ML17331B051

From kanterella
Jump to navigation Jump to search
Rev 1 to Monthly Operating Rept for Dec 1991 Fo DC Cook Nuclear Plant Unit 1,correcting Unit Capacity Factors to Use Max Dependable Capacity (MDC) MDC=1000 Mwe Net Yr Round
ML17331B051
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/31/1991
From: Doreen Turner, Zygmont C
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17331B046 List:
References
NUDOCS 9311160065
Download: ML17331B051 (2)


Text

N.R.C.

OPERATING DATA REPORT DOCKET NO.

50-315 DATE 02/Nov/93 COMPLETED BY CB ZXGMONT TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit 1

2. Reporting Period DEC.91
3. Licensed Thermal Power (MWt) 3250 4.

Name Plate Rating (Gross MWe) 1152

5. Design Electrical Rating (Net MWe) 1020 6.

Maximum Dependable Capacity (GROSS MWe) 1056 7.

Maximum Dependable Capacity (Net MWe) 1000 notes Rev.

1 Corrected UCFs to use MDC=1000 MWe Net year round.

02/Nov/93 DG Turner

8. If Changes Occur in Capacity Ratings (Items no.

3 through

7) Since Last Report Give Reasons v

N ion er usin seasonally adjusted values; 9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

This Mo.

Yr. to Date Cumm.

11. Hours in Reporting Period 744.0 8760.0 149016.0 12.

No. of Hrs. Reactor Was Critical 744.0 7754 '

111141.3

13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 744 '

7527.2 109156 '

15. Unit Reserve Shutdown Hours 0 ~ 0 0.0 321.0
16. Gross Therm.

Energy Gen.

(MWH) 2412246 23755041 319184689

17. Gross Elect.

Energy Gen.

(MWH) 778220 7614530 103745760

18. Net Elect.

Energy Gen.

(MWH) 751092 7338236 99771709

19. Unit Service Factor 100 '

85 '

74 '

20. Unit Availability Factor 100.0 85 '

74 '

21. Unit Capacity Factor (MDC Net) 101. 0 83.8 66 '
22. Unit Capacity Factor (DER Net) 99 '

81 '

64.8

23. Unit Forced Outage Rate 0 ~ 0 2.9 6.8 24.

Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):

Refuelin Outa e to be in June 15, 1992 for an estimated duration of 90 da s.

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved 931 1 160065., 931 105 PDR'DOCN 05000315 lI.'

R PBR

~ I C

t y

l y.

I