| Q | CCA | Title |
---|
05000331/FIN-2014009-04 | 2014Q3 | | Failure To Update the Updated Final Safety Analysis Report |
05000331/FIN-2014004-02 | 2014Q3 | H.5 | Hydraulic Control Unit Configuration Control Error |
05000331/FIN-2014009-01 | 2014Q3 | P.2 | Inadequately Performed Drawing Revision Related to CAPR |
05000331/FIN-2014009-02 | 2014Q3 | H.8 | Incomplete Corrective Actions To Prevent Recurrence |
05000331/FIN-2014009-03 | 2014Q3 | H.8 | Failure to Establish EFR Attributes to Assess the Effectiveness of Corrective Actions |
05000331/FIN-2014010-01 | 2014Q3 | H.6 | Failure to Remove Water From Conduits Containing Safety-Related Cables |
05000331/FIN-2014008-05 | 2014Q3 | | Inadequate Procedure for Flow Balancing ESW System |
05000331/FIN-2014008-04 | 2014Q3 | | Failure to fully Incorporate the Sequential Loading Relay Functions into the UFSAR. |
05000331/FIN-2014008-03 | 2014Q3 | | Failure to Include Minimum Required System Voltage as an Acceptance Criterion in the 125 Vdc Station Battery Surveillances Test Prcoedures |
05000331/FIN-2014004-03 | 2014Q3 | H.13 | Failure to Perform Causal Evaluations for A Standby Filter Unit Issues |
05000331/FIN-2014004-01 | 2014Q3 | P.1 | Failure to Perform Critical Equipment Failure Evaluations |
05000331/FIN-2014008-02 | 2014Q3 | | Failure to Verify Startup Transformer Neutral Grounding Resistor Design Assumption |
05000331/FIN-2014008-01 | 2014Q3 | | Failure to Verify Design Adequacy of Loss of Voltage Relay Setting |
05000331/FIN-2014005-07 | 2014Q4 | P.5 | Ineffective Radiological Engineering Controls Resulted in Unplanned and Unintended Radiological Intakes to Workers |
05000331/FIN-2014005-06 | 2014Q4 | H.11 | Failure to Determine Dose Rates Prior to Entry into a High Radiation Area |
05000331/FIN-2014005-05 | 2014Q4 | H.1 | Inadequate Containment Isolation Valve Leak Tightness Test Procedure |
05000331/FIN-2014005-03 | 2014Q4 | H.5 | Failure to Evaluate Maintenance Activities for Preconditioning |
05000331/FIN-2014005-09 | 2014Q4 | | Failure to Test of Evaluate the Seismic Critical Characteristic for a Commercial Grade Circuit Breaker |
05000331/FIN-2014005-08 | 2014Q4 | P.1 | Failure to Evaluate Several Safety Related Relays Installed Beyond Their Design Life |
05000331/FIN-2014005-04 | 2014Q4 | H.13 | Failure to Accomplish Procedure for Leaking Pipe Snubber |
05000331/FIN-2014005-02 | 2014Q4 | | Liquid Penetrant Testing Procedures Not Qualified for their Full Applicability Range |
05000331/FIN-2014005-01 | 2014Q4 | H.8 | Construction Code Used during a Replacement Activity Not Reconciled with the Owner's Requirements |
05000331/FIN-2015008-01 | 2015Q1 | | Failure to Identify and Evaluate the Effects of Vessel OverfillScenario |
05000331/FIN-2014011-01 | 2015Q1 | H.2 | Failure to Install Torus Coating in Accordance with Established Processes |
05000331/FIN-2015404-01 | 2015Q1 | H.9 | Security |
05000331/FIN-2015001-01 | 2015Q1 | H.12 | Failure to Classify and Declare a Notification of Unusual Event |
05000331/FIN-2015001-02 | 2015Q1 | | Failure to Report Required Monitoring Results to the NRC |
05000331/FIN-2014011-02 | 2015Q1 | | Inadequate Coating Strainer Debris Loading Calculation |