05000327/FIN-2012003-03
From kanterella
Revision as of 10:45, 30 May 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Finding | |
---|---|
Title | Licensee-Identified Violation |
Description | The violation referenced in Section 4OA5.2 was identified by the licensee and meets the criteria of Section 2.3.2.b of the NRC Enforcement Policy for characterization as a Non- Cited Violation. This issue is in the licensees CAP as PER 452027, MPC Forced Helium Dehydration Calculation Methodology. This is a Severity Level IV violation and is being treated as a non-cited violation (NCV), consistent with Section 2.3.2.b of the NRC Enforcement Policy; specifically, the violation was identified by the licensee, the issue was placed into the licensees CAP, the violation was not repetitive as a result of inadequate corrective action, and the violation was not willful. Documents reviewed are listed in the Attachment. |
Site: | Sequoyah |
---|---|
Report | IR 05000327/2012003 Section 4OA7 |
Date counted | Jun 30, 2012 (2012Q2) |
Type: | TEV: Severity level IV |
cornerstone | Mitigating Systems |
Identified by: | Licensee-identified |
Inspection Procedure: | |
Inspectors (proximate) | S Shaeffer C Young R Carrion W Deschaine |
INPO aspect | |
' | |
Finding - Sequoyah - IR 05000327/2012003 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Sequoyah) @ 2012Q2
Self-Identified List (Sequoyah)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||