Surry Power Station, Units 1 and 2 - Revised License Renewal Commitment Pressurizer Surge Line Weld Inspection Frequency Reference Correction in Supporting Technical Report
ML18040A461
Person / Time
Site: Surry  Dominion icon.png
Issue date: 02/05/2018
From: Sartain M D
Dominion Energy Virginia, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
17-317A
Download: ML18040A461 (2)


Text

-* VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 February 5, 2018 United States Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D. C. 20555 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 REVISED LICENSE RENEWAL COMMITMENT Serial No.: 17-317A . NRA/GDM:

RO Docket Nos.: 50-280 50-281 License Nos.: DPR-32 DPR-37 PRESSURIZER SURGE LINE WELD INSPECTION FREQUENCY REFERENCE CORRECTION IN SUPPORTING TECHNICAL REPORT By letter dated November 20, 2017 (Serial No.17-317),

Virginia Electric and Power Company (Dominion Energy Virginia) submitted a request to revise the Surry Units 1 and 2 pressurizer surge line weld inspection frequency license renewa:I commitment from once every 40 months to once every 10 years for the fifth and s.ixth inservice inspection (ISi) intervals.

Attachments 1 and 2 of the subject letter includ!3d proprietary and redacted

versions, respectively, of the supporting technical report prepared by Structural Integrity Associates, Inc. (SIA) for the proposed inspection frequency change. Subsequent to the submittal of the letter, SIA identified a reference incluqed in Section 8.0, References, of the report that contained an incorrect report number. Specifically, the report number provided for Reference 23 was "SI V&V Report No.1600402.301,"

but should have been "SI V&V Report No.1601007.301."

Please note this correction during your review of Dominion Energy Virginia's commitment change request.

If you have any questions or require additional information, please contact Mr. Gary D. Miller at (804) 273-2771.

Respectfully, Mark D. Sartain Vice President-Nuclear Engineering and Fleet Support Commitments made in this letter: None cc: U.S. Nuclear Regulatory Commission

-Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRG Senior Resident Inspector Surry Power Station Ms. K. R. Cotton Gross NRG Project Manager-Surry U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08-G9A 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. J. R. Hall NRG Project Manager-North Anna U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08-81A 11555 Rockville Pike Rockville, Maryland 20852-2738 Serial No. 17-317A Docket Nos. 50-280/281 Page 2 of 2