| Q | CCA | Title |
---|
05000263/FIN-2010004-01 | 2010Q3 | H.5 | Inadequate Electrical Isolation during Demolition Activity |
05000263/FIN-2010007-01 | 2010Q4 | | HELB Analysis Potentially Non-Conservative |
05000263/FIN-2010005-01 | 2010Q4 | H.8 | Failure to Properly Store Loose Material in Close Proximity to Safety Related Equipment |
05000263/FIN-2010005-02 | 2010Q4 | P.2 | Failure to Implement Corrective Actions to Address a Deficiency Associated with the Door Interlock on Airlock 413 |
05000263/FIN-2011003-02 | 2011Q1 | | Failure to Update USAR for Cask Lift Height Restrictions |
05000263/FIN-2011002-01 | 2011Q1 | H.5 | Inadequate System Isolation during Check Valve Maintenance |
05000263/FIN-2011002-03 | 2011Q1 | H.8 | Failure to Control a Level 1 FME Area during New Fuel Receipt Activities |
05000263/FIN-2011003-01 | 2011Q1 | H.2 | Poor Maintenance Practices Result in CV-3490 Failing Shut |
05000263/FIN-2011003-03 | 2011Q1 | | Failure to Update USAR for Cask Lift Height Restrictions |
05000263/FIN-2011003-04 | 2011Q1 | H.5 | Failure to Maintain Radiation Exposure ALARA During Inboard Main Steam Isolation Valve Repair |
05000263/FIN-2011003-05 | 2011Q1 | H.14 | Inadequate C.1 Startup Procedure Review |
05000263/FIN-2011002-02 | 2011Q1 | | Calculation of Work Hours during Fatigue Rule Implementation |
05000263/FIN-2011002-05 | 2011Q1 | | Containment Overpressure Not Ensured in the Appendix R Analysis |