Rev 1 to Monthly Operating Rept for Sept 1993 for DC Cook Nuclear Plant Unit 1,correcting Gross Electrical Energy Generation yr-to-date
ML17331B050
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 09/30/1993
From: Doreen Turner
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17331B046 List:
References
NUDOCS 9311160049
Download: ML17331B050 (2)


Text

N.R-C OPERATING DATA REPORT DOCKET NO ~ 50-315 DATE 22/Oct/93 COMPLETED BY DG TURNER TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit, Name D. C. Cook Unit 1
2. Reporting Period SEPT 1993 notes
3. Licensed Thermal Power (MWt) 3250 Rev. 1
4. Name Plate Rating (Gross MWe) 1152 Corrected the Gross
5. Design Electrical Rating (Net MWe) 1020 Generation YTD
6. Maximum Dependable Capacity (GROSS MWe) 1056 22/Oct/93 DG Turner
7. Maximum Dependable Capacity (Net MWe) 1000 8'. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since

'his Last Report Give Reasons

9. Power Level To Which Restricted.
10. Reasons For Restrictions. If If Any Any:

(Net MWe)

Mo. Yr. to Date Cumm.

11. Hours in Reporting Period 720.0 6551.0 164351.0
12. No. of Hrs. Reactor Was Critical 720 0~ 6551.0 123445.4
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0 14 Hours Generator on Line

~ 720. 0 6551.0 121399.6 15 Unit Reserve Shutdown Hours 0' 0.0 321.0

'6 Gross Therm. Energy Gen. (MWH) 2214841 20947490 356389813

'7 Gross Elect. Energy Gen. (MWH) 707030 6766200 115709560

'8.

Net Elect. Energy Gen. (MWH) 680592 6526550 111288915

19. Unit Service Factor 100.0 100.0 74.8
20. Unit Availability Factor 100.0 100. 0 74 '
21. Unit Capacity Factor (MDC Net) 94 ' 99.6 67.3 22 Unit Capacity Factor (DER Net) 92.7 97 ' 65 '

'3.

Unit Forced Outage Rate 0.0 0.0 6.1 24 Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):

in F bruar 5 19 4

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION