Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARTSTF-17-16, Technical Specifications Task Force - Transmittal of TSTF-568, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.22017-12-19019 December 2017 Technical Specifications Task Force - Transmittal of TSTF-568, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 Project stage: Request ML18057A1632018-03-0808 March 2018 Acceptance for Review Regarding Traveler TSTF-568, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 Project stage: Acceptance Review ML18204A0242019-08-15015 August 2019 NRC Staff Feedback Draft TSTF-568, Revision 1, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2. Project stage: Draft Other ML19325C4362019-12-17017 December 2019 Cover Letter Transmitting Final SEs of Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 Project stage: Approval ML19325C4342019-12-17017 December 2019 Final Safety Evaluation of Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 Project stage: Approval 2018-03-08
[Table View] |
|
---|
Category:Acceptance Review Letter
MONTHYEARML24222A4002024-08-14014 August 2024 TSTF-602, Revise the Ventilation Filter Testing Program to Permit Alternate Challenge Agents, Acceptance Review Letter ML24207A1822024-07-25025 July 2024 TSTF-601, Extend Shield Building Completion Time After Refueling, Acceptance Review Letter ML24172A0542024-06-20020 June 2024 TSTF-600 Acceptance Review Letter TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency ML24114A2652024-04-24024 April 2024 TSTF-597 Acceptance Review Letter ML24114A2572024-04-24024 April 2024 TSTF-599 Acceptance Review Letter ML23205A2142023-08-10010 August 2023 Acceptance for Review Regarding Traveler TSTF-596, Revision 0, Expand the Applicability of the Surveillance Frequency Control Program (SFCP) ML23157A2062023-07-0505 July 2023 Acceptance for Review and Revised Schedule Regarding Traveler TSTF-576, Revise Safety/Relief Valve Requirements ML23145A2822023-06-0202 June 2023 Acceptance for Review Regarding Traveler TSTF-585, Provide an Alternative to the LCO 3.0.3 One Hour Preparation Time ML22256A2122022-09-28028 September 2022 Acceptance for Review Regarding Traveler TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22181A7442022-06-30030 June 2022 Acceptance for Review Regarding Traveler TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program ML22110A1712022-04-26026 April 2022 Acceptance for Review Regarding Traveler Tstf-584, Rev 0, Eliminate Automatic RWCU System Isolation on SLC Initiation ML22062B3362022-03-0808 March 2022 Acceptance Review of Traveler TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML20037A1292020-02-13013 February 2020 Acceptance for Review Regarding Traveler TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements ML19211D1192019-08-22022 August 2019 Acceptance Review for Traveler TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML19211D2842019-08-20020 August 2019 Acceptance Review for Traveler TSTF-554, Revise Reactor Coolant Leakage Requirements ML18057A1602018-03-26026 March 2018 Acceptance for Review Regarding Traveler TSTF-569, Revise Response Time Testing Definition, ML18057A1622018-03-26026 March 2018 Acceptance for Review Regarding Traveler TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, ML18057A1592018-03-0808 March 2018 Acceptance for Review Regarding Traveler TSTF-557, Spent Fuel Storage Rack Neutron Absorber Monitoring Program ML18057A1632018-03-0808 March 2018 Acceptance for Review Regarding Traveler TSTF-568, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML17325B6722017-11-28028 November 2017 Acceptance for Review Regarding Traveler TSTF-564, Safety Limit MCPR ML17236A1352017-08-29029 August 2017 Acceptance for Review Regarding Traveler TSTF-565, Clarify the Term Operational Convenience in the LCO 3.0.2 Bases ML16194A0102016-08-11011 August 2016 Acceptance for Review Regarding Traveler TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement ML14223A7822014-08-14014 August 2014 Acceptance for Review Regarding Traveler TSTF-547, Revision 0, Clarification of Rod Position Requirements ML12158A5472012-06-13013 June 2012 TSTF-523 Acceptance Letter and RAIs ML12163A1592012-06-13013 June 2012 TSTF-454, Extend PCIV Completion Times (NEDC-33046), Acceptance Letter ML1128007042011-10-19019 October 2011 Acceptance for Review of Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs ML1111703472011-05-0606 May 2011 Acceptance for Review of Traveler TSTF-490, Revision 1, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML0827504932008-10-0707 October 2008 Acceptance for Review and Establishment of Milestone Schedule for TSTF Traveler 508, Revision 0, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation ML0715600542007-06-0707 June 2007 Acceptance for Review and Establishment of Milestone Schedule for TSTF Traveler 425, Revision 1, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5. 2024-08-14
[Table view] |
Text
March 8, 2018
Technical Specifications Task Force 11921 Rockville Pike, Suite 100
Rockville, MD 20852
SUBJECT:
ACCEPTANCE FOR REVIEW REGARDING TRAVELER TSTF-568, "CLARIFY APPLICABILITY OF BWR/4 TS 3.6.2.5 AND TS 3.6.3.2" (EPID L-2017-PMP-0024)
Dear Members of the Technical Specifications Task Force:
By letter dated December 19, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17353A437), you subm itted to the U.S. Nuclear Regulatory Commission (NRC) a request to incorporate Traveler TSTF-568, "Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2," into the standard technical specifications.
Section 170.21 of Title 10 of the Code of Federal Regulations requires that Travelers are subject to fees based on the full cost of the review. You did not request a fee waiver; therefore, NRC staff hours have been billed accordingly. The NRC staff estimates that the review will require approximately 530 staff hours including project management time.
The NRC staff has completed a preliminary review of your submission and determined it is sufficiently complete and appropriate to initiate a more comprehensive review. The review will generally follow the schedule below.
MILESTONE SCHEDULE DATE Issue Request for Additional Information April 17, 2018 Issue Draft Safety Evaluation September 28, 2018 Issue Final Safety Evaluation December 19, 2018 The dates are provided for draft and final safety evaluations (SEs) have been expedited at your request. In order to meet these dates the TSTF will need to respond to RAIs in 30 days and provide comments to the draft SE in 15 days. If you have any questions, please contact me at
(301) 415-1774 or via e-mail to Michelle.Honcharik@nrc.gov
. Sincerely,
/RA/ Michelle C. Honcharik, Senior Project Manager Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation
Project No. 753
ML18057A163; *concurred via e-mail NRR-106 OFFICE DSS/STSB DSS/STSB* NAME MHoncharik VCusumano DATE 2/26/2018 3/8/2018 Technical Specifications Task Force Project No. 753 cc: Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100
Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com
James P. Miksa Entergy Nuclear Operations, Inc.
Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043
Email: jmiksa@entergy.com
Jordan L. Vaughan Duke Energy EC2ZF / P.O. Box 1006
Charlotte, NC 28202
Email: jordan.vaughan@duke-energy.com
Lisa L. Williams Energy Northwest Columbia Generating Station PO Box 968
Mail Drop PE20 Richland, WA 99352-0968 E-mail: llwilliams@energy-northwest.com
David M. Gullott Exelon Generation
4300 Winfield Road
Warrenville IL 60555 Email: David.Gullott@exeloncorp.com
Wesley Sparkman
Southern Nuclear Operating Company
42 Inverness Center Parkway / Bin B237 Birmingham, AL 35242 Email: wasparkm@southernco.com