ML16060A363

From kanterella
Revision as of 11:35, 30 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Ltr 10-Day Response to Apparent Violations in IR 2015013; EA-15-039 Palisades Nuclear Plant
ML16060A363
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/26/2016
From: Gustafson O W
Entergy Nuclear Operations
To: Louden P L
NRC/RGN-III
References
EA-15-039, PNP 2016-014
Download: ML16060A363 (1)


Text

PNP 2016-014 February 26, 2016 Mr. Patrick L. Louden U.S. Nuclear Regulatory Commission 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Entergy Nuclear Operations, Inc. Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043 Tel269 764 2000 Otto W. Gustafson

Director, Regulatory and Performance Improvement EA-15-039

Subject:

1 0-Day Response to Apparent Violations in I R 2015013; EA-15-039 Palisades Nuclear Plant Docket 50-255 License No. DPR-20

Reference:

Letter from Nuclear Regulatory Commission to Entergy Nuclear Operations, Inc. dated February 22, 2016, "Palisades Nuclear Plant, Inspection Report 05000255/20 15013; Investigation Report 3-2012-021; and Apparent Violations"

Dear Sir:

Entergy Nuclear Operations, Inc. (ENO) received the referenced letter dated February 22, 2016. The letter provides ENO the option to request a pre-decisional enforcement conference or request alternative dispute resolution (ADR). In addition, the letter requires a 10-day response to notify the NRC of the intended choice. As required by the referenced letter, ENO notified Mr. John Jandovitz, NRC Region Ill, on February 26, 2016, that the ADR process is requested to address the apparent violations.

This letter contains no new commitments and no revisions to existing commitment.

Sincerely, OWG/tad cc: Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspectors, Palisades, USNRC RECEIVED FEB 2 9 2016

  • PNP 2016-014 February 26, 2016 Mr. Patrick L. Louden U.S. Nuclear Regulatory Commission 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Entergy Nuclear Operations, Inc. Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043 Tel269 764 2000 Otto W. Gustafson
Director, Regulatory and Performance Improvement EA-15-039

Subject:

1 0-Day Response to Apparent Violations in I R 2015013; EA-15-039 Palisades Nuclear Plant Docket 50-255 License No. DPR-20

Reference:

Letter from Nuclear Regulatory Commission to Entergy Nuclear Operations, Inc. dated February 22, 2016, "Palisades Nuclear Plant, Inspection Report 05000255/20 15013; Investigation Report 3-2012-021; and Apparent Violations"

Dear Sir:

Entergy Nuclear Operations, Inc. (ENO) received the referenced letter dated February 22, 2016. The letter provides ENO the option to request a pre-decisional enforcement conference or request alternative dispute resolution (ADR). In addition, the letter requires a 10-day response to notify the NRC of the intended choice. As required by the referenced letter, ENO notified Mr. John Jandovitz, NRC Region Ill, on February 26, 2016, that the ADR process is requested to address the apparent violations.

This letter contains no new commitments and no revisions to existing commitment.

Sincerely, OWG/tad cc: Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspectors, Palisades, USNRC RECEIVED FEB 2 9 2016