| Q | CCA | Title |
---|
05000331/FIN-2013008-01 | 2013Q4 | H.14 | Failed to Establish Measures for the Selection and Review for the Suitability of Safety-Related Cables |
05000331/FIN-2013008-02 | 2013Q4 | H.14 | Failed to Ensure the SBDG Power Cables Were Not Submerged |
05000331/FIN-2014003-03 | 2014Q2 | P.2 | Failure to Prescribe Work Order Planning Procedure Appropriate to the Circumstances |
05000331/FIN-2014009-01 | 2014Q3 | P.2 | Inadequately Performed Drawing Revision Related to CAPR |
05000331/FIN-2014009-02 | 2014Q3 | H.8 | Incomplete Corrective Actions To Prevent Recurrence |
05000331/FIN-2014009-03 | 2014Q3 | H.8 | Failure to Establish EFR Attributes to Assess the Effectiveness of Corrective Actions |
05000331/FIN-2014008-01 | 2014Q3 | | Failure to Verify Design Adequacy of Loss of Voltage Relay Setting |
05000331/FIN-2014008-02 | 2014Q3 | | Failure to Verify Startup Transformer Neutral Grounding Resistor Design Assumption |
05000331/FIN-2014004-01 | 2014Q3 | P.1 | Failure to Perform Critical Equipment Failure Evaluations |
05000331/FIN-2014004-03 | 2014Q3 | H.13 | Failure to Perform Causal Evaluations for A Standby Filter Unit Issues |
05000331/FIN-2014008-03 | 2014Q3 | | Failure to Include Minimum Required System Voltage as an Acceptance Criterion in the 125 Vdc Station Battery Surveillances Test Prcoedures |
05000331/FIN-2014008-04 | 2014Q3 | | Failure to fully Incorporate the Sequential Loading Relay Functions into the UFSAR. |
05000331/FIN-2014008-05 | 2014Q3 | | Inadequate Procedure for Flow Balancing ESW System |
05000331/FIN-2014010-01 | 2014Q3 | H.6 | Failure to Remove Water From Conduits Containing Safety-Related Cables |
05000331/FIN-2014004-02 | 2014Q3 | H.5 | Hydraulic Control Unit Configuration Control Error |
05000331/FIN-2014009-04 | 2014Q3 | | Failure To Update the Updated Final Safety Analysis Report |