| Q | CCA | Title |
---|
05000266/FIN-2014002-01 | 2014Q1 | | A Failure to Provide Sufficient Field Overlap to Ensure 100 Percent Coverage |
05000266/FIN-2014002-02 | 2014Q1 | | A Failure to Measure Interpass Temperature |
05000266/FIN-2014002-03 | 2014Q1 | | Failure to Perform Flood Reviews of Material That Could Affect Flood Relief Paths |
05000266/FIN-2014007-01 | 2014Q1 | | Failure to Take Corrective Actions to Address External Flooding Procedure Deficiencies |
05000266/FIN-2014007-02 | 2014Q1 | P.3 | Failure to Maintain External Flooding Procedure to Address All Possible CLB Floods |
05000266/FIN-2014007-04 | 2014Q1 | P.2 | Failure to Perform a Required 10 CFR Part 50.59 Evaluation |
05000266/FIN-2014007-05 | 2014Q1 | P.2 | Failure to Establish EFR Attributes to Assess the Effectiveness of Corrective Actions |
05000266/FIN-2014007-03 | 2014Q1 | | Failure to Perform a Required 10 CFR Part 50.59 Evaluation |
05000301/FIN-2014003-01 | 2014Q2 | H.9 | Failure to Maintain Control of Loose Material in Containment |
05000266/FIN-2014003-02 | 2014Q2 | P.3 | Age Related Relay Failures Result in Inoperable Inverters |
05000266/FIN-2014004-02 | 2014Q3 | H.12 | Failure to Perform Required Fire Watch Inspections |
05000266/FIN-2014004-03 | 2014Q3 | H.14 | Deficiencies in Calculation Performed to Support Containment Dome Truss Operability |
05000266/FIN-2014004-01 | 2014Q3 | H.8 | Failure to Identify Degraded Water Sprinkler System |
05000266/FIN-2014004-04 | 2014Q3 | P.1 | Incomplete Prompt Operability Determination of Non-Seismic Block Wall |
05000301/FIN-2014005-01 | 2014Q4 | H.5 | Failure to Promptly Correct a Failed Emergency Diesel Generator Day Tank Room Heater |