ML17331B049

From kanterella
Jump to navigation Jump to search
Rev 5 to Monthly Operating Rept for Aug 1993 for DC Cook Nuclear Plant Unit 1,correcting Gross Electrical Energy Generation yr-to-date
ML17331B049
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 08/31/1993
From: Janisse J, Doreen Turner
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17331B046 List:
References
NUDOCS 9311160043
Download: ML17331B049 (1)


Text

~

~

~

N.R.C.

OPERATING DATA REPORT DOCKET NO.

50-315 DATE 22/Oct/93 COMPLETED BY JD JANISSE TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit 1

2. Reporting Period AUGUST 1993
3. Licensed Thermal Power (MWt) 3250 4.

Name Plate Rating (Gross MWe) 1152

5. Design Electrical Rating (Net MWe) 1020 6.

Maximum Dependable Capacity (GROSS MWe) 1056 7.

Maximum Dependable Capacity (Net MWe) 1000 notes Rev.

5 Corrected the Gross Generation YTD 22/Oct/93 DG Turner

8. If Changes Occur in Capacity Ratings (Items no.

3 through

7) Since Last Report Give Reasons 9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

This Mo.

Yr. to Date Cumm.

11. Hours in Reporting Period 744.0 5831.0 163631 '

12.

No. of Hrs. Reactor Was Critical 744.0 5831.0 122725.4

13. Reactor Reserve Shutdown Hours 0.0

~

0.0 463. 0

14. Hours Generator on Line 744 '

5831.0 120679 '

15. Unit Reserve Shutdown Hours 0.0 0 '

321. 0

16. Gross Therm.

Energy Gen.

(MWH) 2414864 18732648 354174971

17. Gross Elect.

Energy Gen.

(MWH) 764060 6059170 115002530

18. Net Elect.

Energy Gen.

(MWH) 736627 5845958 110608323

19. Un'it Service Factor 100.0 100.0 74.7
20. Unit Availability Factor 100.0 100.0 74 '
21. Unit Capacity Factor (MDC Net) 99 '

100 '

67 '

22. Unit Capacity Factor (DER Net) 97 '

98.3 65.5

23. Unit Forced Outage Rate 0.0 0.0 6.2 24.

Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):

Refuelin Outa e to be in"Februar 5

1994 for an estminated f 90 da s.

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved P3ZZl.600e3

~3l10>

PDR ADOCK 05000315 R

PDR