Text

N.R-C OPERATING DATA REPORT DOCKET NO ~

50-315 DATE 22/Oct/93 COMPLETED BY DG TURNER TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit, Name D.

C.

Cook Unit 1

2. Reporting Period SEPT 1993
3. Licensed Thermal Power (MWt) 3250 4.

Name Plate Rating (Gross MWe) 1152

5. Design Electrical Rating (Net MWe) 1020 6.

Maximum Dependable Capacity (GROSS MWe) 1056 7.

Maximum Dependable Capacity (Net MWe) 1000 notes Rev.

1 Corrected the Gross Generation YTD 22/Oct/93 DG Turner 8'. If Changes Occur in Capacity Ratings (Items no.

3 through

7) Since Last Report Give Reasons 9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

11.

12.

13.

14 ~

15

'6

'7

'8.

19.

20.

21.

22

'3.

24'his Mo.

Yr. to Date Hours in Reporting Period 720.0 6551.0 No. of Hrs. Reactor Was Critical 720 ~ 0 6551.0 Reactor Reserve Shutdown Hours 0.0 0.0 Hours Generator on Line 720. 0 6551.0 Unit Reserve Shutdown Hours 0 '

0.0 Gross Therm.

Energy Gen.

(MWH) 2214841 20947490 Gross Elect.

Energy Gen.

(MWH) 707030 6766200 Net Elect.

Energy Gen.

(MWH) 680592 6526550 Unit Service Factor 100.0 100.0 Unit Availability Factor 100.0 100. 0 Unit Capacity Factor (MDC Net) 94 '

99.6 Unit Capacity Factor (DER Net) 92.7 97 '

Unit Forced Outage Rate 0.0 0.0 Shutdowns Scheduled over Next Six Months (Type, Date,and in F bruar 5

19 4

Cumm.

164351.0 123445.4 463.0 121399.6 321.0 356389813 115709560 111288915 74.8 74 '

67.3 65 '6.1 Duration):

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved

,I l'I I

d C