Millstone Power Station, Units 2 and 3 - Notification of Action Completion for Confirmatory Order EA-17-077 - Item D.2
ML18109A041
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 04/12/2018
From: Stoddard D G
Dominion Energy Nuclear Connecticut
To:
Document Control Desk, NRC Region 1
References
17-465D, EA-17-077
Download: ML18109A041 (2)


Text

.... Dominion Energy Nuclear Connecticut, Inc. 5000 Dominion Boulevard, Glen Allen, VA 23060 DominionEnergy.com U.S .. Nuclear R~gulatory Commission Regional Administrator, Region I 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2_713 April 12, 2018 DOMINION ENERGY NUCLEAR CONNECTICUT, INC. MILLSTONE POWER STATION UNITS 2 AND 3 [fie Dominion Energv Serial No.

  • NSSLffFO Docke*t Nos. License Nos. 17-4650 R1 50-336 50-423 DPR-65 NPF-49 NOTIFICATION OF ACTION COMPLETION FOR CONFIRMATORY ORDER EA-1.7-077 -ITEM D.2 On November 21, 2017, the Nuclear Regulatory Commission (NRG) issued 'confirmatory Order EA-17-077 to Dominion Energy Nuclear Connecticut, Inc. (DENG).Section V of the Confirmatory Order requires DENG to complete Item 0.2 within 90 days of completing item D.11, and to notify the NRC in writing within 30 days of Item 0.2 completion. On March 9, 2018, DENG evaluated the implementation of the Armorer function at Millstone Power Station (MPS) per Item 0.1. On March 23, 2018, communication of evaluation results to Security Personnel was completed. As specified in Item 0.2, the content of the communication is available to the NRC for review during an. inspection. If you have* any questions concerning this matter, please contact Michael Whitlock at (804) 273-3123. Sincerely, Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Dominion Energy Nuclear Connecticut, Inc. Commitments made in this letter: None 1 Notification to the NRC of the completion of Item D.1 was provided to the NRC on March 28, 2018 * .(Serial No. 17-465C).
  • ~ Serial No. 17-4650 cc: U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Richard V. Guzman Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C 2 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station Docket Nos. 50-336/423 Page 2 of 2