ML17331B048

From kanterella
Revision as of 07:16, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Rev 1 to Monthly Operating Rept for Jul 1993 for DC Cook Nuclear Plant Unit 1,correcting Gross Electrical Energy Generation yr-to-date
ML17331B048
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/31/1993
From: JANISSE J D, TURNER D G
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17331B046 List:
References
NUDOCS 9311160039
Download: ML17331B048 (2)


Text

N.R.C.OPERATING DATAREPORTDOCKETNO.50-315DATE22/Oct/93 COMPLETED BYJDJanisseTELEPHONE 616-465-5901 OPERATING STATUS1.UnitNameD.C.CookUnit12.Reporting PeriodJuly933.LicensedThermalPower(MWt)32504.NamePlateRating(GrossMWe)11525.DesignElectrical Rating(NetMWe)10206.MaximumDependable Capacity(GROSSMWe)10567.MaximumDependable Capacity(NetMWe)1000notesRev.1Corrected theGrossGeneration YTD22/Oct/93 DGTurner8.IfChangesOccurinCapacityRatings(Itemsno.3through7)SinceLastReportGiveReasons9.PowerLevelToWhichRestricted.

IfAny(NetMWe)10.ReasonsForRestrictions.

IfAny:11.HoursinReporting Period12.No.ofHrs.ReactorWasCritical13.ReactorReserveShutdownHours14.HoursGenerator onLine15.UnitReserveShutdownHours16.GrossTherm.EnergyGen.(MWH)17.GrossElect.EnergyGen.(MWH)18.NetElect.EnergyGen.(MWH)19.UnitServiceFactor20.UnitAvailability Factor21.UnitCapacityFactor(MDCNet)22.UnitCapacityFactor(DERNet)23.UnitForcedOutageRate24.Shutdowns Scheduled overNextSixNoneThisMo.Yr.toDate744.05087.0744.05087.00'0.0744.05087.00.00.024080391631778477402052951107467965109331100.0100.0100.0100.0100.4100.498.498.50.00.0Months(Type,Date,andCumm.162887.0121981.4463.0119935.6321'351760107 114238470 109871696 74.674667~165.46.2Duration):

25.IfShutDownAtEndofReport:Period,Estimated DateofStartup:26.UnitsinTestStatus(PriortoCommercial Operation):

ForcastINITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved(9311160039 931105PDRADOCK05000315.RP,DR P~ItLUvfV