IR 05000331/2015201

From kanterella
Jump to navigation Jump to search
NRC Security Inspection Report 05000331/2015201
ML15287A348
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 10/15/2015
From: Rachel Johnson
NRC/NSIR/DSO/DDSO/SPEB
To: Vehec T
NextEra Energy Duane Arnold
References
IR 2015201
Download: ML15287A348 (3)


Text

ber 15, 2015

SUBJECT:

DUANE ARNOLD ENERGY CENTER - NRC SECURITY INSPECTION REPORT 05000331/2015201

Dear Mr. Vehec:

On September 25, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Duane Arnold Energy Center and discussed the results on September 30, 2015, with Mr. John Schwertfeger, Site Security Manager, and other members of your staff.

Inspectors documented the inspection results in the enclosed report.

NRC inspectors documented one finding of very low security significance (Green) in this report.

This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest this violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Nuclear Security and Incident Response; and the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Duane Arnold Energy Center.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Request for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21, Protection of Safeguards Information: Performance Requirements, and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information -

Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)

and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA by Joshua Berry for/

Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No: 50-331 License No: DPR-49 Nonpublic Enclosure: Inspection Report 05000331/2015201 w/Attachments: Supplemental Information cc w/encl: T. Vehec, Site Vice President J. Schwertfeger, Site Security Manager M. Fencl, Nuclear Fleet Security c/c w/o encl: M. Nazar, President and Chief Nuclear Officer ML15287A348 OFFICE NSIR/DSO/SPEB NSIR/DSO NSIR/DSO/SPEB RIII NSIR/DSO/SPEB NAME P. Coughlin J. Clark D. Johnson S. Orth C. Johnson DATE 10/07/15 10/9/15 10/08/15 10/1415 10/15/15 for