EPRI was required to devote these resources and effort toderive the Proprietary Information. As a result of such effort and cost, both in terms of dollars spent anddedicated employee time, the Proprietary Information is highly valuable to EPRI.f. A public disclosure of the Proprietary Information would be highly likely to causesubstantial harm to EPRI's competitive position and the ability of EPRI to [icense the Proprietary Information both domestically and internationally. The Proprietary Information can only be acquired and/or duplicated byothers using an equivalent investment of time and effort.I have read the foregoing and the matters stated herein are true and correct to the best of my knowledge, information and belief. I make this affidavit under penalty of perjury under the laws of the United States ofAmerica and under the laws of the State of California. Executed at 3420 Hillview Avenue, Palo Alto, California being the premises and place of business of ElectricPower Research Institute, Inc.Date: (2 UýCJrhrtina WinnIVIIII LI I/ I lli(State of California) (County of Santa Clara)Subscd ed and sworp 4 (or affirmed) before me on this 64bay of 6 V &., .20.A3 byproved to me on the basis of satisfactory evidence to bethe person(s) whgoo;tpeared f.fore m.) /Signature
- i. 76I', / -(Seal) '.:My Commiession Expires ý> day_ ..f. _ 2__, .=:: ii. =,it BERTE A. DAHLCou. # 1926383.NOTAR PUB.-CFU"'A SANTA CLARA CO.1MY CONl. EDp. MAR. 20, 2015j}}